關(guān)鍵詞:高層建筑;給排水工程;控制要點(diǎn)
Abstract: With the deepening of reform and opening-up, built many tall buildings. In the high-rise building engineering, water supply and drainage engineering as a supporting project, its construction quality has great influence on the engineering performance of the play. Building water supply and drainage supervision engineering should be built in to ensure the engineering quality as the goal, several construction process quality, process as the core, good drainage and supervision of the work of building. The main problem, in this paper, building water supply and drainage engineering supervision the quality of water supply and drainage construction control is weak, and the supervision quality control key points are introduced.
Key words: high-rise building water supply and drainage engineering; control points;
中圖分類號(hào):TU99 文獻(xiàn)標(biāo)識(shí)碼: 文章編號(hào)
隨著社會(huì)的發(fā)展,城市建筑用地越來(lái)越少,建筑技術(shù)水平日益提高,越來(lái)越多的高樓大廈出現(xiàn)在人們的視線里,城市建筑在向高層方向發(fā)展。然而,給排水工程作為城市建筑的配套工程,其好壞與工程的使用功能的發(fā)揮息息相關(guān)。施工前準(zhǔn)備、施工過(guò)程到所形成的產(chǎn)品質(zhì)量都是給排水工程實(shí)際施工監(jiān)理過(guò)程中極其重要的控制環(huán)節(jié)。
一、建筑給排水工程監(jiān)理面臨的主要問(wèn)題
雖然從工程量和投資角度上來(lái)看,高層建筑安裝工程中的給排水分部比較少,但卻在建筑產(chǎn)品的質(zhì)量投訴中相當(dāng)大的比例。這些質(zhì)量問(wèn)題不會(huì)在建筑主體的施工階段發(fā)生,但卻與其有著必然的聯(lián)系。
在主體結(jié)構(gòu)施工階段,由于給排水工程的施工主要是預(yù)留和預(yù)埋,工程量較小,因此從領(lǐng)導(dǎo)至項(xiàng)目負(fù)責(zé)人都普遍對(duì)此階段的重視程度偏低。因而,產(chǎn)生了大量位置不準(zhǔn)的預(yù)留洞和預(yù)留套管,甚至出現(xiàn)漏埋套管和漏留洞口的現(xiàn)象,這無(wú)疑給工程帶來(lái)了質(zhì)量缺陷和事故隱患。出現(xiàn)這些問(wèn)題后,施工者在管道及設(shè)備安裝時(shí),往往選擇直接在樓板、剪力墻上鑿洞,造成建筑主體結(jié)構(gòu)面目全非,坑坑洼洼,得不償失,不僅浪費(fèi)了大量的人力和物力,還使得衛(wèi)生間樓板等結(jié)構(gòu)的承載能力大大降低;也不乏出現(xiàn)這樣的現(xiàn)象,在不能鑿打梁柱的情況下勉強(qiáng)安裝原來(lái)的預(yù)留洞,不僅給外觀帶來(lái)不可修補(bǔ)的遺憾,還可能留下漏水的隱患。其實(shí),給排水工程的施工在建筑主體施工階段是一個(gè)非常關(guān)鍵的內(nèi)容,其施工質(zhì)量的好壞一方面對(duì)整個(gè)給排水分部工程的質(zhì)量造成了直接影響,另一方面,對(duì)于住宅整體的質(zhì)量和安全也帶來(lái)了不可忽視的影響。如果監(jiān)理工程師對(duì)此引起足夠的重視,并采取相應(yīng)的可靠措施,保證給排水工程的施工的質(zhì)量,就能避免出現(xiàn)上述情況。
二、給排水工程監(jiān)理質(zhì)量控制要點(diǎn)
1.工程施工前期階段
(1)認(rèn)真擬定所監(jiān)理項(xiàng)目的給排水專業(yè)細(xì)則,并切實(shí)按此細(xì)則指導(dǎo)項(xiàng)目監(jiān)理。
(2)了解施工單位的管理水平和技術(shù)水平,認(rèn)真審核承包商提交的施工組織設(shè)計(jì),加強(qiáng)預(yù)控力度。
(3)組織有效的施工圖交底與會(huì)審,給排水監(jiān)理工程師工作的重點(diǎn)應(yīng)在:1)弄清住宅的裝修水準(zhǔn),如果是初裝,監(jiān)理工程師應(yīng)明白衛(wèi)生間、廚房給排水支管是否要求統(tǒng)一安裝等;2)檢查承包商專業(yè)技術(shù)人員的配備情況,并要求承包商提前提交圖紙會(huì)審情況;3)給排水監(jiān)理工程師仔細(xì)審圖,及時(shí)將施工圖中的有關(guān)問(wèn)題及業(yè)主、承包商提交的圖紙會(huì)審意見(jiàn)整理成文,提前提交設(shè)計(jì)單位,以便設(shè)計(jì)單位在圖紙會(huì)審時(shí)有充分的準(zhǔn)備;4)及時(shí)協(xié)調(diào)解決會(huì)審中有關(guān)各方提出的技術(shù)問(wèn)題,確保項(xiàng)目施工如期開(kāi)展。
2.施工中的監(jiān)理
監(jiān)理工程師應(yīng)跟蹤檢查排水系統(tǒng)的排出管及給水系統(tǒng)引入管穿越建筑物基礎(chǔ)處、地下室或地下構(gòu)筑物外墻處,確保其按設(shè)計(jì)及施工規(guī)范要求設(shè)置了合格的套管并且預(yù)留了孔洞,一般對(duì)于有嚴(yán)格防水要求的地方,需要采用柔性防水套管,而一般防水要求的則采用剛性防水套管,針對(duì)無(wú)防水要求的采用設(shè)預(yù)留孔的方法即可。管道安裝完成后,須確保其上部?jī)艨詹坏眯∮诮ㄖ锏某两盗?,一般?lái)說(shuō)150mm是最低極限值。在施工單位安裝完成埋地的給排水管道后,再完成首層室內(nèi)地面回填及搗制混凝土的工作,在這里,需引起注意的是要確保對(duì)照?qǐng)D紙及伸出地面管道的垂直度無(wú)遺漏且安裝位置滿足現(xiàn)場(chǎng)要求。
(1)為確保無(wú)誤,須對(duì)相關(guān)設(shè)備基礎(chǔ)、預(yù)埋件、預(yù)留孔(洞)進(jìn)行、檢查和復(fù)測(cè)。
