公務(wù)員期刊網(wǎng) 精選范文 對(duì)水利水電工程的認(rèn)識(shí)范文

對(duì)水利水電工程的認(rèn)識(shí)精選(九篇)

前言:一篇好文章的誕生,需要你不斷地搜集資料、整理思路,本站小編為你收集了豐富的對(duì)水利水電工程的認(rèn)識(shí)主題范文,僅供參考,歡迎閱讀并收藏。

對(duì)水利水電工程的認(rèn)識(shí)

第1篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞: 水利水電工程; 施工質(zhì)量; 質(zhì)量控制; 重要性; 要點(diǎn);

Abstract: With the rapid development of water conservancy and hydropower career in China, the number of water conservancy and hydropower projects is increasing. For how to ensure the construction quality of water conservancy and hydropower projects, it is very important to do a good job in quality control. From the current overall situation of the construction quality control of water conservancy and hydropower projects, although it has made progress compared with the past, it still has shortcomings. This paper studies and discusses it. Based on the brief analysis of the importance of construction quality control of water conservancy and hydropower projects, this paper mainly analyzes the existing problems, and puts forward the working points on how to do a good job in the construction quality control of water conservancy and hydropower projects.

Keyword: water conservancy and hydropower projects; construction quality; quality control; importance; key points;

1、 引言

隨著我國(guó)經(jīng)濟(jì)的快速發(fā)展,我國(guó)對(duì)水利水電事業(yè)給予了高度重視,特別是在我國(guó)更加高度重視水利水電工程建設(shè)的今天,對(duì)水利水電工程施工質(zhì)量提出了新的更高的要求,需要大力加強(qiáng)質(zhì)量控制體系建設(shè),并且要提高質(zhì)量控制的整體水平。從當(dāng)前水利水電工程施工質(zhì)量控制的整體情況來(lái)看,盡管與過(guò)去相比有了一定的進(jìn)步和提高,而且也取得了一定的成效,但由于種種原因,水利水電工程施工質(zhì)量控制仍然存在很多問題和矛盾,特別是在開展施工的過(guò)程中還存在對(duì)質(zhì)量控制重視不足的問題,在很大程度上制約了水利水電工程施工的有效推進(jìn)。因此,在開展水利水電工程施工的過(guò)程中,要對(duì)施工質(zhì)量控制的重要性有清醒的理解和認(rèn)識(shí),并且堅(jiān)持問題導(dǎo)向和系統(tǒng)思維,著眼于解決水利水電工程施工質(zhì)量控制存在的問題,采取切實(shí)有效的方法加強(qiáng)水利水電工程施工質(zhì)量控制,努力提升水利水電工程施工的整體水平。

2 水利水電工程施工質(zhì)量控制的重要性

水利水電工程普遍規(guī)模較大,而且很多水利水電工程施工難度較大,只有大力加強(qiáng)施工質(zhì)量控制,才能使水利水電工程取得更好的成效。這就需要在開展水利水電工程施工的過(guò)程中,深刻認(rèn)識(shí)到優(yōu)化和完善水利水電工程施工質(zhì)量控制的重要性,從而在開展水利水電工程施工的過(guò)程中更加重視施工質(zhì)量控制并取得突破。通過(guò)大力加強(qiáng)水利水電工程施工質(zhì)量控制工作,能夠使水利水電工程更具有科學(xué)性,如在檢查的過(guò)程中切實(shí)加強(qiáng)對(duì)“人”的控制,進(jìn)一步健全和完善檢查人員培訓(xùn)機(jī)制,提高其專業(yè)能力,進(jìn)而使水利水電工程施工取得更好的成效;通過(guò)大力加強(qiáng)水利水電工程施工質(zhì)量控制工作,還有利于提高水利水電工程施工的整體水平,如通過(guò)有效的方法和措施解決施工技術(shù)自身存在的缺陷,使施工技術(shù)得到優(yōu)化和提升;通過(guò)大力加強(qiáng)水利水電工程施工質(zhì)量控制工作,有利于更有效地解決施工過(guò)程中存在的問題,并采取有效的措施進(jìn)行優(yōu)化,進(jìn)而能夠更有針對(duì)性地加以整改和落實(shí),最終更有效地保障水利水電工程的施工質(zhì)量。總之,在開展水利水電工程施工的過(guò)程中,只有大力加強(qiáng)施工質(zhì)量控制工作,才能使水利水電工程取得更好的成效,既有利于保障質(zhì)量,也有利于確保進(jìn)度,更能夠強(qiáng)化安全。

3、 水利水電工程施工質(zhì)量控制存在的問題

從水利水電工程施工質(zhì)量控制的整體情況來(lái)看,盡管絕大多數(shù)企業(yè)對(duì)此都給予了一定的重視,但在具體的實(shí)施過(guò)程中仍然存在一些不足之處,導(dǎo)致水利水電工程施工質(zhì)量控制受到了影響。有的單位在開展水利水電工程施工質(zhì)量控制方面缺乏理念創(chuàng)新,不注重落實(shí)“以人為本”理念,在施工質(zhì)量控制方面缺乏系統(tǒng)的設(shè)計(jì)和科學(xué)的安排,特別是不注重“人”這個(gè)關(guān)鍵因素,在對(duì)施工人員進(jìn)行質(zhì)量方面的教育培訓(xùn)不到位,導(dǎo)致出現(xiàn)了很多質(zhì)量問題;有的單位在開展水利水電工程施工質(zhì)量控制方面缺乏體系建設(shè),對(duì)施工質(zhì)量控制工作的全面性、全員性、全程性建設(shè)缺乏科學(xué)設(shè)計(jì)和系統(tǒng)安排,同時(shí),也沒有建立比較完善的水利水電工程施工質(zhì)量控制制度,制度的執(zhí)行力也相對(duì)薄弱,這必然會(huì)導(dǎo)致水利水電工程施工質(zhì)量控制無(wú)法取得實(shí)實(shí)在在的成效;有的單位在開展水利水電工程施工質(zhì)量控制方面缺乏模式創(chuàng)新,仍主要采取傳統(tǒng)的控制模式,在應(yīng)用信息技術(shù)等諸多方面不夠到位,而且也沒有建立水利水電工程施工“風(fēng)險(xiǎn)點(diǎn)”監(jiān)測(cè)機(jī)制,直接導(dǎo)致水利水電工程施工質(zhì)量控制的針對(duì)性不強(qiáng),進(jìn)而制約了水利水電工程施工質(zhì)量控制工作向縱深開展。

4 、水利水電工程施工質(zhì)量控制的工作要點(diǎn)

4.1、 創(chuàng)新水利水電工程施工質(zhì)量控制理念

創(chuàng)新是進(jìn)步的靈魂,理念是行動(dòng)的先導(dǎo)。在開展水利水電工程施工的過(guò)程中,經(jīng)常會(huì)出現(xiàn)質(zhì)量問題,深入分析其原因,主要包括施工人員自身水平所限、缺少有效的質(zhì)量管理工作、施工設(shè)備自身存在技術(shù)缺陷,等等。這就需要進(jìn)一步創(chuàng)新水利水電工程施工質(zhì)量控制理論,只有這樣,才能使水利水電工程施工質(zhì)量得到保障。因而,應(yīng)當(dāng)深刻認(rèn)識(shí)到加強(qiáng)和改進(jìn)水利水電工程施工質(zhì)量控制重要性的認(rèn)識(shí),并采取切實(shí)有效的措施加以優(yōu)化。在具體的實(shí)施過(guò)程中,應(yīng)當(dāng)把水利水電工程施工質(zhì)量控制上升到戰(zhàn)略層面,著眼于提升水利水電工程整體水平,進(jìn)一步優(yōu)化和完善施工質(zhì)量控制機(jī)制,切實(shí)抓好“人”這個(gè)重要因素,在保證施工技術(shù)、施工材料、施工設(shè)備質(zhì)量的基礎(chǔ)上,切實(shí)加強(qiáng)對(duì)水利水電工程施工人員的教育和培訓(xùn),最大限度提高其專業(yè)素質(zhì)、職業(yè)精神和道德水準(zhǔn),進(jìn)而使其在開展水利水電工程施工的過(guò)程中更加重視質(zhì)量。

4.2 、完善水利水電工程施工質(zhì)量控制體系

對(duì)于開展水利水電工程施工質(zhì)量控制來(lái)說(shuō),要在健全和完善施工質(zhì)量控制體系方面狠下功夫,努力使施工質(zhì)量控制更具有系統(tǒng)性、全面性和效能性。在具體的實(shí)施過(guò)程中,應(yīng)當(dāng)大力加強(qiáng)組織體系建設(shè),加強(qiáng)對(duì)水利水電工程施工質(zhì)量控制的組織和領(lǐng)導(dǎo),強(qiáng)化水利水電工程施工資源的有效融合,確保水利水電工程施工設(shè)備等的安全性和可靠性。完善水利水電工程施工質(zhì)量控制體系,還要進(jìn)一步健全和完善水利水電工程施工質(zhì)量控制制度,并且牢固樹立“三全原則”,即在全面控制、全員控制、全程控制方面狠下功夫,同時(shí),要進(jìn)一步強(qiáng)化水利水電工程施工質(zhì)量控制制度的執(zhí)行力建設(shè),努力使施工質(zhì)量控制制度發(fā)揮更加積極有效的功能和作用。在完善水利水電工程施工質(zhì)量控制體系的過(guò)程中,要構(gòu)建多元化的資源綜合利用體系,如施工單位應(yīng)當(dāng)加強(qiáng)與監(jiān)理單位的戰(zhàn)略合作,彌補(bǔ)自身在水利水電工程施工質(zhì)量控制方面的不足。

4.3、 優(yōu)化水利水電工程施工質(zhì)量控制模式

對(duì)于開展水利水電工程來(lái)說(shuō),要想更加有效地做好施工質(zhì)量控制工作,要進(jìn)一步優(yōu)化水利水電工程施工質(zhì)量控制模式,最大限度提升有效性。在具體的實(shí)施過(guò)程中,應(yīng)當(dāng)大力推行“互聯(lián)網(wǎng)+水利水電工程”模式,將信息技術(shù)、網(wǎng)絡(luò)技術(shù)、智能技術(shù)等應(yīng)用于水利水電工程當(dāng)中,如運(yùn)用計(jì)算機(jī)系統(tǒng)特別是大數(shù)據(jù)技術(shù)對(duì)水利水電工程施工進(jìn)行全過(guò)程跟蹤,進(jìn)而對(duì)如何更有效地開展水利水電工程施工質(zhì)量控制作出科學(xué)安排,通過(guò)“可追溯性”建設(shè),強(qiáng)化管理人員、施工人員等方方面面人員的責(zé)任意識(shí)。優(yōu)化水利水電工程施工質(zhì)量控制模式,也要進(jìn)一步強(qiáng)化風(fēng)險(xiǎn)控制,如建立水利水電工程施工質(zhì)量“風(fēng)險(xiǎn)點(diǎn)”監(jiān)測(cè)機(jī)制,加強(qiáng)監(jiān)督檢查,強(qiáng)化風(fēng)險(xiǎn)管理工作。要進(jìn)一步優(yōu)化和完善水利水電工程施工質(zhì)量控制方法,除了要建立專門的“項(xiàng)目部”之外,也要在水利水電工程施工質(zhì)量控制方面進(jìn)行科學(xué)設(shè)計(jì)與謀劃,如建立目標(biāo)責(zé)任制、加強(qiáng)水利水電工程施工質(zhì)量管理的激勵(lì)和約束等,從而使其發(fā)揮較好的質(zhì)量控制作用。

5 、結(jié)語(yǔ)

綜上所述,加強(qiáng)水利水電工程施工質(zhì)量控制具有十分重要的意義,既有利于進(jìn)一步提升水利水電工程單位的施工能力,同時(shí),也能夠?yàn)樗姽こ淌┕と〉酶玫某尚?chuàng)造良好的條件。這就需要在開展水利水電工程施工的過(guò)程中,一定要深刻認(rèn)識(shí)到施工質(zhì)量控制的重要性,采取切實(shí)有效的措施提升施工質(zhì)量控制水平,重點(diǎn)在創(chuàng)新水利水電工程施工質(zhì)量控制理念、完善水利水電工程施工質(zhì)量控制體系、優(yōu)化水利水電工程施工質(zhì)量控制模式等諸多方面努力,推動(dòng)水利水電工程施工質(zhì)量控制取得更好成效。

參考文獻(xiàn)

[1]王龍.水利水電工程管理及施工質(zhì)量控制問題分析[J].農(nóng)業(yè)科技與信息,2020(16):118-119.

第2篇:對(duì)水利水電工程的認(rèn)識(shí)范文

【關(guān)鍵詞】:水利水電;工程建設(shè);生態(tài)環(huán)境;負(fù)面影響

Abstract: with the constant progress of the society, people in the course of transforming nature, also began to pay attention to improvement activities on the natural environment has brought negative influence. This article will analyze the water conservancy and hydropower project construction on ecological environment, for your reference to learning to use.