(2)檢查并確保檢查工藝流程和施工技術(shù)滿足設(shè)計(jì)規(guī)程。
(3)在強(qiáng)度和嚴(yán)密性試驗(yàn)完畢后再進(jìn)行閥門(mén)的安裝。
(4)檢查并確保管道的連接符合規(guī)范的要求以及管道上使用的壓制彎頭、彎頭的外徑與管道的外徑相同。
(5)對(duì)于有管道穿過(guò)的地下構(gòu)筑物外墻或地下室,必須采取相應(yīng)的防水措施;若建筑物有嚴(yán)格的防水要求,必須采用柔性防水套管。
(6)禁止在墻內(nèi)或樓板內(nèi)設(shè)置管道的接頭或焊接,對(duì)于暫時(shí)不接的管口需用堵頭堵好。
(7)對(duì)給水、排水管道的坡向、坡度進(jìn)行檢查,確保其符合設(shè)計(jì)及規(guī)范要求。
(8)對(duì)管道吊架、支架、管卡進(jìn)行檢查,確保其符合設(shè)計(jì)或規(guī)范要求。
(9)對(duì)各種非承壓管道系統(tǒng)和設(shè)備進(jìn)行灌水試驗(yàn),承壓管道系統(tǒng)和設(shè)備做水壓試驗(yàn)。
(10)協(xié)助業(yè)主對(duì)設(shè)備配件材料的購(gòu)置進(jìn)行嚴(yán)格的控制,并核對(duì)材料規(guī)格以設(shè)備型號(hào),對(duì)于供貨商的供貨能力、供貨期限、以及信譽(yù)等進(jìn)行嚴(yán)格的審核。
(11)施工單位在工序交接過(guò)程的檢查中,要求通過(guò)自檢、專檢后對(duì)檢查批質(zhì)量驗(yàn)收單進(jìn)行填寫(xiě),下一道工序的進(jìn)行前必須確保報(bào)監(jiān)理檢查合格并且簽證。
(12)對(duì)于重要的工序要做好及時(shí)控制與預(yù)控相結(jié)合。
(13)不合格的工程不予計(jì)量。
(14)隱蔽工程在隱蔽前,應(yīng)做好相應(yīng)的各項(xiàng)試驗(yàn),確保其嚴(yán)查合格。
(15)應(yīng)對(duì)突發(fā)的工程事故,通報(bào)甲方,由甲方發(fā)出停止指令,停止后及時(shí)對(duì)事故原因進(jìn)行分析,并重新進(jìn)行試驗(yàn)、檢查、驗(yàn)收。
(16)施工單位須嚴(yán)格按“主控項(xiàng)目”和“一般項(xiàng)目”的相關(guān)規(guī)定執(zhí)行,并簡(jiǎn)明、真實(shí)、清晰地填寫(xiě)相關(guān)資料。
3.工程驗(yàn)收階段
(1)工程竣工前,為保證器具、箱等其表面清潔,內(nèi)部沒(méi)有污物,應(yīng)全面清理所有的水表、閥門(mén)、衛(wèi)生器具、消火栓等設(shè)施。
(2)對(duì)給水管道的水壓試驗(yàn)、閥門(mén)的試壓、給水系統(tǒng)的吹洗、通水試驗(yàn)、排水管道的灌水試驗(yàn)等進(jìn)行檢測(cè),并對(duì)項(xiàng)目的測(cè)試及測(cè)試報(bào)告的編制進(jìn)行測(cè)試,對(duì)各種給排水技術(shù)資料、所有隱蔽工程檢查的隱蔽單、質(zhì)保證書(shū)、合格證書(shū)、材料的測(cè)試報(bào)告及各種電器等進(jìn)行整理匯總,裝訂成冊(cè)。工程竣工圖作為工程驗(yàn)收的依據(jù)和建設(shè)單位今后維修的原始資料,需要根據(jù)工程實(shí)際的施工情況進(jìn)行編制,整理匯總并裝訂成冊(cè)。
給排水系統(tǒng)對(duì)結(jié)果進(jìn)行驗(yàn)收的根據(jù)除了水壓試驗(yàn)、外觀檢查、灌水試驗(yàn)和通水試驗(yàn)的結(jié)果外,還有如下幾點(diǎn)需注意。
管道工程的質(zhì)量檢查如下:
①檢查管道的平面位置、坡向、標(biāo)高、管材、管徑,確保其符合要求
②檢查支架、管道、衛(wèi)生器具的位置及安裝的牢度程度,確保其符合要求。
③檢查水表、閥件、水泵等的安裝,確保沒(méi)有漏水現(xiàn)象,對(duì)于衛(wèi)生器,確保其排水通暢。
④對(duì)管道油漆和保溫進(jìn)行檢查,確保其符合設(shè)計(jì)要求。應(yīng)按檢驗(yàn)批、分部、分項(xiàng)或單位工程對(duì)給排水工程進(jìn)行驗(yàn)收,對(duì)其進(jìn)行驗(yàn)收和質(zhì)量評(píng)定必須要按國(guó)家有關(guān)規(guī)范和標(biāo)準(zhǔn)進(jìn)行。
驗(yàn)收工程時(shí),施工單位需提供如下資料:
①制品、設(shè)備和主要材料的試驗(yàn)記錄或合格證;
②竣工圖、施工圖和有關(guān)變更文件;
③水壓試驗(yàn)記錄;
④隱蔽工程的中間試驗(yàn)記錄和驗(yàn)收記錄;
⑤設(shè)備試運(yùn)轉(zhuǎn)記錄;
⑥管道沖洗試驗(yàn)記錄;
⑦檢驗(yàn)批、分項(xiàng)、分部、單位工程質(zhì)量檢驗(yàn)評(píng)定記錄等。
⑧工程質(zhì)量事故處理記錄;
三、結(jié)束語(yǔ)
建筑給排水工程的監(jiān)理工程師要嚴(yán)格按照施工規(guī)范和設(shè)計(jì)圖紙的要求,在施工節(jié)點(diǎn)、施工工序、工程驗(yàn)收過(guò)程中重點(diǎn)控制,針對(duì)給排水工程施工質(zhì)量中較薄弱環(huán)節(jié),監(jiān)理要格外注意,保證施工質(zhì)量,使給排水工程達(dá)到節(jié)省空間、使用方便、經(jīng)久耐用和美觀舒適的效果。
參考文獻(xiàn):
[1]林江濤.淺談建筑給排水施工監(jiān)理[J].科技創(chuàng)新導(dǎo)報(bào) 2008(16).
關(guān) 鍵 詞: 建筑給排水 施工監(jiān)理 質(zhì)量控制
中圖分類號(hào):S276文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):
Abstract:Water supply and drainage engineering construction and acceptance of supervision and management, aims to correct supervision means to promote the reasonable construction, ensure the construction quality. This paper discusses the construction of supervision work, and mainly from the construction process in water supply engineering, fire engineering and drainage works on three aspects of the supervision quality control.