Key words: water conservancy and hydropower; project; ecological environment; negative impact

中圖分類號(hào)TV5 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):

隨著經(jīng)濟(jì)的不斷發(fā)展、人口的不斷增多及我國(guó)水資源的季節(jié)和區(qū)域分布的不均勻,我國(guó)在未來(lái)一段時(shí)間內(nèi)將面臨水資源短缺、電力供應(yīng)緊張的問題,為了解決這些難題,修建大型的水利水電工程是一個(gè)很好的選擇。然而,修建大型水利水電工程對(duì)生態(tài)環(huán)境的影響問題已經(jīng)受到了廣泛的關(guān)注。在這種情況下,就要正確處理水利水電工程與生態(tài)環(huán)境的關(guān)系,確保人類改造自然而不違背自然的規(guī)律,達(dá)到人與自然的和諧共處,促進(jìn)我國(guó)水電事業(yè)快速健康地發(fā)展。以下內(nèi)容將氣候、水文、水體、地質(zhì)、土壤及生物物種方面分析水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響,以供大家學(xué)習(xí)參考之用。

一、水利水電建設(shè)對(duì)生態(tài)環(huán)境的影響

生態(tài)環(huán)境是指影響人類生存與發(fā)展的水資源、土地資源、生物資源以及氣候資源數(shù)量與質(zhì)量的總稱,是關(guān)系到社會(huì)和經(jīng)濟(jì)持續(xù)發(fā)展的復(fù)合生態(tài)系統(tǒng)。由于水利水電工程特別是大型水利水電工程的修建,改變了水域環(huán)境,必將對(duì)生態(tài)環(huán)境造成一定的影響,下面將簡(jiǎn)要進(jìn)行分析介紹。

1.1、對(duì)氣候的影響

由于區(qū)域性氣候受大氣環(huán)流的控制,而修建大型水利水電工程,原來(lái)的陸地變成了水體或者濕地,改變了原來(lái)的區(qū)域性環(huán)境,對(duì)局部小氣候會(huì)產(chǎn)生一定的影響,主要表現(xiàn)在對(duì)氣溫、降雨的影響。

在大型水利水電工程建成后,在庫(kù)區(qū),原來(lái)的陸地變成了水面,其與空氣間的能量交換強(qiáng)度和方式發(fā)生了較大的變化,導(dǎo)致年平均氣溫略有上升。大型水利水電工程的修建對(duì)降雨量也有很大的影響,這主要表現(xiàn)在如下幾個(gè)方面:第一,由于修建水庫(kù),原來(lái)的陸地變成了大面積的湖波,其蒸發(fā)量將大量增加,導(dǎo)致水庫(kù)區(qū)域降水量有所增加;第二,由于水庫(kù)低溫效應(yīng)的影響,使水庫(kù)地區(qū)的降雨量有所減少,而在一定距離外的區(qū)域降雨量有所增加,導(dǎo)致了降水區(qū)域分布發(fā)生了變化;第三,水利水電工程的建成,導(dǎo)致了降雨時(shí)間的分布發(fā)生了變化,特別是對(duì)于云南這樣的南方水庫(kù),夏季水面溫度低于氣溫,氣層穩(wěn)定,大氣對(duì)流減弱,降雨量減少,而在冬季,由于水面的溫度高于氣溫,大氣的對(duì)流作用增強(qiáng),降雨量增加。

1.2、對(duì)水文的影響

建設(shè)水利水電工程的目的是為社會(huì)經(jīng)濟(jì)的發(fā)展服務(wù),在其修成后,需要在時(shí)間和空間上調(diào)整下游河道的流量,特別是很多水利水電工程在非汛期也截流了大量的水資源,從而使下游河道的水位大幅度下降,甚至斷流,以致引起了一系列的生態(tài)環(huán)境問題。比如,下游天然湖泊干涸,必然給湖泊天然生物帶來(lái)極大的影響;由于水量的降低,水流的減緩,很多泥沙在河口淤積,造成了海水倒灌現(xiàn)象的發(fā)生。

1.3、泥沙的淤積問題

泥沙的大量淤積,造成了河道兩岸的地下水位的上升,必將導(dǎo)致河道兩岸農(nóng)田的次生鹽堿化。

1.4、對(duì)水體的影響

水只有在流動(dòng)過(guò)程中才能增加其凈化能力,而修建水利水電工程后,大量水停留在水庫(kù)中,導(dǎo)致水質(zhì)變差,這是因?yàn)閹?kù)內(nèi)的水流流速一般比較小,致使水面與氣面交換的速率及污染物的擴(kuò)散能力都有所降低,這種情況下,水體的復(fù)氧能力減弱,最終形成水庫(kù)中水的自凈能力降低的結(jié)果。另外還存在由于藻類的大量生長(zhǎng)導(dǎo)致的富營(yíng)養(yǎng)化等問題。

1.5、對(duì)地質(zhì)的影響

大型水利水電設(shè)施一般都要修建大型的水壩以用來(lái)積蓄水源,而水壩的建成可能會(huì)引發(fā)地震等不良地質(zhì)災(zāi)害。水庫(kù)誘發(fā)地震主要是因?yàn)榫薮篌w積的蓄水增加了水壓,以及在這種水壓下巖石裂隙和斷裂面產(chǎn)生,使巖層和地殼內(nèi)原有的地應(yīng)力平衡狀態(tài)被改變。世界上最出名的水庫(kù)誘發(fā)地震發(fā)生在1960年建成的意大利的韋奧特水庫(kù),開始蓄水后地震開始直線上升,最終導(dǎo)致水庫(kù)旁的山峰崩塌,3.5億方巖石崩入水庫(kù),形成高出壩頂110米的巨浪并導(dǎo)致潰壩,使下游村鎮(zhèn)死亡2600人。

1.6、對(duì)土壤的影響

盡管水利水電工程的建設(shè)有利于水土保持,但是其也引起土壤的鹽堿化。比如:埃及的阿斯旺大壩建成后,造成了沿河流域可耕地的土質(zhì)肥力持續(xù)下降,沿尼羅河兩岸出現(xiàn)了土壤鹽堿化。產(chǎn)生土壤鹽堿化的原因是庫(kù)岸滲漏補(bǔ)給地下水經(jīng)毛細(xì)管作用升至地表,在強(qiáng)烈蒸發(fā)作用下使水中鹽分濃集于地表,形成鹽堿化。另外在浸沒區(qū),因土壤中的通氣條件差,而造成土壤中的微生物活動(dòng)減少,肥力下降,影響作物的生長(zhǎng)。

1.7、對(duì)生物的影響

大型水利水電工程的建設(shè),對(duì)魚類特別是洄游性魚類的影響是相當(dāng)大的,中華鱘的產(chǎn)卵期在10月中旬至11月上旬,當(dāng)長(zhǎng)江三峽工程建成運(yùn)行后,10月份水庫(kù)將大量蓄水,將水庫(kù)水位從145米提高到175米,使下泄流量顯著減少,10月平均流量較建壩前減少了41%,這將使本來(lái)就不大的中華鱘宜昌產(chǎn)卵場(chǎng)的面積進(jìn)一步縮小,使中華鱘的自然繁殖受到更為不利的影響。另外水利水電工程的建設(shè)導(dǎo)致了原有植被的大量死亡,而水生藻類卻大量繁殖生長(zhǎng),嚴(yán)重影響了生物的多樣性。

二、應(yīng)正視水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響

實(shí)踐證明,水利水電工程的建設(shè)對(duì)國(guó)民經(jīng)濟(jì)的建設(shè)起著非常重要的作用,但是隨著經(jīng)濟(jì)社會(huì)的高度發(fā)展,水利水電工程的負(fù)面影響開始受到人們的關(guān)注,人們開始重新審視水利水電工程的建設(shè)。對(duì)于水利水電工程的建設(shè),我們應(yīng)該正視其對(duì)生態(tài)環(huán)境的硬性,應(yīng)該堅(jiān)持用科學(xué)的發(fā)展觀統(tǒng)領(lǐng)新時(shí)期的水利水電工程建設(shè),實(shí)現(xiàn)其可持續(xù)發(fā)展。

2.1、正確認(rèn)識(shí)社會(huì)輿論對(duì)水利水電工程建設(shè)對(duì)生態(tài)環(huán)境影響的關(guān)注

社會(huì)輿論對(duì)水利水電工程建設(shè)對(duì)生態(tài)環(huán)境影響的關(guān)注是社會(huì)進(jìn)步的一個(gè)重要表現(xiàn),關(guān)注生態(tài),是經(jīng)濟(jì)社會(huì)高度發(fā)展到一定階段后人們思想認(rèn)識(shí)的不斷提升所帶來(lái)的必然結(jié)果。而作為一名水利水電技術(shù)人員,我們應(yīng)該比以前更加重視水利水電建設(shè)對(duì)生態(tài)環(huán)境的影響問題,對(duì)社會(huì)關(guān)于其的不同看法,我們應(yīng)該持開放的態(tài)度,并在以后的實(shí)踐中盡量將對(duì)生態(tài)環(huán)境的影響降低到最低。

2.2、國(guó)際上對(duì)水利水電工程建設(shè)的看法不一致

對(duì)于大部分發(fā)達(dá)國(guó)家來(lái)說(shuō),他們不提倡建設(shè)大型水利水電工程,其理由是對(duì)生態(tài)環(huán)境的影響較大,但是經(jīng)過(guò)大量統(tǒng)計(jì)發(fā)現(xiàn),大部分發(fā)達(dá)國(guó)家的水利水電工程基本上已經(jīng)飽和,也就是說(shuō)已經(jīng)沒有再建設(shè)水利水電工程的必要性。而大部分發(fā)展中國(guó)家來(lái)說(shuō),均想通過(guò)建設(shè)水利水電工程,來(lái)促進(jìn)經(jīng)濟(jì)的良性發(fā)展。而對(duì)于我國(guó)來(lái)說(shuō),我們也應(yīng)該提倡水利水電工程的建設(shè),一來(lái)是因?yàn)槲覈?guó)的經(jīng)濟(jì)發(fā)展很快,對(duì)能源的需求很大,另外我國(guó)的水資源地域和季節(jié)上分布極為不均勻,故就我國(guó)目前的情況來(lái)看,必須建設(shè)水利水電工程,但是我們?cè)诮ㄔO(shè)水利水電工程的同時(shí),也開始關(guān)注水利水電工程對(duì)生態(tài)環(huán)境的影響,應(yīng)采取必要措施將其對(duì)生態(tài)環(huán)境的影響降低到最低限度。

2.3、正確認(rèn)識(shí)水利水電工程的區(qū)域性

在建設(shè)水利水電工程前應(yīng)做好生態(tài)環(huán)境評(píng)估報(bào)告,進(jìn)行具體問題具體分析,確實(shí)不適合建立水利水電工程的河流、河段,嚴(yán)禁進(jìn)行水利水電工程建設(shè),而經(jīng)過(guò)生態(tài)環(huán)境評(píng)估后,可以進(jìn)行建設(shè)的地方,應(yīng)進(jìn)行水利水電工程的建設(shè)。所以對(duì)水利水電工程的建設(shè)不能一概的否定。

對(duì)我國(guó)來(lái)說(shuō),僅僅正視水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響是遠(yuǎn)遠(yuǎn)不夠的,還需要通過(guò)法律法規(guī)來(lái)規(guī)范水利水電工程的建設(shè),將加強(qiáng)地區(qū)的生態(tài)建設(shè)與環(huán)境保護(hù)作為根本點(diǎn)和切入點(diǎn),對(duì)嚴(yán)重破壞和影響生態(tài)環(huán)境、自然保護(hù)區(qū)和世界遺產(chǎn)的水利水電工程項(xiàng)目,應(yīng)該進(jìn)行嚴(yán)格的評(píng)估和審查,不符合要求的嚴(yán)禁開工建設(shè)。 三、結(jié)束語(yǔ)

作為水利水電工程的技術(shù)人員,應(yīng)該正確對(duì)待水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響,應(yīng)該勇于挑起水利水電工程建設(shè)和生態(tài)環(huán)境保護(hù)兩個(gè)重?fù)?dān),針對(duì)我國(guó)目前的情況來(lái)看,應(yīng)該兩手抓,兩手都要硬,以促進(jìn)我國(guó)水利水電工程建設(shè)和生態(tài)環(huán)境保護(hù)的和諧相處,為促進(jìn)我國(guó)經(jīng)濟(jì)和生態(tài)的共同發(fā)展做出應(yīng)有的貢獻(xiàn)。

【參考文獻(xiàn)】

[1]《水利水電開發(fā)項(xiàng)目生態(tài)環(huán)境保護(hù)研究與實(shí)踐》中國(guó)環(huán)境科學(xué)出版社

[2]《水利水電工程生態(tài)環(huán)境影響評(píng)價(jià)技術(shù)研究》劉勝祥等,中國(guó)環(huán)境科學(xué)出版社

第3篇:對(duì)水利水電工程的認(rèn)識(shí)范文

摘 要:水利水電工程是當(dāng)前社會(huì)中的一個(gè)重要工程,對(duì)于人們的日常生活有著很大的影響。不過(guò),在水利水電工程中,會(huì)對(duì)生態(tài)環(huán)境造成一定的影響,因此需要采取有效的措施進(jìn)行生態(tài)環(huán)境保護(hù),確保水利水電工程能夠帶來(lái)更好的經(jīng)濟(jì)、社會(huì)、環(huán)境效益?;诖?,本文探討了水利水電工程的意義,分析了水利水電工程對(duì)生態(tài)環(huán)境的影響,并提出了相應(yīng)的保護(hù)對(duì)策。