Key Words:Building water supply and drainage; Construction supervision; Quality control
引 言
隨著人們的生活品質(zhì)的提高,對(duì)建筑給排水工程質(zhì)量的要求也越來(lái)越高,給排水工藝標(biāo)準(zhǔn)復(fù)雜程度越來(lái)越高,新材料、新工藝層出不窮,對(duì)建筑給排水工程質(zhì)量的要求也越來(lái)越嚴(yán)格,這樣對(duì)給排水工程的監(jiān)理工作也提出了更高的要求。其施工質(zhì)量的好壞直接決定了整個(gè)工程竣工交付后使用性能。因此如何在工程施工的各個(gè)環(huán)節(jié)嚴(yán)把質(zhì)量關(guān),將監(jiān)理工作的實(shí)質(zhì)落到實(shí)處是我們監(jiān)理最為關(guān)心的問(wèn)題。
1施工前期的監(jiān)理工作
在給排水工程的施工監(jiān)理過(guò)程中,包括施工前的材料準(zhǔn)備和施工過(guò)程中形成的產(chǎn)品質(zhì)量,都是重要的控制環(huán)節(jié)。
1.1做好圖紙會(huì)審
設(shè)計(jì)交底和圖紙會(huì)審是工程建設(shè)的一個(gè)重要環(huán)節(jié),對(duì)設(shè)計(jì)文件的充分了解是監(jiān)理工程師對(duì)工程質(zhì)量控制所必做的準(zhǔn)備工作之一。通過(guò)設(shè)計(jì)交底可以了解設(shè)計(jì)意圖,需要熟悉施工圖,清楚給排水管道室外和室內(nèi)的連接處,墻壁、樓板的位置標(biāo)高和安裝方案。了解工程的重點(diǎn)和難點(diǎn),通過(guò)圖紙會(huì)審可以發(fā)現(xiàn)和解決圖紙?jiān)O(shè)計(jì)中存在的問(wèn)題,看是否違背了相關(guān)規(guī)范等。并且這是解決給排水專業(yè)同其它專業(yè)之間的矛盾沖突,統(tǒng)一各方意見(jiàn),為工程順利實(shí)施創(chuàng)造必要條件。在設(shè)計(jì)交底時(shí),對(duì)管線集中處,特別是人防工程和地上工程之間的管線布置,監(jiān)理應(yīng)重點(diǎn)控制,杜絕實(shí)際安裝時(shí)發(fā)生位置沖突等問(wèn)題。
1.2詳細(xì)審核施工組織的設(shè)計(jì)
在給排水的監(jiān)理工作中應(yīng)以監(jiān)理工程師為核心體系,確定監(jiān)管項(xiàng)目所需的技術(shù)措施和組織措施,在工程施工過(guò)程中按監(jiān)理細(xì)則實(shí)施工程項(xiàng)目的監(jiān)理。在工程開(kāi)工之前必須將總承包商和各分包商的工程承包范圍劃分清楚,并把各個(gè)施工單位的質(zhì)量責(zé)任明確下來(lái)。
1.3對(duì)進(jìn)場(chǎng)材料的檢驗(yàn)要求
(1)在承包商對(duì)原材料、半成品和構(gòu)配件進(jìn)行采購(gòu)訂貨前,應(yīng)向監(jiān)理項(xiàng)目部進(jìn)行申報(bào);重要的材料,還應(yīng)當(dāng)提交檢驗(yàn)或鑒定的樣品,部分材料還要求供貨商提交物理和化學(xué)試驗(yàn)單,經(jīng)監(jiān)理項(xiàng)目部審查同意后,方可采購(gòu)。材料進(jìn)場(chǎng)時(shí)必須具備正式的出廠合格證和備案證;散熱器、閥門(mén)、水嘴、鑄鐵管件、排水硬聚氯乙烯管件管材、冷熱水用聚丙烯管材、管件必須復(fù)試;主要設(shè)備訂貨前,施工單位應(yīng)向監(jiān)理單位提出申請(qǐng),由監(jiān)理工程師核定是否符合設(shè)計(jì)要求;主要配件訂貨前,施工單位要提供樣品和有關(guān)訂貨廠家情況,經(jīng)研究同意后方可訂貨;在施工過(guò)程中隨時(shí)對(duì)工程中使用的材料進(jìn)行抽樣檢查,對(duì)不符合質(zhì)量要求的材料堅(jiān)決予以撤換。
(2)供應(yīng)商是制造材料、半成品、構(gòu)配件供應(yīng)的主體,所以通過(guò)實(shí)地檢查滿足要求的供應(yīng)商,是確保原材料、半成品和構(gòu)配件質(zhì)量的前提。同時(shí)對(duì)于大宗的器材或材料的采購(gòu),監(jiān)理項(xiàng)目部也應(yīng)要求承包商進(jìn)行公開(kāi)招標(biāo)。
(3)對(duì)于材料、半成品、構(gòu)配件,在按照規(guī)定報(bào)經(jīng)批準(zhǔn)后,交付的時(shí)間應(yīng)滿足施工進(jìn)度的需要,不得無(wú)故拖延。
(4)供應(yīng)商應(yīng)向承包商提供質(zhì)量文件,以證明材料、半成品、構(gòu)配件能夠滿足的質(zhì)量要求。
(5)部分特殊材料,訂貨時(shí)最好一次備足貨源。
2施工過(guò)程中的監(jiān)理質(zhì)量控制
2.1室內(nèi)給水系統(tǒng)安裝工程
(1)施工工藝及監(jiān)理工作流程,(如圖一)。
圖一
安裝準(zhǔn)備,干管安裝,支管安裝,試壓、沖洗,設(shè)備、給水配件安裝,通水試驗(yàn)。
(2)施工要點(diǎn)控制:隱蔽管道和給水系統(tǒng)的水壓試驗(yàn)結(jié)果必須符合設(shè)計(jì)要求和施工規(guī)范規(guī)定。給水管道試驗(yàn)壓力不應(yīng)小于0.6 MPa ,各種材質(zhì)的給水管道系統(tǒng)試驗(yàn)壓力應(yīng)為工作壓力的1.5倍; 埋地管道管溝密實(shí)度必須符合設(shè)計(jì)要求或施工規(guī)范規(guī)定,管溝位置、標(biāo)高符合設(shè)計(jì)要求。嚴(yán)禁鋪設(shè)在未經(jīng)處理的松土上;給水引入管與排水排出管的水平凈距不得小于1米;立管、橫支管安裝應(yīng)先裝支托架,支托架的規(guī)格、型式、間距必須符合設(shè)計(jì)要求或施工規(guī)范規(guī)定;管道穿過(guò)基礎(chǔ)、墻壁和樓板,應(yīng)配合土建預(yù)留孔洞;埋地管道的防腐層應(yīng)符合設(shè)計(jì)要求和施工規(guī)范規(guī)定;飲用水管道在使用前應(yīng)用每升水中含20-30毫克的游離氯的水灌滿管道進(jìn)行消毒,含氯水在管中應(yīng)留置24小時(shí)以上。消毒完后,再用飲用水沖洗,并經(jīng)有關(guān)部門(mén)取樣檢驗(yàn)水質(zhì)未被污染,方可使用。