關(guān)鍵詞:水利水電工程;生態(tài)環(huán)境;影響;保護(hù)對(duì)策

前言:在當(dāng)前的社會(huì)當(dāng)中,水利水電工程發(fā)揮著巨大的作用,在生活用水、預(yù)防洪災(zāi)、水運(yùn)、發(fā)電等方面,都具有重要的意義。不過(guò),水利水電工程雖然能夠?yàn)槿藗儙?lái)較大的益處,但同時(shí)也會(huì)對(duì)人們賴以生存的生態(tài)環(huán)境造成較大的影響。對(duì)此,在水利水電工程建設(shè)發(fā)展的同時(shí),應(yīng)充分認(rèn)識(shí)到其對(duì)生態(tài)環(huán)境造成的影響,并采取有效的對(duì)策加以保護(hù),以確保水利水電工程的可持續(xù)發(fā)展。

一、水利水電工程的重要意義

在當(dāng)前的社會(huì)發(fā)展及人們的生活當(dāng)中,水利水電工程都具有十分重要的意義。我國(guó)水資源儲(chǔ)量較為豐富,早在戰(zhàn)國(guó)時(shí)期,就開發(fā)了著名的都江堰水利工程。水利水電工程具有水利調(diào)配、防洪、發(fā)電、灌溉等多種功能,在境綜合治理、生態(tài)保護(hù)、航運(yùn)、漁業(yè)、旅游、城市供水等領(lǐng)域,都發(fā)揮著重要的作用,具有較高的經(jīng)濟(jì)效益和社會(huì)效益[1]。水電資源是一種綠色資源,在當(dāng)前世界能源危機(jī)的環(huán)境下,大力開發(fā)利用水力資源,對(duì)于我國(guó)經(jīng)濟(jì)發(fā)展具有重要意義。例如南水北調(diào)工程,不但發(fā)揮著流域防洪的作用,同時(shí)還具備水量調(diào)配的功能,對(duì)于國(guó)家能源供應(yīng)也有著較大的意義。因此,在人們的日常生活與生產(chǎn),乃至國(guó)家的發(fā)展當(dāng)中,水利水電工程都具有重要的意義。

二、水利水電工程對(duì)生態(tài)環(huán)境的影響

雖然水利水電工程具備較高的意義和價(jià)值,但是其作為一項(xiàng)人為工程,難免會(huì)對(duì)自然生態(tài)環(huán)境造成影響。水利水電工程的建設(shè),淹沒庫(kù)區(qū)土地,對(duì)周圍陸路生態(tài)環(huán)境造成較大的影響,同時(shí)對(duì)周圍的氣候因子、降水量、氣候等,也都有著不同程度的影響。水利水電工程和周圍水庫(kù),會(huì)將地表植被淹沒,加重了生態(tài)破壞和水土流失。自然水文條件與物種分布有著密切的關(guān)系,湖泊、河流、支流、干流等,都會(huì)對(duì)生物數(shù)量、種群產(chǎn)生影響。而水利水電工程的建設(shè),會(huì)導(dǎo)致這些水文條件的變化,進(jìn)而對(duì)生態(tài)系統(tǒng)的完整性造成影響。在水利水電工程中,需要建設(shè)較多的水庫(kù)和蓄水池,因而局部地區(qū)的蒸發(fā)量將會(huì)大幅增加,使得周圍氣候溫潤(rùn)、空氣潮濕[2]。庫(kù)區(qū)及周圍降水量降低,但附近相鄰區(qū)域降水量會(huì)明顯增加。此外,水電站的建設(shè),會(huì)導(dǎo)致庫(kù)區(qū)流水生物環(huán)境受到影響,魚類的誘餌料發(fā)生變化,同時(shí)水質(zhì)、水溫、水文等條件都發(fā)生了變化,在庫(kù)區(qū)段,一些漂流性卵魚類將會(huì)小時(shí),流動(dòng)性產(chǎn)卵魚類數(shù)量也會(huì)大幅減少。而靜水生活的魚類將會(huì)在庫(kù)區(qū)段數(shù)量增加,逐漸發(fā)展為優(yōu)勢(shì)魚種。在高壩溢流泄洪的過(guò)程中,高速水流會(huì)增加水中氮氧化合物含量,從而對(duì)魚類產(chǎn)生不良的影響。

三、水利水電工程中生態(tài)環(huán)境保護(hù)對(duì)策

由于水利水電工程會(huì)對(duì)生態(tài)環(huán)境造成較大的影響,因此,應(yīng)當(dāng)注重采取有效的對(duì)策加以保護(hù)。首先應(yīng)對(duì)環(huán)境影響評(píng)估機(jī)制進(jìn)行就愛努力,在水利水電工程建設(shè)當(dāng)中,評(píng)估其會(huì)對(duì)周圍水質(zhì)、土質(zhì)等造成的破壞程度,并評(píng)估對(duì)周邊氣候環(huán)境、陸生及水生生物生長(zhǎng)環(huán)境的破壞程度。以此為基礎(chǔ),提前制定相應(yīng)的應(yīng)對(duì)措施和保護(hù)方案。通過(guò)環(huán)境影響評(píng)估機(jī)制,對(duì)適當(dāng)?shù)乃姽こ涛恢眠M(jìn)行選擇,從而最大限度降低對(duì)生態(tài)環(huán)境的影響。在水利水電工程建設(shè)過(guò)程中,應(yīng)當(dāng)嚴(yán)格遵守環(huán)境保護(hù)優(yōu)先的原則,合理的進(jìn)行工程建設(shè)規(guī)劃。通過(guò)運(yùn)用相關(guān)法律法規(guī),加強(qiáng)法律約束,充分分析對(duì)生態(tài)環(huán)境的影響情況。同時(shí),對(duì)政府部門管理責(zé)任進(jìn)行優(yōu)化,在工程建設(shè)中充分的融入生態(tài)環(huán)境保護(hù)。

在水利水電工程選址當(dāng)中,應(yīng)當(dāng)合理的選擇施工位置,盡量減少占地面積,降低對(duì)陸生生態(tài)環(huán)境的影響。工程竣工之后,應(yīng)當(dāng)采取有效的措施,盡可能對(duì)施工中造成的生態(tài)破壞予以恢復(fù)。此外,在工程建設(shè)當(dāng)中,對(duì)于蓄水池的建設(shè),應(yīng)當(dāng)確保其能夠順利運(yùn)行[3]。應(yīng)在蓄水池當(dāng)中合理的控制水位,并在兩側(cè)對(duì)生態(tài)放水孔進(jìn)行設(shè)置,從而在排水當(dāng)中使下泄流量減少,以降低對(duì)水文情況的不良影響。應(yīng)根據(jù)當(dāng)?shù)氐膶?shí)際情況,對(duì)相應(yīng)的魚梯、魚道等進(jìn)行設(shè)置,避免對(duì)自然水體中生存的魚類造成影響。同時(shí)可選擇適當(dāng)?shù)奈恢?,?duì)魚類增殖放流站進(jìn)行修建。在水利水電工程的運(yùn)行當(dāng)中,應(yīng)當(dāng)采取科學(xué)化的調(diào)度運(yùn)行方案,對(duì)生活用水、生態(tài)用水、其它用水等進(jìn)行有效的兼顧與協(xié)調(diào)。更好的滿足居民生活用水,灌溉、發(fā)電、航運(yùn)用水等。依據(jù)環(huán)境監(jiān)測(cè)計(jì)劃,對(duì)各項(xiàng)環(huán)境要素進(jìn)行監(jiān)測(cè),從而確保水利水電工程的科學(xué)化運(yùn)行。

結(jié)論:水利水電工程是當(dāng)前社會(huì)發(fā)展建設(shè)中的一項(xiàng)重要工程,對(duì)于人們的日常生活與生產(chǎn),社會(huì)經(jīng)濟(jì)的發(fā)展建設(shè)等,都有著重要的意義。不過(guò)在水利水電工程的建設(shè)及運(yùn)行過(guò)程中,難免會(huì)對(duì)周邊生態(tài)環(huán)境造成影響。對(duì)此,應(yīng)當(dāng)充分認(rèn)識(shí)到其產(chǎn)生的各方面影響,從而采取有效的對(duì)策加以保護(hù),確保水利水電工程能夠得到可持續(xù)化的運(yùn)行。

參考文獻(xiàn):

[1]王冰玉, 劉莉. 淺談水利水電工程建設(shè)對(duì)于生態(tài)環(huán)境的影響及保護(hù)措施[J]. 科技與創(chuàng)新, 2016(20):31-32.

[2]譚文軍. 淺談水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響[J]. 城市建設(shè)理論研究:電子版, 2015(22):00228-00228.

[3]廖旭|, 諶巧紅, 周進(jìn)多. 水利水電工程建設(shè)對(duì)生態(tài)環(huán)境的影響及保護(hù)措施[J]. 科研, 2016(8):00239-00239.

第4篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞:水利水電工程;施工現(xiàn)場(chǎng)管理;技術(shù)要求

中圖分類號(hào):TV523 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1006-8937(2013)14-0167-01

水是生命之源,水與人類的生活息息相關(guān),二者既矛盾又統(tǒng)一。為解決人類與水之間的矛盾關(guān)系有了水利水電工程。水利水電施工現(xiàn)場(chǎng)管理是水利水電工程建設(shè)的重要環(huán)節(jié),關(guān)系著水利水電工程能否順利進(jìn)行。在進(jìn)行水利水電工程施工時(shí)需要格外的注意施工現(xiàn)場(chǎng)的管理,以免出現(xiàn)意外。

1 水利水電工程施工管理的地位

水利水電工程的施工不僅要有資金、技術(shù)等硬件設(shè)施的支持,還要有完善的管理軟件的支撐。水利水電工程建筑中的施工現(xiàn)場(chǎng)管理所起到的是向心力的作用,保證水利水電工程正常有序的進(jìn)行。

2 水利水電工程施工管理的特點(diǎn)

水利水電工程大部分是在自然環(huán)境相對(duì)復(fù)雜的背景中進(jìn)行操作,水利水電工程的施工周期比較長(zhǎng),耗資量也比較大,水利水電工程受地質(zhì)狀況、氣象環(huán)境、水文條件的影響很大。水利水電工程的施工具有很強(qiáng)的季節(jié)性,需要注意避開汛期,同時(shí)要注意考慮因水利工程周期過(guò)長(zhǎng)造成的原材料物價(jià)成本提高,人工成本增加,人員流動(dòng)問題等。水利水電工程施工現(xiàn)場(chǎng)的管理工作非常的復(fù)雜。是一項(xiàng)充滿挑戰(zhàn)性的工作。

3 水利水電工程施工管理的內(nèi)容

①水利水電工程施工現(xiàn)場(chǎng)的安全管理。水電水利工程建筑施工地點(diǎn)和為水利水電工程建筑施工提供服務(wù)的場(chǎng)所都可以稱為水利水電工程施工現(xiàn)場(chǎng)。水利水電工程施工現(xiàn)場(chǎng)涉及的范圍相對(duì)較大,對(duì)施工中安全的管理也相對(duì)嚴(yán)格,不允許任何一個(gè)細(xì)節(jié)存在安全問題,需采取防范措施,及時(shí)清理安全隱患,確保工程安全竣工。

②水利水電工程施工進(jìn)度的管理。水利水電工程的施工進(jìn)度管理是依照施工合同中水利水電工程開工與竣工的時(shí)間,將施工工作分項(xiàng)進(jìn)行規(guī)劃,制定詳密的工作計(jì)劃,確定工作進(jìn)度,并且交給監(jiān)理公司進(jìn)行審核。水利水電工程施工現(xiàn)場(chǎng)的管理需要建立詳細(xì)完整的施工進(jìn)度記錄,然后根據(jù)實(shí)際施工情況不斷進(jìn)行完善和改進(jìn)工程進(jìn)度,以保證在合同規(guī)定的時(shí)間內(nèi)完工,交監(jiān)理公司進(jìn)行檢驗(yàn)。

③水利水電工程施工質(zhì)量的管理。水利水電工程的施工質(zhì)量管理尤為重要,這關(guān)系著所取得的社會(huì)效益以及企業(yè)的經(jīng)濟(jì)利益問題。這就要求管理人員要嚴(yán)格把關(guān)施工質(zhì)量的要求,使企業(yè)具有強(qiáng)大的市場(chǎng)競(jìng)爭(zhēng)力。水利水電工程建筑中施工質(zhì)量管理包括對(duì)原材料設(shè)備、人員、技術(shù)等項(xiàng)目的控制,通過(guò)建全的質(zhì)量管理體系確保水利水電工程建筑中施工質(zhì)量管理工作的順利進(jìn)行。

④水利水電工程施工成本的管理。施工成本的管理是水利水電工程建筑中施工管理的重要內(nèi)容,施工成本的高低影響著施工單位所獲得的經(jīng)濟(jì)效益。施工成本的管理需要從源頭開始,即從施工的準(zhǔn)備階段開始,提高施工效率,降低浪費(fèi)現(xiàn)象,嚴(yán)格控制原材料成本,從而獲得企業(yè)經(jīng)濟(jì)效益的最大化。

4 水利水電工程施工管理中存在的問題

①工程管理責(zé)任不明確。一些水利水電工程施工現(xiàn)場(chǎng)存在的問題相對(duì)較多,施工現(xiàn)場(chǎng)沒有明確的負(fù)責(zé)人,分工不明確,管理混亂,沒有專門人進(jìn)行指導(dǎo)與監(jiān)督。由于管理的不到位將導(dǎo)致施工質(zhì)量存在安全隱患,工程無(wú)法正常按期竣工。

②個(gè)人經(jīng)驗(yàn)主義盛行。工程現(xiàn)場(chǎng)的施工與工程完工驗(yàn)收的標(biāo)準(zhǔn)是設(shè)計(jì)單位的圖紙,工程的施工必須按照設(shè)計(jì)圖紙進(jìn)行。在施工過(guò)程中出現(xiàn)設(shè)計(jì)圖紙與現(xiàn)實(shí)施工性質(zhì)不相符時(shí),一些工作人員未與圖紙的設(shè)計(jì)單位進(jìn)行協(xié)商就私自修改設(shè)計(jì)圖紙,導(dǎo)致設(shè)計(jì)圖紙與完工工程不一致,施工質(zhì)量不符合要求,影響工程的有序進(jìn)行。

③技術(shù)指導(dǎo)人員指揮不到位。水利水電工程都是比較龐大的項(xiàng)目,在水利水電工程建設(shè)的施工現(xiàn)場(chǎng)會(huì)出現(xiàn)技術(shù)指導(dǎo)人員較少,無(wú)法及時(shí)的進(jìn)行現(xiàn)場(chǎng)指導(dǎo)和管理,出現(xiàn)指揮不到位,小規(guī)模的施工單元不符合標(biāo)準(zhǔn)要求,影響整個(gè)工程的施工質(zhì)量。

④現(xiàn)場(chǎng)施工測(cè)試不到位。在水利水電工程的施工過(guò)程中需要定期進(jìn)行抽樣檢測(cè),分析現(xiàn)場(chǎng)施工的質(zhì)量水平。有施工單位為趕工期,不進(jìn)行現(xiàn)場(chǎng)的施工測(cè)試,出現(xiàn)混凝土的配置不符合要求,地基不穩(wěn)、灌漿壓力不夠的現(xiàn)象,給工程埋下安全隱患,威脅到項(xiàng)目的整體建設(shè)和運(yùn)營(yíng)后的人身財(cái)產(chǎn)安全。

5 加強(qiáng)水利水電工程建筑中施工現(xiàn)場(chǎng)管理的措施

①加強(qiáng)水利水電工程施工現(xiàn)場(chǎng)的安全管理。水利水電工程建筑中施工現(xiàn)場(chǎng)的安全管理需要在以下三個(gè)方面加以強(qiáng)化:首先,加強(qiáng)安全管理的意識(shí)。所有員工上崗前需要進(jìn)行安全操作知識(shí)的統(tǒng)一培訓(xùn),并進(jìn)行測(cè)驗(yàn),通過(guò)考試者方可以上崗。讓一線工作者在意識(shí)上就開始重視自身安全問題,從而減少施工事故的發(fā)生。其次,健全的安全管理監(jiān)督體系。管理層要認(rèn)真落實(shí)管理責(zé)任制,各部門各層都要建立安全管理監(jiān)督體系,對(duì)施工中存在的安全隱患進(jìn)行排查,對(duì)施工單位的安全措施進(jìn)行監(jiān)督檢查,制定應(yīng)對(duì)意外事故的緊急方案,提高對(duì)突發(fā)安全事故的應(yīng)變處理能力。最后,加強(qiáng)檢修管理。定期對(duì)施工設(shè)備進(jìn)行檢修,縮短檢修的工期,增加檢修的周期,不斷改進(jìn)設(shè)備的性能。不斷創(chuàng)新,學(xué)習(xí)新技術(shù),掌握新方法,采用新的試驗(yàn)方法進(jìn)行設(shè)備的檢驗(yàn)檢修,加強(qiáng)技術(shù)監(jiān)督,隨時(shí)掌握設(shè)備的運(yùn)行狀況與使用情況。

②加強(qiáng)水利水電工程施工進(jìn)度的管理。在加快水利水電工程施工進(jìn)度的同時(shí),需要確保施工質(zhì)量達(dá)標(biāo)。一般在水利水電工程的前期準(zhǔn)備階段會(huì)關(guān)于工程的實(shí)施制定詳細(xì)的計(jì)劃,以及完工的時(shí)間,施工時(shí)要按照計(jì)劃進(jìn)行操作,切忌不可盲目趕工忽略質(zhì)量的要求。

③加強(qiáng)水利水電工程施工質(zhì)量的管理。質(zhì)量可謂是行業(yè)的生命,確保質(zhì)量的達(dá)標(biāo)才可以使企業(yè)的發(fā)展道路走得更加的長(zhǎng)遠(yuǎn)。水利水電工程是一項(xiàng)非常龐大且復(fù)雜的工作,要建立一個(gè)完善的責(zé)任管理體系,把責(zé)任具體到人,實(shí)行分項(xiàng)管理,專人負(fù)責(zé)。加強(qiáng)水利水電工程建筑中施工質(zhì)量的管理就要從思想認(rèn)識(shí)和管理理念上加以重視。質(zhì)量的提高與工作在一線的基層員工有著至關(guān)重要的關(guān)系,樹立基層員工提高質(zhì)量的意識(shí)。工程的最后驗(yàn)收是監(jiān)督工作的關(guān)鍵,要嚴(yán)把質(zhì)量的關(guān)口,決不允許以劣充優(yōu)現(xiàn)象的發(fā)生。

④加強(qiáng)水利水電工程施工成本的管理。對(duì)于水利水電工程建筑中施工成本的管理需要從三個(gè)方面著手:施工前需要進(jìn)行準(zhǔn)確、詳細(xì)的成本預(yù)算,成本預(yù)算需要有一個(gè)詳細(xì)的控制標(biāo)準(zhǔn),制定的成本預(yù)算標(biāo)準(zhǔn)要具有可行性;施工過(guò)程中加強(qiáng)倉(cāng)庫(kù)的保管工作,物資的發(fā)放要進(jìn)行嚴(yán)格的登記,及時(shí)的盤點(diǎn)倉(cāng)庫(kù)存貨,杜絕偷盜現(xiàn)象的出現(xiàn),施工現(xiàn)場(chǎng)的操作車輛、施工人員、原材料等都要加以管理控制,減少浪費(fèi);施工中做好詳細(xì)的成本記錄工作,包括員工的工作效率、車輛的維修和油耗、原材料的使用、操作工具的損耗等。

6 結(jié) 語(yǔ)

水利水電工程建筑中的施工現(xiàn)場(chǎng)管理主要從施工現(xiàn)場(chǎng)的安全管理、建筑中施工進(jìn)度的管理、建筑中施工質(zhì)量的管理、建筑中施工成本的管理四個(gè)方面進(jìn)行工作,確保這四項(xiàng)內(nèi)容的順利實(shí)行,將有利于水利水電工程施工的順利進(jìn)行。

第5篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞:水利水電 工程 質(zhì)量監(jiān)督

中圖分類號(hào): TV 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):

一、分析目前水利水電工程質(zhì)量監(jiān)督中存在的問題

目前我國(guó)的水利水電工程已經(jīng)充分認(rèn)識(shí)到了質(zhì)量對(duì)于企業(yè)和工程的重要性,并逐漸建立了質(zhì)量監(jiān)督機(jī)構(gòu),這對(duì)于規(guī)范水利水電工程建設(shè),提高工程的質(zhì)量做出了一定的貢獻(xiàn)。但是,由于一些客觀或主觀的原因,我國(guó)的水利水電工程質(zhì)量監(jiān)督還存在著一些實(shí)際性的問題,影響著質(zhì)量監(jiān)督職能的充分發(fā)揮,也影響了工程質(zhì)量的提高。筆者試著對(duì)目前水利水電工程質(zhì)量監(jiān)督中存在的問題作以下分析:

第一,水利水電工程的質(zhì)量監(jiān)督依據(jù)不太完善。目前我國(guó)的水利水電工程是按照分級(jí)管理的原則進(jìn)行管理的,主要由相應(yīng)的水行政主管部門授權(quán)的質(zhì)量監(jiān)督管理機(jī)構(gòu)進(jìn)行質(zhì)量監(jiān)督。但是,因?yàn)樗砍雠_(tái)的工程質(zhì)量管理的規(guī)定主要是針對(duì)大、中型企業(yè)的水利水電工程建設(shè)項(xiàng)目,對(duì)于一些縣級(jí)質(zhì)量監(jiān)督管理機(jī)構(gòu)負(fù)責(zé)的小型水利水電工程沒有規(guī)定相關(guān)的質(zhì)量監(jiān)督依據(jù),這就讓小型水利水電工程缺少了具體的監(jiān)督依據(jù)。此外,因?yàn)樾⌒偷乃姽こ藤|(zhì)量的監(jiān)督缺乏制度性保障,對(duì)于工程建設(shè)中的些違規(guī)違法行為很難采取懲罰措施,只能采取教育、督促的方式責(zé)令其整改,這嚴(yán)重?fù)p害了質(zhì)量監(jiān)督管理的執(zhí)行效力,導(dǎo)致了屢禁不止的現(xiàn)象頻頻發(fā)生。

第二,水利水電過(guò)程的質(zhì)量監(jiān)督人員的素質(zhì)有待提高。水利水電的質(zhì)量監(jiān)督人員是質(zhì)量監(jiān)督工作切實(shí)進(jìn)行的關(guān)鍵,如果缺乏了高素質(zhì)的監(jiān)督人員,就會(huì)讓監(jiān)督管理的相關(guān)職能落實(shí)不到位。目前的水利水電工程質(zhì)量監(jiān)督管理人員素質(zhì)存在參差不齊的現(xiàn)象,他們不僅缺乏扎實(shí)的專業(yè)知識(shí),不能再監(jiān)督過(guò)程中及時(shí)發(fā)現(xiàn)問題和解決問題,還存在責(zé)任意識(shí)不強(qiáng)的現(xiàn)象,導(dǎo)致了質(zhì)量監(jiān)督管理工作沒有得到有效進(jìn)行。隨著改革開放的推進(jìn),社會(huì)經(jīng)濟(jì)得到了跨越式地發(fā)展,各種水利水電工程項(xiàng)目紛紛涌現(xiàn)出來(lái),也產(chǎn)生了一些新問題和新情況,這就需要高素質(zhì)的水利水電質(zhì)量監(jiān)督人員進(jìn)行監(jiān)督和管理,以實(shí)現(xiàn)工程項(xiàng)目的高質(zhì)量。但是,一些水利水電工程管理人員的專業(yè)配置不合理,沒有扎實(shí)的專業(yè)知識(shí),雖然經(jīng)過(guò)短期的培訓(xùn),但是對(duì)質(zhì)量監(jiān)督工作的認(rèn)識(shí)不夠,掌握和運(yùn)用法律法規(guī)知識(shí)的能力不強(qiáng),從而影響了質(zhì)量監(jiān)督工作的效率。

第三,水利水電工程的質(zhì)量監(jiān)督方式方法需要改進(jìn)。由于一些縣級(jí)水利水電工程質(zhì)量監(jiān)督工作的起步晚、經(jīng)驗(yàn)不足等原因,在質(zhì)量監(jiān)督方式方法上依然呈現(xiàn)出較為傳統(tǒng)和原始的現(xiàn)象,缺乏科學(xué)化的監(jiān)督方式和方法,這給質(zhì)量監(jiān)督工作的效率帶來(lái)了一定的影響。具體說(shuō)來(lái),一些縣級(jí)的水利水電工程質(zhì)量監(jiān)督方式方法存在著以下的問題:

憑“資料”監(jiān)督現(xiàn)象嚴(yán)重。由于水利水電工程項(xiàng)目較多,質(zhì)量監(jiān)督人員較少,缺乏交通工具,且業(yè)務(wù)素質(zhì)不高,使得一些質(zhì)量監(jiān)督工作存在著走過(guò)場(chǎng)的現(xiàn)象,很少在工地現(xiàn)場(chǎng)進(jìn)行質(zhì)量抽樣檢查和實(shí)地監(jiān)督,而是憑監(jiān)理單位或施工單位提供的資料進(jìn)行質(zhì)量評(píng)定。這種監(jiān)督方式往往會(huì)因監(jiān)理單位或施工單位的弄虛作假或敷衍了事造成質(zhì)量監(jiān)督的結(jié)果不正確,也失去了其本身的嚴(yán)肅性和權(quán)威性。

單一的實(shí)體監(jiān)督現(xiàn)象嚴(yán)重。長(zhǎng)期以來(lái),水利水電的質(zhì)量監(jiān)督直接將質(zhì)量監(jiān)督檢查放在檢查是否滿足設(shè)計(jì)及技術(shù)質(zhì)量標(biāo)準(zhǔn)要求上面,而且單純地放在工程施工過(guò)程的質(zhì)量監(jiān)督上,忽視了參加工程建設(shè)的各個(gè)單位的行為規(guī)范上面,導(dǎo)致了工程的質(zhì)量受到影響。

憑經(jīng)驗(yàn)監(jiān)督現(xiàn)象嚴(yán)重。有些水利水電工程質(zhì)量監(jiān)督僅僅憑自身的經(jīng)驗(yàn)來(lái)監(jiān)督,通過(guò)簡(jiǎn)單的“手摸、眼看、錘敲、估計(jì)”等方式來(lái)進(jìn)行監(jiān)督,沒有采取科學(xué)的檢測(cè)手段對(duì)其質(zhì)量狀況進(jìn)行監(jiān)督,導(dǎo)致了質(zhì)量監(jiān)督工作存在較大隨意性,很難具備較強(qiáng)的說(shuō)服力。