(3)施工過(guò)程中質(zhì)量通病的預(yù)防:托、吊、卡架不牢固。由于剔洞深度不夠,卡子燕尾被切斷,埋設(shè)卡架洞內(nèi)雜物未清理凈,砼封堵又不澆水,致使固定不牢;立管甩口高度不準(zhǔn)確。其原因是由于層高超出允許偏差或測(cè)量不準(zhǔn);立管距墻不一致或半明半暗。其原因是由于立管位置安排不當(dāng),或隔斷墻位移偏差太大造成;水流不暢或管道堵塞。其原因是安裝前未認(rèn)真清理管子內(nèi)部;施工過(guò)程中,管口未及時(shí)封堵或封堵不嚴(yán);水箱不及時(shí)加蓋,致使雜物落入堵塞或污染管道;不按規(guī)定進(jìn)行水壓試驗(yàn)和通水前的沖洗。
2.2室內(nèi)消防給水系統(tǒng)安裝工程
(1)施工工藝流程。
消防管道及設(shè)備安裝的操作流程,(如圖二)。
圖二
(2)施工階段控制要點(diǎn)
消火栓、噴淋頭安裝位置,應(yīng)嚴(yán)格依照設(shè)計(jì)圖紙要求執(zhí)行,噴淋頭成排、成行,與吊頂接觸牢靠,裝飾(護(hù)口)盤(pán)平正。消防系統(tǒng)試驗(yàn)壓力,須按設(shè)計(jì)要求確定。消防報(bào)警閥應(yīng)設(shè)在明顯、易于操作的位置,報(bào)警閥應(yīng)有排水措施。消防箱內(nèi)附件應(yīng)配置齊全,箱內(nèi)報(bào)警按鈕位置正確,聯(lián)動(dòng)靈敏。消火栓栓口應(yīng)朝外,閥門(mén)中心距地面以1.1米為宜。水流指示器安裝方向應(yīng)正確,動(dòng)作靈敏。噴淋系統(tǒng)各層、試水裝置應(yīng)設(shè)置在能便于排水的地方。安裝自動(dòng)噴灑消防裝置,應(yīng)不妨礙噴頭噴水效果。如設(shè)計(jì)無(wú)規(guī)定,應(yīng)符合下列規(guī)定:吊架與噴頭的距離,應(yīng)不小于300 毫米;距末端噴頭的距離不大于750 毫米;吊架應(yīng)設(shè)在相鄰噴頭間的管段上,當(dāng)相鄰噴頭間距不大于3.6 米,可設(shè)一個(gè),小于1.8 米允許隔段設(shè)置。閥門(mén)應(yīng)按施工規(guī)范要求做好強(qiáng)度和嚴(yán)密性試驗(yàn)。監(jiān)理工程師每日將監(jiān)理工作紀(jì)要記錄于《監(jiān)理日記》中, 對(duì)施工監(jiān)理過(guò)程中發(fā)現(xiàn)的不合格,簽發(fā)《監(jiān)理工程師通知書(shū)》要求施工單位及時(shí)整改,經(jīng)整改后確認(rèn)《監(jiān)理工程師通知回復(fù)單》。對(duì)需向業(yè)主專項(xiàng)說(shuō)明的事項(xiàng)及需確認(rèn)存證事項(xiàng)以《監(jiān)理工作聯(lián)系單》報(bào)送相關(guān)單位。
(3)質(zhì)量通病的防治
1)噴淋頭處有滲漏現(xiàn)象。由于尚未系統(tǒng)試壓就封吊頂,造成通水后滲漏。封頂前必須經(jīng)試壓。2)噴淋頭與吊頂接觸不牢。護(hù)口盤(pán)偏斜。3)由于支管末端彎頭處未加卡件固定,支管尺寸不準(zhǔn),使護(hù)口盤(pán)不正。4)噴淋頭不成排、成行。5)由于未拉線安裝。水流指示器工作不靈敏。6)由于安裝方向相反或電接點(diǎn)有氧化物造成接觸不良。7)水泵結(jié)合器不能加壓。由于閥門(mén)未開(kāi)啟,單向閥裝反或有盲板未拆除造成。8)消火栓箱門(mén)關(guān)閉不嚴(yán)。由于安裝未找正或箱門(mén)強(qiáng)度不夠變形造成。9)消火栓閥門(mén)關(guān)閉不嚴(yán)。由于管道未沖洗干凈,閥座有雜物造成。10)消防管道安裝缺陷。其原因是消火栓口朝向不對(duì),標(biāo)高位置不準(zhǔn);水龍帶不按規(guī)定擺放。其原因是施工時(shí)沒(méi)有按規(guī)定安裝,施工安裝時(shí)不認(rèn)真。應(yīng)該在施工的過(guò)程中嚴(yán)格按照規(guī)定的施工要點(diǎn)來(lái)落實(shí)。
2.3室內(nèi)排水系統(tǒng)安裝工程
(1) 施工工藝流程,(如圖三)。
安裝準(zhǔn)備
干管安裝
支管安裝
潔具安裝
通水試驗(yàn)
圖三
(2)施工階段控制要點(diǎn)。
1) 隱蔽的排水和雨水管道的灌水試驗(yàn)結(jié)果,必須符合設(shè)計(jì)要求或施工規(guī)范規(guī)定。2) 排水管道坡度必須符合設(shè)計(jì)要求或施工規(guī)范規(guī)定。3) 排水立管應(yīng)按設(shè)計(jì)要求或施工規(guī)范規(guī)定設(shè)置檢查口,塑料管必須按設(shè)計(jì)要求裝設(shè)置伸縮節(jié)。4) 塑料排水管粘接時(shí),插入承口深度適宜,粘接均勻,管卡應(yīng)為塑制卡架,若用鋼制卡架,應(yīng)在管外包橡膠墊圈。5) 暗裝或埋地的排水管道,在隱蔽前必須做灌水試驗(yàn),其灌水高度應(yīng)不低于底層地面高度。6) 雨水管道不得與生活污水管道相連接。7) 雨水管道安裝后,應(yīng)做灌水試驗(yàn),灌水高度必須到每根立管最上部的雨水漏斗。
(3)施工過(guò)程中的質(zhì)量通病的防治。預(yù)制好的管段彎曲或斷裂。原因是直管堆放未墊實(shí)或曝曬所致;接口處外觀不清潔,美觀。粘接后外溢粘接劑應(yīng)及時(shí)除掉;粘接口漏水。原因是粘接劑涂刷不均勻,或粘接處未處理干凈所致;地漏安裝過(guò)高過(guò)低,影響使用。原因是地平線未找準(zhǔn);立管穿樓板處滲水,原因是立管穿樓板處沒(méi)有做防水處理,在穿樓板的地方應(yīng)該做好防水處理。
3結(jié)語(yǔ)
總之,建筑給排水工程的監(jiān)理工程師要嚴(yán)格按照施工單位和業(yè)主的要求,在給排水施工過(guò)程在施工圖、施工工序、設(shè)計(jì)要求、驗(yàn)收規(guī)定、施工規(guī)范及其它有關(guān)安裝規(guī)范的施工過(guò)程中嚴(yán)格把關(guān),才能避免工程施工中的質(zhì)量問(wèn)題,進(jìn)一步完善和提高給排水工程質(zhì)量。
參考文獻(xiàn):
[1]魏明超.淺談給排水工程監(jiān)理工作中的幾個(gè)問(wèn)題[B].山西建筑.2007 年,第 33 卷第 14 期.