二、分析如何改善當(dāng)前水利水電工程質(zhì)量監(jiān)督中存在的問題

1、完善質(zhì)量監(jiān)督依據(jù)

要加強(qiáng)中小型水利水電工程質(zhì)量監(jiān)督管理的工作,制定小型水利水電工程質(zhì)量檢驗(yàn)與評(píng)價(jià)標(biāo)準(zhǔn),并建立好相應(yīng)的違規(guī)違章懲罰措施,加強(qiáng)標(biāo)準(zhǔn)的執(zhí)行力度,促進(jìn)質(zhì)量監(jiān)督工作有依據(jù)可循。在水利水電工程質(zhì)量管理的過(guò)程中,要并結(jié)合小型水利水電工程的實(shí)際情況,更加明確縣級(jí)水利質(zhì)量監(jiān)督機(jī)構(gòu)的工作職責(zé)、工作內(nèi)容、工作程序和監(jiān)督方式。對(duì)于一些違規(guī)違法的行為,要堅(jiān)決進(jìn)行打擊,采取具體可行的制裁手段,如罰款等,以保證政府對(duì)水利水電工程項(xiàng)目的有效監(jiān)督。

提高質(zhì)量監(jiān)督人員的整體素質(zhì)

隨著水利水電工程項(xiàng)目的不斷發(fā)展,我們要加強(qiáng)質(zhì)量監(jiān)督人員素質(zhì)的提高,從而提高質(zhì)量監(jiān)督的工作效率。水利水電工程的種類繁多,每一種種類又分為不同的結(jié)構(gòu)形式,對(duì)于施工材料、施工方法和施工條件等都有不同的要求。因此需要質(zhì)量監(jiān)督人員具備較強(qiáng)的專業(yè)知識(shí),包括水工專業(yè)知識(shí)、機(jī)電專業(yè)知識(shí)、地質(zhì)專業(yè)知識(shí)等。此外,因?yàn)橘|(zhì)量監(jiān)督工作關(guān)系到水利水電工程的作用的發(fā)揮,甚至關(guān)系到人民生命財(cái)產(chǎn)的安全,更關(guān)系到國(guó)家和社會(huì)的經(jīng)濟(jì)發(fā)展,質(zhì)量監(jiān)督人員需要具備較強(qiáng)的政治素養(yǎng)和責(zé)任意識(shí)。一方面,當(dāng)前的質(zhì)量監(jiān)督機(jī)構(gòu)要促進(jìn)監(jiān)督人員的專業(yè)合理搭配和行政素質(zhì)的不斷提高,在具有扎實(shí)的專業(yè)基礎(chǔ)的同時(shí),具有較高的政治素養(yǎng)。通過(guò)優(yōu)秀人才的選拔、定期的技術(shù)培訓(xùn)、經(jīng)驗(yàn)分享會(huì)等,不斷提高人員的專業(yè)知識(shí)和政治素養(yǎng)。另一方面,要加強(qiáng)質(zhì)量監(jiān)督人員的法律法規(guī)知識(shí)及行政知識(shí)的提高,讓人員在培訓(xùn)和實(shí)踐中不斷提高自身的責(zé)任意識(shí)和法律意識(shí)。

3、改進(jìn)質(zhì)量監(jiān)督方式和方法

水利水電工程的質(zhì)量監(jiān)督管理是保證工程質(zhì)量的重要環(huán)節(jié),是協(xié)調(diào)工程各方工作的關(guān)鍵性人員,因此對(duì)于監(jiān)督方法和方式方面具有較高的要求。為了實(shí)現(xiàn)水利水電工程質(zhì)量監(jiān)督工作最大效率的發(fā)揮,我們可以從以下方面入手:首先,質(zhì)量監(jiān)督人員要堅(jiān)持抽查和巡回監(jiān)督相結(jié)合的方法進(jìn)行監(jiān)督。質(zhì)量監(jiān)督人員要明查,更要暗查,只有,這樣才能保證查來(lái)資源的客觀性和真實(shí)性,才能保證質(zhì)量監(jiān)督工作的可靠性。其次,質(zhì)量監(jiān)督人員要加強(qiáng)對(duì)相關(guān)參建單位的相關(guān)質(zhì)量行為進(jìn)行監(jiān)督。只有加強(qiáng)參建單位的質(zhì)量行為進(jìn)行監(jiān)督,才能全方位地保證工程的質(zhì)量,才能實(shí)現(xiàn)質(zhì)量監(jiān)督的目的。最后,要加強(qiáng)技術(shù)手段的研究和開發(fā),并積極運(yùn)用新技術(shù)到質(zhì)量監(jiān)督工作中去。單憑經(jīng)驗(yàn)監(jiān)督出來(lái)的質(zhì)量并不一定真實(shí)可靠,需要監(jiān)督單位對(duì)監(jiān)督方法進(jìn)行研究和開發(fā)。

總之,隨著水利水電工程數(shù)量的不斷增加,水利水電工程質(zhì)量監(jiān)督對(duì)于工程質(zhì)量的保證具有重要意義。水利水電質(zhì)量監(jiān)督單位要建立明確的質(zhì)量監(jiān)督依據(jù),提高人員素質(zhì),改進(jìn)質(zhì)量監(jiān)督方法,才能促進(jìn)水利水電質(zhì)量監(jiān)督質(zhì)量工作的不斷發(fā)展。

參考文獻(xiàn):

[1] 董亮,呂斌,魏東,許驥. 新疆水利水電工程質(zhì)量監(jiān)督工作探討[J]. 中國(guó)西部科技. 2009(06)

[2] 李紅. 加強(qiáng)水利水電工程質(zhì)量監(jiān)督的探討[J]. 安徽水利水電職業(yè)技術(shù)學(xué)院學(xué)報(bào). 2009(01)

[3] 牛生海. 如何做好張掖市水利工程質(zhì)量監(jiān)督工作的探討[J]. 水利建設(shè)與管理. 2010(05)

[4] 楊世港. 廣西水利工程質(zhì)量監(jiān)督情況及存在探討[J]. 水利建設(shè)與管理. 2006(06)

第6篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞:水利水電工程;施工技術(shù);安全管理

前言

隨著經(jīng)濟(jì)的快速發(fā)展,我國(guó)的水利水電工程建設(shè)工程項(xiàng)目越來(lái)越多,施工技術(shù)水平和安全管理措施對(duì)工程建設(shè)的的影響越來(lái)越大。必須不斷加強(qiáng)施工技術(shù)水平,提高安全管理防范措施,才能保證水利水電工程建設(shè)的持續(xù)發(fā)展。

一、水利水電工程施工技術(shù)及管理的重要性

水利水電工程施工質(zhì)量狀況受很多因素影響,其中施工技術(shù)及管理是較為重要的因素。一方面,水利水電工程較為其他工程質(zhì)量要求較高,施工環(huán)境復(fù)雜,因此,施工時(shí)除嚴(yán)格要求施工材料質(zhì)量外,還應(yīng)根據(jù)水利水電工程設(shè)計(jì)目標(biāo),明確采用的施工技術(shù),嚴(yán)格按照相關(guān)規(guī)范標(biāo)準(zhǔn)進(jìn)行施工。另一方面,為保證水利水電工程施工工作有條不紊進(jìn)行,還應(yīng)加強(qiáng)施工現(xiàn)場(chǎng)的管理,以保證水利工程施工質(zhì)量與進(jìn)度。總之,考慮到水利水電工程規(guī)模較大,施工內(nèi)容多,施工單位應(yīng)充分認(rèn)識(shí)到施工技術(shù)及施工管理給工程質(zhì)量造成的影響,積極采取有效措施確保水利水電工程滿足設(shè)計(jì)目標(biāo)要求,為水利水電工程社會(huì)與經(jīng)濟(jì)效益的充分發(fā)揮奠定堅(jiān)實(shí)的基礎(chǔ)。

二、水利水電工程施工技術(shù)

1.預(yù)應(yīng)力錨固技術(shù)

預(yù)應(yīng)力錨固技術(shù)在當(dāng)前水利水電工程建設(shè)中應(yīng)用率較高,有預(yù)應(yīng)力巖錨與混凝土預(yù)應(yīng)力拉錨固之分。預(yù)應(yīng)力錨固技術(shù)即可以加固水利水電工程總體結(jié)構(gòu),又可被應(yīng)用在日常維護(hù)中。在水利水電工程實(shí)際施工中應(yīng)用預(yù)應(yīng)力錨固技術(shù)可有效緩解與降低施工區(qū)域的受力荷載,防止裂縫等不良狀況的發(fā)生。同時(shí),與GPS技術(shù)相結(jié)合可準(zhǔn)確把握錨固施工區(qū)域的深度與方向,提高錨固質(zhì)量,將預(yù)應(yīng)力更好地作用于水利水電工程的巖基與結(jié)構(gòu),增強(qiáng)水利水電工程結(jié)構(gòu)的穩(wěn)定性。另外,實(shí)際應(yīng)用預(yù)應(yīng)力錨固技術(shù)時(shí)還應(yīng)注意以下內(nèi)容:其一,考慮到不同水利水電工程壩形多少存在一些差別,其對(duì)穩(wěn)定性與施工強(qiáng)度的要求也有所不同,因此,為確保水利水電工程結(jié)構(gòu)的安全性以及與工程其他結(jié)構(gòu)相協(xié)調(diào),應(yīng)在充分考慮水利水電工程類型、規(guī)格等內(nèi)容的基礎(chǔ)上,選擇合適的施工標(biāo)準(zhǔn);其二,預(yù)應(yīng)力錨固施工時(shí),錨桿數(shù)量、錨固荷載等都會(huì)給錨固質(zhì)量產(chǎn)生影響,因此,應(yīng)在綜合考慮施工系統(tǒng)的基礎(chǔ)上確定合理的錨固數(shù)量等一些重要參數(shù)。

2.壩體填筑技術(shù)

水利水電工程施工過(guò)程中壩面的流程化作業(yè)是壩體填筑的重點(diǎn),其不僅能夠確保壩體的面積得以充分考量,而且還能為施工機(jī)械安全進(jìn)入施工現(xiàn)場(chǎng)提供便利。另外,采用壩體填筑技術(shù)進(jìn)行施工時(shí)還應(yīng)充分考慮具體的施工條件及施工環(huán)境,尤其應(yīng)充分考慮當(dāng)?shù)氐臍夂驐l件給施工可能造成的不良影響,并明確施工流程。當(dāng)在特殊季節(jié)進(jìn)行施工時(shí)還應(yīng)加強(qiáng)施工時(shí)間的控制,以有效避免其他外部因素給壩體填筑施工造成的不利影響。

3.GIS三維動(dòng)態(tài)仿真技術(shù)

水利水電工程是一項(xiàng)系統(tǒng)性較強(qiáng)的工程,將GIS三維動(dòng)態(tài)仿真技術(shù)應(yīng)用到水利水電工程施工中可為施工單位提供準(zhǔn)確的數(shù)據(jù)參考。同時(shí),還能進(jìn)一步提高水利水電工程施工管理及進(jìn)度控制水平。利用該種技術(shù)進(jìn)行水利水電工程實(shí)際施工包括以下內(nèi)容:首先,利用該技術(shù)不同仿真模塊,獲得水利水電工程施工系統(tǒng)的準(zhǔn)確信息,例如水流的幾何形狀、水利水電工程的屬性、形體面貌等;其次,獲得水利水電工程不同施工點(diǎn)的具體情況后,加以有效組合,可獲得水利水電工程不同相關(guān)系統(tǒng)的全部面貌狀況,而后存儲(chǔ)在專門的數(shù)據(jù)庫(kù)中,供相關(guān)工作人員查詢,為水利水電工程的施工提供數(shù)據(jù)參考。

4壩體防滲加固技術(shù)

對(duì)于處于自然環(huán)境比較惡劣的水利水電工程施工時(shí),為確保其功能的充分發(fā)揮,還應(yīng)應(yīng)用壩體防滲加固技術(shù)提高壩體的穩(wěn)固性。實(shí)際施工時(shí)可對(duì)壩肩、壩底實(shí)施帷幕灌漿,或劈裂灌漿壩體,促使壩體內(nèi)部形成比較穩(wěn)定的防滲結(jié)構(gòu),有效避免壩體出現(xiàn)滲漏現(xiàn)象,進(jìn)一步增強(qiáng)壩體的穩(wěn)定性。進(jìn)行劈裂灌漿時(shí)可在充分研究壩體情況的基礎(chǔ)上進(jìn)行兩排灌漿孔的布置,其中將主排孔布置在沿壩軸線方向上,將副排孔布置在距離壩軸線上游1.5m的位置處,確保兩孔交錯(cuò)分布,孔距之間的距離控制在3~5m范圍內(nèi)。同時(shí),灌漿孔應(yīng)直達(dá)壩基位置以形成連續(xù)的防滲體系。對(duì)壩肩、壩底進(jìn)行帷幕灌漿時(shí)也應(yīng)進(jìn)行兩排灌漿孔的布置。成孔時(shí)采用回轉(zhuǎn)方法,并采用純壓式方式進(jìn)行灌漿操作。

三、水利水電工程施工安全管理

1)明確安全職責(zé),層層分工,上至領(lǐng)導(dǎo)、負(fù)責(zé)人,下至每一位員工,都要充分認(rèn)識(shí)到安全生產(chǎn)的重要性,形成全員安全管理格局,創(chuàng)造“安全生產(chǎn)人人有責(zé),安全管理人人參與”的良好氛圍,切實(shí)感受安全生產(chǎn)壓力,從而更加重視安全生產(chǎn),杜絕安全隱患。