[2]何錦棠.給排水工程施工階段監(jiān)理的分析[J].科技創(chuàng)新導(dǎo)報(bào),2009.
關(guān)鍵詞:給排水施工監(jiān)理措施
1、當(dāng)前建筑給排水施工監(jiān)理的主要問(wèn)題
在高層建筑安裝工程中,給排水分部工程雖然從工程量和投資角度上看是較少的,但是在建筑產(chǎn)品的質(zhì)量投訴中,卻占有較大的比例。雖然這些質(zhì)量問(wèn)題沒(méi)有直接發(fā)生在建筑主體施工階段可是許多問(wèn)題的產(chǎn)生與建筑主體施工階段,承包商不重視給排水工程有著必然的聯(lián)系。
在主體結(jié)構(gòu)施工階段,,給排水工程的施工量較小這時(shí)候的主要工程就是預(yù)留、預(yù)埋,可承包商從領(lǐng)導(dǎo)至項(xiàng)目負(fù)責(zé)人對(duì)此普遍不夠重視,甚至有些承包商在此階段連基本的給排水專業(yè)人員也不配備。由此出現(xiàn)大量的預(yù)留洞位置不準(zhǔn),預(yù)留套管位置不準(zhǔn),甚至漏留洞口、漏埋套管,給工程留下了質(zhì)量缺陷和事故隱患,這些問(wèn)題出現(xiàn)后,在管道及設(shè)備安裝時(shí),就到樓板、剪力墻上鑿洞,造成建筑主體結(jié)構(gòu)千蒼百孔,面目全非不僅浪費(fèi)了大量的人力、物力、還降低了衛(wèi)生間樓板等結(jié)構(gòu)的承載能力;有些承包商因預(yù)留錯(cuò)誤,在不能鑿打梁柱時(shí)勉強(qiáng)使用原來(lái)的預(yù)留洞,勉強(qiáng)安裝,致建筑外觀留下永遠(yuǎn)的遺憾,有的還留下漏水的隱?;肌?shí)際上,在建筑主體施工階段給排水工程的施工也是一個(gè)非常關(guān)鍵的內(nèi)容。給排水施工質(zhì)量的好壞不但直接影響到整個(gè)給排水分部工程的質(zhì)量,而且影響到住宅整體的質(zhì)量和安全,監(jiān)理工程師必須對(duì)此有足夠的重視,并采取切實(shí)可靠的措施,保證給排水工程的施工的質(zhì)量。
2、建筑給排水施工監(jiān)理的控制重點(diǎn)
在建設(shè)工程施工過(guò)程中,給排水安裝工程的施工與其他工種的施工(如土建電氣綜合布線等)有著非常密切的關(guān)系,控制好它們之間的配合、協(xié)調(diào)施工,能節(jié)省工料,加快施工進(jìn)度,確保工程質(zhì)量。
因此能否控制、協(xié)調(diào)好各工種的工作是衡量給排水監(jiān)理工作是否到位的重要標(biāo)志之一。在給排水安裝施工過(guò)程中,監(jiān)理工程師須針對(duì)管道安裝的不同階段進(jìn)行控制、協(xié)調(diào)、檢查,有的放矢,嚴(yán)格要求,才能達(dá)到事半功倍的效果。在建設(shè)工程施工的不同階段,給排水管道施工安裝的控制重點(diǎn)是不同的,總體來(lái)講,為了對(duì)給排水施工監(jiān)理進(jìn)行切實(shí)的控制,其控制要點(diǎn)可概括如下;
(1)詳細(xì)審核提交的施工組織設(shè)計(jì)
給排水的監(jiān)理工作應(yīng)建立以監(jiān)理工程師為核心的組織體系,確定所監(jiān)管項(xiàng)目行之有效的技術(shù)措施、組織措施,在項(xiàng)目實(shí)施過(guò)程中能切實(shí)按此監(jiān)理細(xì)則實(shí)施專業(yè)工程項(xiàng)目監(jiān)理。
在施工準(zhǔn)備階段,專業(yè)監(jiān)理工程師審查承包商提交的施工組織設(shè)計(jì)時(shí),應(yīng)重點(diǎn)審查其中的專業(yè)工程部分,特別是承包商的分包工程,了解施工單位的管理水平和技術(shù)水平以便有針對(duì)性地完善監(jiān)理細(xì)則,加強(qiáng)預(yù)控力度,及時(shí)向項(xiàng)目總監(jiān)提交施工組織設(shè)計(jì)審查意見(jiàn),并對(duì)施工圖進(jìn)行有效的交底與會(huì)審,讓監(jiān)理工程師、業(yè)主、承包商進(jìn)一步了解工程項(xiàng)目特征的一個(gè)重要過(guò)程。
總之,有效的施工圖技術(shù)交底與會(huì)審是項(xiàng)目施工的首要環(huán)節(jié)。參與項(xiàng)目實(shí)施的各方均應(yīng)重視,絕不能讓施工圖技術(shù)交底與圖紙會(huì)審成為形式或者是走過(guò)場(chǎng)。
(2)做好主體施工階段的組織協(xié)調(diào)和監(jiān)管工作
在高層住宅主體施工階段,給排水專業(yè)涉及的專業(yè)面多,有時(shí)也涉及多個(gè)施工單位這。時(shí)給排水專業(yè)監(jiān)理工程師應(yīng)做好組織協(xié)調(diào)監(jiān)督管理工作。
首先,應(yīng)劃分好總承包商與分包商承擔(dān)的工程范圍。工程開(kāi)工前應(yīng)劃分好總承包商與各專業(yè)分包商之間的工程承包范圍,將各施工單位的責(zé)任落實(shí)下來(lái);
其次,確定混凝土澆灌審批程序時(shí)一定要有專業(yè)給排水監(jiān)理工程師參加,以保證主體工程施工中專業(yè)施工單位預(yù)留、預(yù)埋工作能及時(shí)和準(zhǔn)確無(wú)誤。項(xiàng)目總監(jiān)簽署混凝土澆灌令時(shí),先檢查各專業(yè)監(jiān)理工程師的簽名,核對(duì)無(wú)誤后簽發(fā)混凝土澆灌令,這樣才能確保給排水專業(yè)工程按圖紙、規(guī)范完成。
再者,應(yīng)抓住重點(diǎn)階段,重點(diǎn)監(jiān)理,通常包括地下室,轉(zhuǎn)換層及標(biāo)準(zhǔn)層頭兩層的施工階段,由于其工程量流水作業(yè)不夠連續(xù)化,施工處于復(fù)雜變化的初期,很容易引起給排水施工的混亂和錯(cuò)誤,,特別是地下室施工階段,幾乎所有的重要設(shè)備均設(shè)計(jì)安裝在地下室,設(shè)備多,管線多,容易出現(xiàn)碰、漏、錯(cuò)、缺現(xiàn)象,此時(shí)各專業(yè)工程師應(yīng)詳細(xì)核對(duì)圖紙,經(jīng)核對(duì)無(wú)誤后應(yīng)嚴(yán)格按圖施工。
最后,應(yīng)及時(shí)與業(yè)主、設(shè)計(jì)單位聯(lián)系,解決施工過(guò)程中發(fā)現(xiàn)的有關(guān)技術(shù)問(wèn),題與此同時(shí)做好設(shè)備、材料選型與定貨工作,在高層住宅主體施工階段給排水監(jiān)理工程師的另一項(xiàng)工作就是設(shè)備、材料的選型與定貨的管理。
3、建筑給排水施工監(jiān)理的具體措施
在建設(shè)工程施工的不同階段,給排水管道施工安裝的控制重點(diǎn)是不同的,因此對(duì)于其監(jiān)理工作的具體措施也是不同的;
(1)工程施工前期階段
首先監(jiān),理工作必須熟悉施工圖及設(shè)計(jì)意圖、要求,熟悉、了解室內(nèi)給排水管道與室外給排水管道的連接位置,管道過(guò)基礎(chǔ)、墻壁、樓板的位置標(biāo)高和施工方法;了解設(shè)計(jì)圖要求的主要材料規(guī)格、型號(hào)及質(zhì)量標(biāo)準(zhǔn),以及建設(shè)方或施工單位投標(biāo)時(shí)承諾采用的材料品牌,嚴(yán)格控制工程進(jìn)場(chǎng)的主要材料,為工程施工質(zhì)量打好最基本的、最關(guān)鍵的基礎(chǔ)。
嚴(yán)格審核施工單位提交的由其技術(shù)負(fù)責(zé)人簽字審批的施工組織設(shè)計(jì)(方案),詳細(xì)審核其是否滿足工程的施工需要,及時(shí)簽發(fā)施工組織設(shè)計(jì)(方案)報(bào)審表,并要求施工單位在施工中按審批認(rèn)可的施工組織設(shè)計(jì)(方案)執(zhí)行。
(2)土建基礎(chǔ)主體結(jié)構(gòu)施工階段
在排水系統(tǒng)的排出管及給水系統(tǒng)引入管穿越建筑物基礎(chǔ)處、地下室或地下構(gòu)筑物外墻處,監(jiān)理工程師應(yīng)跟蹤檢查是否按設(shè)計(jì)及施工規(guī)范要求預(yù)留了孔洞和設(shè)置了合格的套管(對(duì)有嚴(yán)格防水要求的需采用柔性防水套管一般防水要求的采用剛性防水套管無(wú)防水要求的設(shè)預(yù)留孔即可),并要求管道安裝完成后其上部?jī)艨詹坏眯∮诮ㄖ锏某两盗?,一般不宜小?50mm。
在首層室內(nèi)地面回填及搗制混凝土前,應(yīng)要求施工單位安裝完成埋地的給排水管道,注意伸出地面管道的垂直度及對(duì)照?qǐng)D紙有無(wú)遺漏,安裝位置是否符合現(xiàn)場(chǎng)要求。給水管必須做水壓及通水試驗(yàn),當(dāng)符合要求時(shí)應(yīng)及時(shí)給施工單位辦理隱蔽工程驗(yàn)收手續(xù),簽發(fā)隱蔽驗(yàn)收記錄。再要求施工單位將各預(yù)留管臨時(shí)封堵好,配合土建堵孔洞和回填土。在線
要求所有埋地金屬管,在安裝前按設(shè)計(jì)要求做好防腐處理。敷設(shè)好的管道應(yīng)及時(shí)進(jìn)行灌水試驗(yàn),注意觀察管道水滿后水位是否下降,檢查管道各接口及管子本身有無(wú)滲漏。檢查管道過(guò)墻壁和樓板處,是否按要求設(shè)置了金屬或塑料套管(排水立管穿樓板處需設(shè)置鋼套管),注意檢查各預(yù)留孔洞和套管位置及大小是否符合圖紙及現(xiàn)場(chǎng)要求,有無(wú)遺漏。安裝在一般樓板處的套管,其頂部高出裝飾地20mm即可,而安裝在衛(wèi)生間及廚房?jī)?nèi)的套管其頂部應(yīng)高出裝飾地面50mm,套管底部應(yīng)與樓板底面平安裝在墻壁內(nèi)的套管,其兩端應(yīng)與飾面平。
(3)主體裝修施工階段
主體裝修施工階段是給排水設(shè)置系統(tǒng)安裝的階段,管道經(jīng)過(guò)建筑物的結(jié)構(gòu)伸縮縫、抗震縫及沉降縫時(shí)要求設(shè)置補(bǔ)償裝置;安裝U-PVC塑料排水立管時(shí)必須按設(shè)計(jì)、圖紙要求的位置設(shè)置伸縮節(jié),如無(wú)設(shè)計(jì)要求,伸縮節(jié)間距不得大于4m。在立管安裝前,要求施工單位先打通該立管各樓層預(yù)留的孔洞,自上至下吊線,并彈出立管安裝的垂直中心線,作為立管安裝的基準(zhǔn)線。立管安裝后,均應(yīng)檢查其是否位于立管安裝的垂直線上,在該立管垂直度及與墻之間的距離符合要求后,用管卡固定好。
及時(shí)將各層孔洞按施工規(guī)范及設(shè)計(jì)要求修補(bǔ)好。排水立管上應(yīng)按規(guī)定設(shè)檢查口,檢查中心距地面一般為1100mm,并應(yīng)高于該層衛(wèi)生器具上邊緣150mm;排水立管底部的彎管處需按要求設(shè)支墩。穿墻套管與管道之間縫隙宜用阻燃密實(shí)材料填實(shí),且端面光滑。注意檢查是否有管道的接口設(shè)置在套管內(nèi)。
首層埋地管,地下室底板、電梯坑排水管,直接安裝在樓板內(nèi)的排水管,沉箱內(nèi)排水管,吊頂內(nèi)排水管,直接安裝在墻體內(nèi)的空調(diào)冷凝水管等排水管道在隱蔽前需做灌水試驗(yàn),其灌水高度應(yīng)不低于底層地面高度,滿水15分后,再灌滿延續(xù)5分,液面不下降為合格。當(dāng)符合要求時(shí)及時(shí)給施工單位辦理隱蔽工程驗(yàn)收手續(xù)排水立管及水平干管需做通球試驗(yàn),通球直徑不得小于排水管管徑的2/3,通球率必須達(dá)到100%。