2)在生產(chǎn)施工過(guò)程中,應(yīng)始終將施工人員及其他人員的人身安全放在首位,協(xié)調(diào)好施工進(jìn)度、工程成本及各項(xiàng)目標(biāo)關(guān)系,嚴(yán)禁冒生命危險(xiǎn)搶工期、搶進(jìn)度等損害公共安全的重效益、減成本的事件發(fā)生。加強(qiáng)工程施工安全管理監(jiān)督,嚴(yán)格執(zhí)行安全生產(chǎn)規(guī)章制度,采取強(qiáng)制性措施落實(shí)安全機(jī)構(gòu)設(shè)置、人員配備、安全防護(hù)設(shè)施用品投入,細(xì)致檢查,并加強(qiáng)防護(hù)用品質(zhì)量檢驗(yàn),認(rèn)真處理“三違”現(xiàn)象及安全事故,全方位做好安全生產(chǎn)管理工作。

3)建立合理的水利水電工程施工安全管理制度。建立合理的水利水電安全管理制度是工程安全的基礎(chǔ)保障,也是重中之重。始終把安全生產(chǎn)放在第一位,不斷地完善和健全水利水電安全管理制度,加強(qiáng)安全防護(hù)和安全施工管理,將各項(xiàng)工作都落實(shí)到位,這是一個(gè)企業(yè)該有的態(tài)度。施工工作也要以人為本,力求將安全隱患杜絕在源頭。 創(chuàng)新管理方法,將責(zé)任落實(shí)到個(gè)人,提高領(lǐng)導(dǎo)與員工的責(zé)任意識(shí)。將安全問題納入各項(xiàng)行為規(guī)章制度中,提高相關(guān)人員對(duì)安全施工重要性的重視。對(duì)他們進(jìn)行專業(yè)的安全教育活動(dòng)課程講解與實(shí)踐,從基層學(xué)起。在施工現(xiàn)場(chǎng),要對(duì)不同的施工環(huán)境進(jìn)行不同的制度管理,要對(duì)工人的作息時(shí)間有制度保障,保證工人有良好的休息,才會(huì)有精力投入施工。

4)提高施工安全性,提高工作人員的專業(yè)能力。水利水電工程作為國(guó)民經(jīng)濟(jì)的基礎(chǔ)性工程,對(duì)質(zhì)量和技術(shù)都有著相當(dāng)高的要求,尤其在科技水平不斷提高的今天,水利水電工程的相關(guān)施工技術(shù)對(duì)施工人員的要求更高,尤其是施工人員的技術(shù)水平和業(yè)務(wù)能力、提高施工人員的技術(shù)水平和業(yè)務(wù)能力有利于提高水利水電工程施工的安全性,提高水利水電工程的質(zhì)量、在施工過(guò)程中,應(yīng)該加強(qiáng)施工人員對(duì)施工條例與規(guī)范的學(xué)習(xí),保障施工人員嚴(yán)格按照施工規(guī)范進(jìn)行施工、加強(qiáng)對(duì)施工人員的安全教育,提高其水利水電施工的安全生產(chǎn)意識(shí)、對(duì)施工人員進(jìn)行相關(guān)的技術(shù)培訓(xùn)和安全生產(chǎn)培訓(xùn),提升施工人員的技術(shù)水平,對(duì)最新的施工技術(shù)與施工設(shè)備都要掌握,以確保水利水電工程施工的質(zhì)量、同時(shí),也要加強(qiáng)對(duì)管理人員的培訓(xùn),提高其管理水平,幫助管理人員構(gòu)建合理的水利水電工程管理體系,保障水利水電工程的施工與管理的科學(xué)性!合理性、

結(jié)語(yǔ)

總而言之,水利水電工程是一項(xiàng)規(guī)模大、施工周期長(zhǎng)、技術(shù)復(fù)雜的工程,因此,要想在施工中,施工單位應(yīng)加強(qiáng)施工技術(shù)的研究,根據(jù)水利水電施工設(shè)計(jì)目標(biāo)要求,采用合理的施工技術(shù)。同時(shí),結(jié)合單位實(shí)際積極采取有效的管理措施,提高施工管理質(zhì)量與水平,為進(jìn)一步提高水利水電工程施工質(zhì)量奠定堅(jiān)實(shí)的基礎(chǔ),促使其更好地為我國(guó)社會(huì)的發(fā)展做出應(yīng)有貢獻(xiàn)。

參考文獻(xiàn)

第7篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞:可持續(xù)發(fā)展;水利水電工程;策略

0導(dǎo)言:作為基礎(chǔ)性的自然資源和戰(zhàn)略性的經(jīng)濟(jì)資源,水資源的開發(fā)利用直接關(guān)系到生態(tài)環(huán)境的平衡和經(jīng)濟(jì)社會(huì)的發(fā)展。水利水電工程是國(guó)家重點(diǎn)扶持的基礎(chǔ)設(shè)施建設(shè)項(xiàng)目之一,要積極貫徹可持續(xù)發(fā)展理念,才能最終促成水利水電事業(yè)的快速發(fā)展與經(jīng)濟(jì)、社會(huì)、生態(tài)環(huán)境協(xié)調(diào)發(fā)展這一雙贏目標(biāo)的實(shí)現(xiàn)。

1.水利水電工程實(shí)現(xiàn)可持續(xù)發(fā)展的意義

雖然我國(guó)水資源的總量相當(dāng)豐富,但是水資源的開發(fā)量卻不足,人均水資源儲(chǔ)量也比較匱乏。我們需要繼續(xù)進(jìn)行水資源的有效開發(fā),認(rèn)識(shí)到過(guò)去以犧牲生態(tài)與環(huán)境為代價(jià)來(lái)?yè)Q取經(jīng)濟(jì)發(fā)展的局限性,積極實(shí)現(xiàn)水利水電工程的可持續(xù)發(fā)展。

1.1保護(hù)生態(tài)環(huán)境

水利水電工程在使局部自然生態(tài)環(huán)境得到改善的同時(shí),也會(huì)對(duì)生態(tài)環(huán)境的完整性產(chǎn)生諸多影響。一方面,水力發(fā)電代替燃煤發(fā)電,直接減少了溫室氣體的排放量。南水北調(diào)工程也控制了部分地區(qū)過(guò)分開采地下水資源的現(xiàn)象。但另一方面,水庫(kù)、閘壩、電站的修建會(huì)引發(fā)河流形態(tài)的變化,容易引發(fā)地震、滑坡等地質(zhì)災(zāi)害。此外,還會(huì)影響水體自凈能力,改變水生動(dòng)植物、微生物、洄游性魚類等物種的生存環(huán)境。因此,為了保護(hù)生態(tài)環(huán)境,水利水電工程的可持續(xù)發(fā)展應(yīng)盡量減少到對(duì)周圍空氣、土地和生物等因素的影響,提前做好防范措施。

1.2促進(jìn)經(jīng)濟(jì)發(fā)展

我們?cè)诳吹剿姽こ趟鶐?lái)的巨大經(jīng)濟(jì)效益同時(shí),也應(yīng)加強(qiáng)對(duì)工程項(xiàng)目的綜合經(jīng)濟(jì)論證。一方面,水利水電工程在電力、航運(yùn)、旅游、養(yǎng)殖、水產(chǎn)、灌溉等方面直接影響著國(guó)民經(jīng)濟(jì)的增長(zhǎng),對(duì)工業(yè)、農(nóng)業(yè)、漁業(yè)等重要支撐產(chǎn)業(yè)的發(fā)展產(chǎn)生了積極的作用。但另一方面,部分地區(qū)的城鄉(xiāng)水電供應(yīng)仍存在不足,一些地區(qū)的水資源已開發(fā)殆盡。特別是水利水電工程建設(shè)中還存在經(jīng)濟(jì)政策待完善、開發(fā)資金不足、還貸期限過(guò)短、部分資金未進(jìn)行合理分配等影響投資收益的問題。[1]因此,為了促進(jìn)經(jīng)濟(jì)的全面發(fā)展,水利水電工程的可持續(xù)發(fā)展應(yīng)充分考慮其自身的承載能力,尊重市場(chǎng)經(jīng)濟(jì)的發(fā)展規(guī)律。

1.3維護(hù)社會(huì)穩(wěn)定

水利水電工程在造福人類的同時(shí),其耕地征用和水庫(kù)淹沒也會(huì)對(duì)當(dāng)?shù)厝巳旱纳a(chǎn)和生活產(chǎn)生不利影響。一方面,為了維持社會(huì)長(zhǎng)治久安,照顧到防洪、發(fā)電、灌溉等社會(huì)利益,工程中的征地移民是不可避免的舉措。但另一方面,面對(duì)大量的非自愿性移民,如果未能解決安置和補(bǔ)償問題,會(huì)造成許多移民成為貧困弱勢(shì)群體,移民區(qū)域變?yōu)樨毨^(qū),容易引發(fā)社會(huì)不滿和民眾抗議等后果,使工程區(qū)成為群發(fā)事件的高發(fā)區(qū)。因此,為了維護(hù)社會(huì)的穩(wěn)定,水利水電工程的可持續(xù)發(fā)展應(yīng)妥善處理好工程移民的問題,使其對(duì)當(dāng)?shù)厝丝谶w移造成的損害降至最低。

2.水利水電工程實(shí)現(xiàn)可持續(xù)發(fā)展的策略

我國(guó)正積極發(fā)展水利水電工程,以達(dá)到擴(kuò)大電力生產(chǎn)、防汛抗旱、解決地域性缺水等目的。但如果措施不到位,往往也會(huì)對(duì)所涉及區(qū)域造成不利影響。因此,水利水電工程要積極采取可持續(xù)發(fā)展策略,實(shí)現(xiàn)對(duì)生態(tài)效益、經(jīng)濟(jì)效益和社會(huì)效益的統(tǒng)籌兼顧。

2.1實(shí)施流域的統(tǒng)一規(guī)劃與綜合開發(fā)

水利水電工程的設(shè)計(jì)要從全局出發(fā),進(jìn)行統(tǒng)一規(guī)劃和綜合開發(fā)。首先,水利水電工程施工期限長(zhǎng)、影響面積大,因此不能僅考慮到眼前局部的利益,而應(yīng)服從國(guó)家全局的戰(zhàn)略規(guī)劃,優(yōu)先開發(fā)對(duì)居民和耕地影響小的河段,對(duì)于產(chǎn)生移民和淹沒耕地多的河段適度開發(fā)或者放棄開發(fā)。其次,在集中修建開發(fā)條件適宜和控制性能良好的大型水利水電樞紐工程的同時(shí),重點(diǎn)發(fā)展工期短、見效快的中小型水利水電工程。不僅積極發(fā)揮工程提供本身和下游各梯級(jí)供水、防洪和發(fā)電的作用,還要關(guān)注和滿足地方發(fā)展的需要。

2.2強(qiáng)化工程的動(dòng)態(tài)管理和環(huán)境監(jiān)控

水利水電工程實(shí)施中需要堅(jiān)持動(dòng)態(tài)管理和環(huán)境監(jiān)控。首先,工程的施工和運(yùn)行階段,需要考慮環(huán)境自身的不確定性和理論預(yù)測(cè)的限制性,加強(qiáng)水利水電工程實(shí)施中的動(dòng)態(tài)監(jiān)控,使其全程可以完全在計(jì)劃的控制之內(nèi)。其次,水利水電工程建設(shè)的全程都需要加強(qiáng)對(duì)周圍環(huán)境的保護(hù),不僅要落實(shí)工程招標(biāo)文件中關(guān)于保護(hù)環(huán)境的設(shè)計(jì),還要加強(qiáng)對(duì)施工機(jī)械和施工方式的監(jiān)控,工程后期也要堅(jiān)持采取有效的環(huán)境管理手段,不斷發(fā)現(xiàn)問題和解決問題,及時(shí)清理各種污染源,最大限度地降低工程對(duì)環(huán)境的影響。

2.3落實(shí)移民的妥善安置與合理補(bǔ)償

水利水電工程建設(shè)所產(chǎn)生的移民應(yīng)得到妥善安置和合理補(bǔ)償。首先,工程建設(shè)要充分考慮即將產(chǎn)生的工程移民數(shù)量,處理好移民安置規(guī)劃與縣鄉(xiāng)發(fā)展規(guī)劃的關(guān)系,確保移民都能得到合理安置。其次,要積極制定和落實(shí)移民補(bǔ)償政策,《大中型水利水電工程建設(shè)征地和移民安置條例》中明確規(guī)定:“國(guó)家提倡和支持開發(fā)性移民,需采取前期補(bǔ)償、補(bǔ)助與后期生產(chǎn)扶持相結(jié)合的辦法”。[3]工程負(fù)責(zé)部門不僅要對(duì)工程興建所淹沒的土地、房屋等設(shè)施進(jìn)行補(bǔ)償,還可以考慮使開發(fā)方與移民群體形成利益共同體,使其分享水利水電工程所帶來(lái)的效益。

小結(jié)

水利水電工程是人類改造自然資源、為自身謀取福利的有效手段,但是,在水資源的開發(fā)利用過(guò)程中,我們要堅(jiān)持可持續(xù)的發(fā)展戰(zhàn)略,減少對(duì)生態(tài)系統(tǒng)的干擾和破壞,實(shí)現(xiàn)生態(tài)環(huán)境和經(jīng)濟(jì)社會(huì)的和諧發(fā)展。

參考文獻(xiàn):

[1]繆益平,紀(jì)昌明.基于可持續(xù)發(fā)展的水電能源系統(tǒng)規(guī)劃[J].水力發(fā)電,2005(6):3.

第8篇:對(duì)水利水電工程的認(rèn)識(shí)范文

關(guān)鍵詞:水利水電;施工現(xiàn)場(chǎng);安全管理

中圖分類號(hào):TV 文獻(xiàn)標(biāo)識(shí)碼: A

引言

目前,在我國(guó)水利水電建筑施工過(guò)程中,還存在很多施工安全管理不到位的現(xiàn)象,引發(fā)了一系列的安全事故,所以,對(duì)水利水電建筑施工現(xiàn)場(chǎng)進(jìn)行安全管理很有必要。

一、水利水電工程建筑施工現(xiàn)場(chǎng)管理的現(xiàn)狀

水利水電工程建筑施工現(xiàn)場(chǎng)主要包括進(jìn)行水利水電工程建筑施工的地點(diǎn)以及為水利水電工程建筑施工提供生產(chǎn)服務(wù)的場(chǎng)所。即勞動(dòng)者運(yùn)用勞動(dòng)手段,作用于勞動(dòng)對(duì)象,完成一定生產(chǎn)作業(yè)任務(wù)的場(chǎng)所。它既包括生產(chǎn)前方的作業(yè)場(chǎng)所工地,又包括生產(chǎn)后方各種輔助生產(chǎn)的作業(yè)場(chǎng)所。水利水電工程建筑施工現(xiàn)場(chǎng)安全管理是指運(yùn)用科學(xué)的管理思想、管理組織、管理方法和管理手段,對(duì)施工現(xiàn)場(chǎng)的各種生產(chǎn)要素進(jìn)行計(jì)劃、組織、控制、協(xié)調(diào)、激勵(lì)等一系列措施,進(jìn)而確保水利水電工程建筑施工現(xiàn)場(chǎng)按照預(yù)期的目標(biāo),實(shí)現(xiàn)優(yōu)質(zhì)、高效、低耗、安全、文明的生產(chǎn)。其中施工現(xiàn)場(chǎng)的安全管理是水利水電工程建筑施工當(dāng)中的重要環(huán)節(jié),也是衡量一個(gè)水利水電工程建筑施工管理水平的重要標(biāo)尺。伴隨著我國(guó)經(jīng)濟(jì)的快速增長(zhǎng)水利水電工程建筑雖然取得了一些可喜的成就,但是對(duì)于施工現(xiàn)場(chǎng)的安全管理仍然存在較多問題,以下就對(duì)水利水電工程建筑施工現(xiàn)場(chǎng)安全管理的現(xiàn)狀進(jìn)行分析。

二、水利水電工程現(xiàn)場(chǎng)安全施工管理存在的問題

1、現(xiàn)場(chǎng)的安全意識(shí)薄弱

水利水電工程建筑施工現(xiàn)場(chǎng)的安全管理應(yīng)該在整個(gè)施工管理中處于核心地位,但是一些企業(yè)由于片面的追求利益的最大化,盲目的搶工期、趕超工程進(jìn)度,完全不重視甚至忽略了水利水電工程建筑施工現(xiàn)場(chǎng)的安全管理,從而導(dǎo)致了在具體的施工操作上沒有配備相應(yīng)的安全管理措施,導(dǎo)致違規(guī)作業(yè)以及超負(fù)荷作業(yè)的現(xiàn)象非常普遍,這樣一來(lái),不僅對(duì)施工人員的身體健康產(chǎn)生不良的影響,而且由于長(zhǎng)期處在疲勞施工的狀態(tài)下,對(duì)水利水電工程建筑施工的質(zhì)量也埋下了一定的安全隱患。再加上對(duì)施工現(xiàn)場(chǎng)的安全意識(shí)的淡薄,并沒有對(duì)水利水電工程建筑施工現(xiàn)場(chǎng)的工作人員進(jìn)行系統(tǒng)的安全教育以及安全考試審核,安全技術(shù)交底工作不細(xì)致甚至不存在工種交底以及施工方案的交底,忽略對(duì)工作人員的安全防護(hù)工作,例如作業(yè)現(xiàn)場(chǎng)產(chǎn)生的粉塵對(duì)對(duì)工作人員的危害極大,因此必須配備足夠的防塵口罩等個(gè)體防護(hù)用品

2、監(jiān)理工作不規(guī)范

水利水電工程建筑施工現(xiàn)場(chǎng)的監(jiān)理工作包括從項(xiàng)目立項(xiàng)到工程建成的全過(guò)程監(jiān)理。由于目前在水利水電工程建設(shè)投資決策階段、勘察設(shè)計(jì)階段實(shí)施監(jiān)理尚不成熟,需要進(jìn)一步探索完善,現(xiàn)行監(jiān)理規(guī)范適用范圍僅限于水利工程施工階段的監(jiān)理工作,包括施工準(zhǔn)備、施工實(shí)施和保修期監(jiān)理工作。由于許多從事水利水電工程建筑施工質(zhì)量監(jiān)管、檢測(cè)人員未經(jīng)專業(yè)系統(tǒng)的培訓(xùn),有些甚至沒有資質(zhì),專業(yè)素質(zhì)很低,監(jiān)管水平也很差,對(duì)待安全管理工作的責(zé)任心不強(qiáng),缺乏職業(yè)道德。這些都嚴(yán)重影響到了水利水電工程建筑施工現(xiàn)場(chǎng)的安全監(jiān)管工作。再加上業(yè)主在招投標(biāo)、合同履行、工程分包等過(guò)程中的隨意性較大,使水利水電工程建筑施工現(xiàn)場(chǎng)的監(jiān)理工作無(wú)法按照規(guī)范執(zhí)行,再加上項(xiàng)目前期的投資決策以及勘察設(shè)計(jì)階段沒有正規(guī)的監(jiān)理單位介入,更加容易引發(fā)水利水電工程建筑施工現(xiàn)場(chǎng)出現(xiàn)安全隱患。

三、水利水電工程現(xiàn)場(chǎng)安全施工管理措施

1、強(qiáng)化安全管理的意識(shí)

水利水電工程建筑施工現(xiàn)場(chǎng)安全管理可以劃分為安全管理、質(zhì)量管理、進(jìn)度管理、成本管理以及風(fēng)險(xiǎn)管理等。雖然各類別的管理措施有所不同,但其宗旨都是以意識(shí)管理為基礎(chǔ),因此需要在各個(gè)環(huán)節(jié)加強(qiáng)安全管理意識(shí)。意識(shí)具有主觀能動(dòng)性,通過(guò)提升現(xiàn)場(chǎng)管理人員的意識(shí)將安全管理理念運(yùn)用到施工現(xiàn)場(chǎng)的每一個(gè)細(xì)節(jié)當(dāng)中,對(duì)所有施工人員進(jìn)行施工安全教育培訓(xùn)并且進(jìn)行考試,未通過(guò)者一律不許上崗,從而可以有效地提高施工人員的安全防范意識(shí),更好的保護(hù)好一線工作者的人身安全。嚴(yán)格貫徹落實(shí)安全管理責(zé)任制,分層分部門建立安全管理監(jiān)督體系,具備完善的建筑項(xiàng)目現(xiàn)場(chǎng)施工管理制度,確立安全責(zé)任制、方案編制審查制度以及安全考核制度等;具體的施工單位要做好安全檢查記錄,并且具備對(duì)突發(fā)安全事故及時(shí)處理的應(yīng)變能力。

2、制定安全制度,加強(qiáng)安全監(jiān)控

在施工過(guò)程當(dāng)中,從業(yè)主到施工單位的各個(gè)部門,都應(yīng)該在統(tǒng)一認(rèn)識(shí)的基礎(chǔ)上,層層制定并認(rèn)真落實(shí)安全施工制度和安全管理制度。安全制度必須符合本單位的實(shí)際情況,也要充分結(jié)合各個(gè)單位所提出來(lái)的特殊要求,對(duì)于安全制度要做到“警鐘長(zhǎng)鳴”。在整個(gè)施工過(guò)程的安全管理工作當(dāng)中,既要求要做到統(tǒng)籌兼顧,不留下任何死角,又要充分集中力量抓好重點(diǎn);既要求充分重視施工的高峰期的施工安全,又必須注意到其他的施工階段的各個(gè)安全環(huán)節(jié);既要求充分嚴(yán)格的控制每一道關(guān)鍵工序的安全操作規(guī)程,又要求全面的抓好每一道一般工序施工時(shí)的安全要求;既要求嚴(yán)抓工程的關(guān)鍵部位的施工對(duì)象的施工安全,又要充分保證工程整體的施工安全與生產(chǎn)安全。

3、項(xiàng)目現(xiàn)場(chǎng)施工要合理控制管理風(fēng)險(xiǎn)

由于水利水電工程建筑施工現(xiàn)場(chǎng)涉及的專業(yè)及工種和崗位復(fù)雜眾多,容易產(chǎn)生安全管理漏洞,而施工現(xiàn)場(chǎng)的一切施工活動(dòng)和管理工作都是由現(xiàn)場(chǎng)人員去實(shí)現(xiàn),由于人的主觀能動(dòng)性也導(dǎo)致安全管理工作具有不確定性以及未可預(yù)知性等特點(diǎn),所以在水利水電工程建筑施工現(xiàn)場(chǎng)的安全管理中要合理控制管理上存在的風(fēng)險(xiǎn)因素。認(rèn)真分析以往存在安全管理過(guò)失,查找發(fā)生問題的根源并且總結(jié)經(jīng)驗(yàn)教訓(xùn),然后對(duì)安全管理工作進(jìn)行優(yōu)化調(diào)整,將安全管理風(fēng)險(xiǎn)降到最低。此外還需要提升水利水電工程建筑施工現(xiàn)場(chǎng)的所有工作人員的積極性,創(chuàng)造性,共同參與安全管理,激發(fā)全員的積極性、主動(dòng)性以及責(zé)任感,充分發(fā)揮其加強(qiáng)水利水電工程建筑施工現(xiàn)場(chǎng)安全管理的主體作用,并且加強(qiáng)水利水電工程建筑施工現(xiàn)場(chǎng)突發(fā)性事故的處理應(yīng)變能力,面對(duì)突發(fā)狀況能夠在第一時(shí)間編制出應(yīng)急處置方案,避免事故干擾正常的建筑施工。

4、項(xiàng)目施工過(guò)程要防止生產(chǎn)事故

水利水電工程建筑施工的工程量浩大,工期跨度長(zhǎng),這也使得現(xiàn)場(chǎng)的安全管理工作需要持之以恒的堅(jiān)持執(zhí)行,努力做到善始善終。同時(shí)還應(yīng)該注意的是,作為水利水電工程建筑施工現(xiàn)場(chǎng)的安全管理負(fù)責(zé)人,必須具備較高的職業(yè)素養(yǎng),對(duì)待施工現(xiàn)場(chǎng)的每一項(xiàng)工作都能夠進(jìn)行科學(xué)合理的劃分,對(duì)一線操作人員、施工機(jī)械以及各類器具的實(shí)行動(dòng)態(tài)管理制度。注意分工上的合理性、施工的安全性、任務(wù)上的計(jì)劃性。合理安排人員工作,合理安排作息時(shí)間,做到張弛有度、勞逸結(jié)合的科學(xué)施工。各級(jí)部門要加強(qiáng)質(zhì)量法制教育,把提高勞動(dòng)者的法律意識(shí)作為安全管理的重要環(huán)節(jié),加強(qiáng)對(duì)管理人員和職工的質(zhì)量意識(shí)和質(zhì)量管理知識(shí)的教育,建立和完善水利水電工程建筑施工的現(xiàn)場(chǎng)安全管理激勵(lì)機(jī)制,積極開展群眾性質(zhì)量管理和合理化建議活動(dòng)。

結(jié)束語(yǔ)

隨著社會(huì)的不斷進(jìn)步,水利水電工程建筑施工質(zhì)量雖然有著顯著提高,但是在建筑施工現(xiàn)場(chǎng)安全管理方面還存在著很多漏洞。建筑施工現(xiàn)場(chǎng)安全管理起伏波動(dòng)較大,提高速度極為緩慢,所以我們絕不能因?yàn)槿魏卧蚨鲆曀瑑?yōu)良的施工質(zhì)量需要業(yè)主、監(jiān)理和施工方的共同努力來(lái)爭(zhēng)取。除以此外,水利工程建設(shè)的各單位也要積極推行全面的施工現(xiàn)場(chǎng)安全管理措施,采用先進(jìn)的施工現(xiàn)場(chǎng)安全管理模式以及手段,推廣先進(jìn)的科學(xué)技術(shù)和施工工藝,依靠科技進(jìn)步和加強(qiáng)管理,努力創(chuàng)建優(yōu)質(zhì)工程,從而帶動(dòng)水利水電工程建筑施工現(xiàn)場(chǎng)安全管理質(zhì)量的全面提升。

參考文獻(xiàn)