排水管道的各合流處應(yīng)采用斜三通或順?biāo)āR笊钗?、廢水排水管安裝時(shí)不得穿越臥室、門(mén)廳等房間。雨水斗與基層接觸處要留寬20mm、深50mm的凹槽,嵌填密封材料;同時(shí)要求在水落口周圍直徑500mm范圍內(nèi)做成不小于5%的坡度。廁所、盥洗室、衛(wèi)生間、未封閉的陽(yáng)臺(tái)以及建筑物的管道技術(shù)層內(nèi)應(yīng)設(shè)置地漏,并應(yīng)要求施工單位將其安裝在地面的最低處,無(wú)存水彎的地漏應(yīng)帶水封且水封深度不能小于50mm。當(dāng)清掃口設(shè)置在樓板或地坪上時(shí)應(yīng)與地面平,污水管起點(diǎn)的清掃口與污水橫管相垂直的墻面的距離,不得小于150mm。
(4)工程驗(yàn)收階段
建筑給排水系統(tǒng)除根據(jù)外觀檢查、水壓試驗(yàn)、通水試驗(yàn)和灌水試驗(yàn)的結(jié)果進(jìn)行驗(yàn)收外,還須對(duì)工程質(zhì)量進(jìn)行檢查。對(duì)管道工程質(zhì)量檢查的主要內(nèi)容包括;管道的平面位置、標(biāo)高、坡向、管徑管材是否符合設(shè)計(jì)要求管道支架衛(wèi)生器具位置是否正確,安裝是否牢固;閥件、水表、水泵、等安裝有無(wú)漏水現(xiàn)象衛(wèi)生器具排水是否通暢,以及管道油漆和保溫是否符合設(shè)計(jì)要求給排水工程應(yīng)按檢驗(yàn)批、分項(xiàng)、分部或單位工程驗(yàn)收,按國(guó)家有關(guān)規(guī)范和標(biāo)準(zhǔn)進(jìn)行驗(yàn)收和質(zhì)量評(píng)定。總之給排水專業(yè)監(jiān)理工程師必須要求。施工單位嚴(yán)格按業(yè)主方要求、施工圖、設(shè)計(jì)要
求、施工工序、施工規(guī)范、驗(yàn)收規(guī)定以及其他有關(guān)建筑安裝規(guī)范進(jìn)行施工,這是對(duì)建筑安裝工程施工的最低要求,同時(shí)也是爭(zhēng)取單位工程優(yōu)良的關(guān)鍵。
參考文獻(xiàn):
[1]許其昌.給水排水管道工程施工及驗(yàn)收規(guī)范[J].市政技術(shù)100期52-57
[2]傅日榮孔軍姜衛(wèi)杰.施工前準(zhǔn)備階段監(jiān)理工作評(píng)價(jià)[J].山東建筑工程學(xué)院學(xué)
報(bào).2002,17(3)
一、編制監(jiān)理實(shí)施細(xì)則的目的和監(jiān)理細(xì)則的作用
監(jiān)理細(xì)則的編制和實(shí)施可以達(dá)到規(guī)范監(jiān)理工作的行為,指導(dǎo)監(jiān)理人員有序地開(kāi)展監(jiān)理工作的目的。編制監(jiān)理實(shí)施細(xì)則能夠使監(jiān)理工程師熟悉施工圖紙和有關(guān)規(guī)范,熟知所監(jiān)理工程的專業(yè)特點(diǎn)及監(jiān)理工作的重點(diǎn)、難點(diǎn),提高監(jiān)理工作成效及工作質(zhì)量,降低監(jiān)理企業(yè)的經(jīng)營(yíng)風(fēng)險(xiǎn),提高監(jiān)理企業(yè)的信譽(yù)都會(huì)有一定的作用。
二、監(jiān)理細(xì)則的編制及要求
GB50319-2000《建設(shè)工程監(jiān)理規(guī)范》第4.2.1條規(guī)定:對(duì)中型及以上或?qū)I(yè)性較強(qiáng)的工程項(xiàng)目,項(xiàng)目監(jiān)理機(jī)構(gòu)應(yīng)編制監(jiān)理實(shí)施細(xì)則。
監(jiān)理實(shí)施細(xì)則應(yīng)符合監(jiān)理規(guī)劃的要求,并應(yīng)結(jié)合工程項(xiàng)目的專業(yè)特點(diǎn),做到詳細(xì)具體,具有可操作性。
1、需要編制監(jiān)理細(xì)則的工程項(xiàng)目:中型及以上工程項(xiàng)目
建設(shè)部第158號(hào)令《工程監(jiān)理企業(yè)資質(zhì)管理規(guī)定》附表2中規(guī)定:
1)房屋建筑工程
一般公用建筑工程:14層及以上;24米跨度(輕鋼結(jié)構(gòu)除外)及以上;單項(xiàng)工程建筑面積1萬(wàn)平方米及以上。
高聳構(gòu)筑工程:70米及以上。
住宅工程:建筑面積6萬(wàn)平方米及以上;單項(xiàng)工程14層及以上。
2)公路工程
公路工程:高速公路、一級(jí)公路及其附屬設(shè)施。
公路橋梁工程:獨(dú)立大橋、大橋、中橋橋梁總長(zhǎng)30米及以上或單跨跨徑20米及以上。
公路隧道工程:隧道長(zhǎng)度500米及以上。
3)市政公用工程
a、城市道路:城市道路的主、次干路;城市互通式立交橋;城市分離式立交橋;橋梁;隧道。
b、給排水工程:2萬(wàn)噸/日及以上的給水廠,1萬(wàn)噸/日污水處理工程;1立方米/秒及以上的給水、污水泵站;5立方米/秒及以上的給水管道;直徑1.5米及以上的排水管道。
c、燃?xì)鉄崃こ蹋阂夯瘹鈨?chǔ)罐場(chǎng)(站);燃?xì)夤こ?;燃?xì)夤艿?、調(diào)壓站;供熱面積50萬(wàn)平方米及以上的熱力工程。
d、垃圾處理工程:500噸/日及以上的垃圾焚燒及填埋工程。
e、各類地鐵輕軌工程。
f、風(fēng)景園林工程:總投資 1000萬(wàn)元及以上。
4)冶煉工程、礦山工程、石油化工工程、水利水電工程、電力工程、農(nóng)林工程、鐵路工程、通訊工程及機(jī)電安裝工程,均需要編制監(jiān)理實(shí)施細(xì)則。
2、對(duì)于項(xiàng)目規(guī)模較小、技術(shù)不復(fù)雜且管理有成熟經(jīng)驗(yàn)和措施,并且監(jiān)理規(guī)劃可以起到監(jiān)理實(shí)施細(xì)則的作用時(shí),監(jiān)理實(shí)施細(xì)則可以不必另行編寫(xiě)。
(項(xiàng)目監(jiān)理機(jī)構(gòu)為加強(qiáng)專業(yè)監(jiān)理工程對(duì)工程項(xiàng)目的專業(yè)的了解,增強(qiáng)對(duì)專業(yè)知識(shí)的掌握可以要求專業(yè)監(jiān)理工程師編制監(jiān)理實(shí)施細(xì)則。)