第9篇:對(duì)水利水電工程的認(rèn)識(shí)范文

隨著社會(huì)主義市場(chǎng)經(jīng)濟(jì)的快速發(fā)展,水利水電工程建設(shè)的速度也越來(lái)越快。水利水電工程是一項(xiàng)十分復(fù)雜的工程,其中設(shè)計(jì)工作是整個(gè)水利水電工程的基礎(chǔ),其直接關(guān)乎到整個(gè)水利水電工程能否順利施工。文章主要對(duì)我國(guó)當(dāng)前水利水電工程設(shè)計(jì)階段存在的問題進(jìn)行分析,并針對(duì)這些問題提出提高水利水電工程設(shè)計(jì)質(zhì)量的具體措施,希望能夠給相關(guān)人士一定的借鑒。

關(guān)鍵詞:

水利水電工程;工程設(shè)計(jì);提升工程質(zhì)量

1目前水利水電工程的設(shè)計(jì)階段存在的問題

1.1水利水電設(shè)計(jì)單位混雜,設(shè)計(jì)人員業(yè)務(wù)水平參差不齊影響水利水電工程設(shè)計(jì)質(zhì)量的因素有很多,其中最為主要的一個(gè)因素是當(dāng)前水利水電設(shè)計(jì)單位數(shù)量很多,有些單位甚至不具備專門的設(shè)計(jì)資質(zhì),而這些單位的設(shè)計(jì)人員專業(yè)素質(zhì)不高,專業(yè)能力參差不齊,這些都會(huì)導(dǎo)致我國(guó)水利水電工程設(shè)計(jì)質(zhì)量不能滿足工程需要。一旦這樣的工程設(shè)計(jì)被使用,那么不僅工程質(zhì)量達(dá)不到標(biāo)準(zhǔn),還會(huì)擾亂整個(gè)水利水電工程設(shè)計(jì)市場(chǎng)。

1.2設(shè)計(jì)團(tuán)隊(duì)缺乏有效的交流,設(shè)計(jì)人責(zé)任感較弱水利水電工程的設(shè)計(jì)是需要團(tuán)隊(duì)完成的工作,單靠個(gè)人的力量,很難完成一個(gè)大型的水利水電工程的設(shè)計(jì)工作,而且個(gè)人設(shè)計(jì)的效率將會(huì)是非常低下的,也不能滿足現(xiàn)階段對(duì)于水利水電工程的建設(shè)發(fā)展需要。因此,團(tuán)隊(duì)成員之間進(jìn)行有效的配合,是我們高效完成水利水電工程的設(shè)計(jì)工作的關(guān)鍵所在。一項(xiàng)完整的水利水電工程的設(shè)計(jì)工作也是一項(xiàng)非常系統(tǒng)的工作,設(shè)計(jì)工作開展的時(shí)候自然會(huì)涉及到許多學(xué)科的應(yīng)用知識(shí),要想有效地完成我們的設(shè)計(jì)工作,不同方面的專業(yè)設(shè)計(jì)人才都是必須的。水利水電工程的設(shè)計(jì)工作是團(tuán)隊(duì)工作,團(tuán)隊(duì)成員之間的有效交流是保證設(shè)計(jì)工作高效完成的關(guān)鍵所在。在現(xiàn)階段的水利水電工程的設(shè)計(jì)工程存在的問題是缺乏不同專業(yè)人才的參與,為了節(jié)約設(shè)計(jì)的成本,在某些問題處理上進(jìn)行簡(jiǎn)單化處理,而非專業(yè)設(shè)計(jì)人才的專業(yè)方案。在某些專業(yè)團(tuán)隊(duì)進(jìn)行水利水電工程設(shè)計(jì)的時(shí)候,設(shè)計(jì)團(tuán)隊(duì)內(nèi)部缺乏有效的交流與溝通,設(shè)計(jì)工作的效率就大打了折扣。除此之外,我們的設(shè)計(jì)人員的責(zé)任感還有待加強(qiáng),在利益的驅(qū)使之下,設(shè)計(jì)人在設(shè)計(jì)的過(guò)程當(dāng)中缺工少料。設(shè)計(jì)人員還存在的問題是不進(jìn)行實(shí)際的調(diào)查,憑借自己的想象進(jìn)行設(shè)計(jì),缺乏對(duì)設(shè)計(jì)方案的仔細(xì)審核與優(yōu)化的工作,導(dǎo)致的后果就是工程的設(shè)計(jì)方案與實(shí)際的工程實(shí)況不符合,從而造成資源的浪費(fèi)。

1.3對(duì)水利水電工程的設(shè)計(jì)缺乏質(zhì)量意識(shí)俗話說(shuō)的好“慢工出細(xì)活”。目前,存在于我們水利水電工程設(shè)計(jì)的一個(gè)比較嚴(yán)重的問題就是我們的設(shè)計(jì)工作缺乏對(duì)質(zhì)量進(jìn)行控制的意識(shí)?,F(xiàn)代化的社會(huì)發(fā)展,很多東西都在追求速度。在我們的水利水電工程設(shè)計(jì)這個(gè)行當(dāng),同樣存在著這樣的不安的思想,一切追求速度,追求利益的最大化,而缺乏對(duì)于工程設(shè)計(jì)的質(zhì)量控制工作,在設(shè)計(jì)工程一些重要細(xì)節(jié)的方面如果沒有充足時(shí)間的思考是無(wú)法進(jìn)行有效設(shè)計(jì)的。但是,在利益的驅(qū)使之下,設(shè)計(jì)工作一味地追求速度導(dǎo)致設(shè)計(jì)質(zhì)量大打折扣!

1.4設(shè)計(jì)過(guò)程缺乏對(duì)比優(yōu)化水利水電工程是一項(xiàng)關(guān)系到國(guó)計(jì)民生的基礎(chǔ)性工程。通常情況下,水利水電工程都具有施工時(shí)間長(zhǎng)、施工技術(shù)要求高、施工規(guī)模大等特點(diǎn)。所以,在進(jìn)行水利水電工程設(shè)計(jì)工作時(shí)更應(yīng)該注意設(shè)計(jì)方案的對(duì)比優(yōu)化,根據(jù)工程建設(shè)的實(shí)際情況,選擇最佳的設(shè)計(jì)方案。但是當(dāng)前水利水電工程設(shè)計(jì)工作面臨的問題是設(shè)計(jì)方案優(yōu)化對(duì)比深度不夠,沒有認(rèn)識(shí)到方案優(yōu)化對(duì)比的重要性。有很多方案設(shè)計(jì)并沒有事先對(duì)工程進(jìn)行實(shí)地勘察,在選擇的時(shí)候也只是憑借理論知識(shí),這些設(shè)計(jì)方案有些根本不適合工程的實(shí)際需求,在后期施工時(shí)帶來(lái)很多問題,直接影響工程建設(shè)的質(zhì)量。此外,通過(guò)水利水電工程設(shè)計(jì)方案的對(duì)比優(yōu)化還能夠進(jìn)一步控制工程成本,提高設(shè)計(jì)方案的科學(xué)性,有利于做好工程資源的優(yōu)化配置,減少后期更改方案的次數(shù),進(jìn)而縮短了工期。所以作為水利部門應(yīng)該加強(qiáng)對(duì)水利水電工程設(shè)計(jì)單位的管理,做好設(shè)計(jì)階段的方案對(duì)比優(yōu)化。

2提升水利水電工程設(shè)計(jì)質(zhì)量的關(guān)注點(diǎn)

2.1加大監(jiān)管力度,規(guī)范工程項(xiàng)目流程由于水利水電工程建設(shè)越來(lái)越多,這就導(dǎo)致市場(chǎng)上出現(xiàn)了大量的水利水電設(shè)計(jì)單位,但是這些單位中有些并不具備設(shè)計(jì)資質(zhì)。針對(duì)這一現(xiàn)象,政府部門必須做好監(jiān)管工作,根據(jù)相關(guān)的法律法規(guī)對(duì)市場(chǎng)上存在的這些不合法設(shè)計(jì)單位給予整頓,加大水利市場(chǎng)監(jiān)管力度,定期對(duì)市場(chǎng)上出現(xiàn)的水利水電工程設(shè)計(jì)單位進(jìn)行資質(zhì)審查,一旦發(fā)現(xiàn)不合格單位必須嚴(yán)懲。此外,當(dāng)前同行業(yè)之間的競(jìng)爭(zhēng)日趨激烈,為了給這些單位營(yíng)造公平、自由的競(jìng)爭(zhēng)環(huán)境,需要對(duì)工程項(xiàng)目招投標(biāo)過(guò)程進(jìn)行規(guī)范化整頓,對(duì)于不公平競(jìng)爭(zhēng)的現(xiàn)象嚴(yán)厲打擊。進(jìn)而有效控制當(dāng)前水利水電工程設(shè)計(jì)單位之間出現(xiàn)的惡意競(jìng)爭(zhēng)現(xiàn)象,同時(shí)對(duì)于提高水利水電工程設(shè)計(jì)質(zhì)量也具有十分重要的作用。

2.2提高設(shè)計(jì)人員責(zé)任感,增強(qiáng)設(shè)計(jì)人員合作意識(shí)設(shè)計(jì)人員是保證設(shè)計(jì)質(zhì)量的主要因素之一。設(shè)計(jì)人員的專業(yè)能力以及技術(shù)水平直接關(guān)系到整個(gè)工程設(shè)計(jì)階段的質(zhì)量,所以必須加強(qiáng)設(shè)計(jì)人員的責(zé)任感,增強(qiáng)設(shè)計(jì)人員的合作意識(shí)。作為專門的工程設(shè)計(jì)單位應(yīng)該招聘正規(guī)設(shè)計(jì)專業(yè)畢業(yè)的人才,并在上崗前對(duì)這些人員進(jìn)行培訓(xùn),提高設(shè)計(jì)人員的業(yè)務(wù)能力,同時(shí)還應(yīng)該注重培訓(xùn)設(shè)計(jì)人員責(zé)任心,使其了解工程設(shè)計(jì)對(duì)整個(gè)工程建設(shè)的重要意義,減少設(shè)計(jì)人員的工作誤差,由有經(jīng)驗(yàn)的設(shè)計(jì)人員帶剛?cè)肼毜脑O(shè)計(jì)人員一起進(jìn)行工程實(shí)地勘察,對(duì)設(shè)計(jì)好的施工方案進(jìn)行細(xì)致地審核,一旦出現(xiàn)工程設(shè)計(jì)方案與實(shí)際要求不符的現(xiàn)象應(yīng)該及時(shí)提出并做出相應(yīng)調(diào)整,同時(shí)還應(yīng)該注重資源的合理化分配,避免設(shè)計(jì)人員直接套用以往類似的工程設(shè)計(jì)方案。此外,工程設(shè)計(jì)工作的開展需要團(tuán)隊(duì)成員之間的相互配合,設(shè)計(jì)之后的審核工作是保證設(shè)計(jì)質(zhì)量的必要程序。為了進(jìn)一步提高工程設(shè)計(jì)的科學(xué)性,設(shè)計(jì)人員應(yīng)該具備優(yōu)化設(shè)計(jì)方案的意識(shí),這不僅能夠方便后期施工,同時(shí)還能夠?qū)崿F(xiàn)高效合理利用工程資源,為施工企業(yè)節(jié)省資金,進(jìn)而獲得更多的經(jīng)濟(jì)效益。

2.3做好設(shè)計(jì)前期的準(zhǔn)備工作,做好現(xiàn)場(chǎng)實(shí)地的調(diào)研工程前期準(zhǔn)備工作是否充足對(duì)后面工程設(shè)計(jì)工作起到十分重要的作用。為了保證工程設(shè)計(jì)的質(zhì)量,需要專門的地質(zhì)勘查人員進(jìn)行實(shí)地考察分析,并做好相關(guān)的數(shù)據(jù)記錄。在設(shè)計(jì)之前設(shè)計(jì)人員應(yīng)該和勘查人員進(jìn)行溝通,了解工程所在地的特殊地質(zhì)情況,這對(duì)于工程設(shè)計(jì)可以起到事半功倍的效果,設(shè)計(jì)出的圖紙也會(huì)更加科學(xué)。同一種地質(zhì)情況也可以有不同的設(shè)計(jì)標(biāo)準(zhǔn),這就需要設(shè)計(jì)人員能夠從工程實(shí)際考慮,結(jié)合其他相關(guān)因素(經(jīng)費(fèi)投入、操作難易、后期養(yǎng)護(hù)等)選擇最佳的設(shè)計(jì)方案。此外,通過(guò)現(xiàn)場(chǎng)實(shí)地調(diào)研,還能夠針對(duì)可能出現(xiàn)的工程問題提前做好預(yù)防措施。

3結(jié)束語(yǔ)

水利水電工程是民生工程建設(shè)中的重要組成部分,同時(shí)也是功在千秋的造福人民的工程。雖然我國(guó)水利水電工程引起了人們的廣泛關(guān)注,不論是在施工設(shè)備上還是技術(shù)上都有很大的提高,但是在設(shè)計(jì)階段還是存在很多的問題。作為水利主管部門應(yīng)該做好監(jiān)管工作,設(shè)計(jì)人員也應(yīng)該不斷提升自身的專業(yè)素質(zhì)和能力,進(jìn)一步做好水利水電工程設(shè)計(jì)工作,促進(jìn)我國(guó)水利事業(yè)的不斷發(fā)展。

參考文獻(xiàn)

[1]殷杰.淺談水利水電工程水工設(shè)計(jì)方案對(duì)比研究[J].科技資訊,2010(24).

[2]劉后虎.水利工程設(shè)計(jì)中存在的問題及改進(jìn)措施[J].中國(guó)高新技術(shù)企業(yè),2010(13).