3、監(jiān)理實(shí)施細(xì)則的編制要求
1)監(jiān)理實(shí)施細(xì)則要符合監(jiān)理規(guī)劃的要求;
2)監(jiān)理實(shí)施細(xì)則要具有針對(duì)性,要與圖紙的要求和內(nèi)容一致,符合項(xiàng)目專業(yè)的特點(diǎn);
3)監(jiān)理實(shí)施細(xì)則要具有可操作性,要詳細(xì)、具體。
三、監(jiān)理實(shí)施細(xì)則的編制程序
GB50319-2000《建設(shè)工程監(jiān)理規(guī)范》第4.2.2條第1款規(guī)定:監(jiān)理實(shí)施細(xì)則應(yīng)在相應(yīng)工程施工開(kāi)始前編制完成,并必須經(jīng)總監(jiān)理工程師比準(zhǔn)。
第2款規(guī)定:監(jiān)理實(shí)施細(xì)則需要由專業(yè)監(jiān)理工程師編制。
四、監(jiān)理實(shí)施細(xì)則的編制依據(jù)
GB50319-2000《建設(shè)工程監(jiān)理規(guī)范》第4.2.2條第3款規(guī)定:編制監(jiān)理實(shí)施細(xì)則的依據(jù):
——已批準(zhǔn)的監(jiān)理規(guī)劃;
——與專業(yè)工程相關(guān)的標(biāo)準(zhǔn)、設(shè)計(jì)文件和技術(shù)資料;
——施工組織設(shè)計(jì)。
監(jiān)理實(shí)施細(xì)則不應(yīng)與條文中所列的編寫(xiě)依據(jù)的有關(guān)要求相沖突。
五、監(jiān)理實(shí)施細(xì)則的內(nèi)容
GB50319-2000《建設(shè)工程監(jiān)理規(guī)范》第4.2.3條規(guī)定:監(jiān)理實(shí)施細(xì)則應(yīng)包括下列主要內(nèi)容:
專業(yè)工程的特點(diǎn);
監(jiān)理工作的流程;
監(jiān)理工作的控制要點(diǎn)及目標(biāo)值;
監(jiān)理工作的方法及措施。
監(jiān)理實(shí)施細(xì)則至少應(yīng)包括條文中所規(guī)定的主要內(nèi)容。一般情況下,編制單位工程的監(jiān)理實(shí)施細(xì)則都要有目錄和編制依據(jù)等內(nèi)容。
六、監(jiān)理實(shí)施細(xì)則的補(bǔ)充、修改及完善
GB50319-2000《建設(shè)工程監(jiān)理規(guī)范》第4.2.4條規(guī)定:在監(jiān)理工作實(shí)施過(guò)程中,監(jiān)理實(shí)施細(xì)則應(yīng)根據(jù)實(shí)際情況進(jìn)行補(bǔ)充、修改和完善。
當(dāng)發(fā)生工程設(shè)計(jì)變更、計(jì)劃變更或原監(jiān)理實(shí)施細(xì)則所規(guī)定的方法、措施、流程不能有效地發(fā)揮管理和控制作用等情況是,總監(jiān)理工程師應(yīng)及時(shí)根據(jù)實(shí)際情況安排專業(yè)監(jiān)理工程師對(duì)監(jiān)理實(shí)施細(xì)則進(jìn)行補(bǔ)充、修改和完善。
案例:
夯擴(kuò)樁基礎(chǔ)施工質(zhì)量監(jiān)理細(xì)則
編制依據(jù)
1、施工圖紙及審查意見(jiàn);
2、《混凝土結(jié)構(gòu)施工及驗(yàn)收規(guī)范》GB50204-2002;
3、《載體樁設(shè)計(jì)規(guī)程》JGJ135-2007;
4、本工程監(jiān)理規(guī)劃;
5、載體樁施工方案。
二、專業(yè)工程特點(diǎn)
本工程采用載體樁基礎(chǔ),樁長(zhǎng)5米,樁身混凝土為C30,鋼筋主筋為6根12的螺紋鋼筋,箍筋采用φ6@200的螺旋鋼筋,樁頂2米箍筋加密為φ6@100,每隔2米設(shè)置一道12mm的焊接加勁箍筋。
三、監(jiān)理工作的流程圖
四、監(jiān)理工作控制要點(diǎn)及目標(biāo)值
本分項(xiàng)工程設(shè)置見(jiàn)證點(diǎn)有原材料質(zhì)量、三擊貫入度、鋼筋籠質(zhì)量、試塊留置;停止點(diǎn)有施工定位放線及樁位檢查。
五、監(jiān)理工作方法及措施
(一)、質(zhì)量的事前控制
1、原材料的控制
澆筑用砼采用商品砼,嚴(yán)格控制商品砼的質(zhì)量;鋼筋進(jìn)場(chǎng)后觀察檢查鋼筋的合格證、生產(chǎn)廠家、型號(hào)、規(guī)格、銹蝕等均合格后,現(xiàn)場(chǎng)取樣復(fù)試,復(fù)試合格后方可使用。在施工前要有經(jīng)現(xiàn)場(chǎng)取樣,實(shí)驗(yàn)室出的實(shí)驗(yàn)配合比,并根據(jù)實(shí)際施工情況進(jìn)行調(diào)整,監(jiān)理工程師確認(rèn)后,方可施工。
2、審查施工單位的施工方案,并要求施工單位進(jìn)行技術(shù)交底
在認(rèn)真閱讀施工圖紙和地質(zhì)勘察報(bào)告的基礎(chǔ)上,審查施工單位的施工方案是否可行,是否符合中華人民共和國(guó)行業(yè)標(biāo)準(zhǔn)——載體樁設(shè)計(jì)規(guī)程(JGJ135——2007)的要求;施工程序是否合理;質(zhì)量保證體系及崗位責(zé)任制是否健全;特種工上崗人員是否有證等。
3、驗(yàn)線
首先,監(jiān)理工程師認(rèn)真閱讀圖紙,然后,在施工單位自檢完成并提交施工測(cè)量放線報(bào)驗(yàn)表后,監(jiān)理工程師對(duì)報(bào)驗(yàn)的測(cè)量放線成果及載體樁位進(jìn)行查驗(yàn)審核,經(jīng)審查合格后簽署審查意見(jiàn),同意下道工序進(jìn)行施工。
二、質(zhì)量的事中控制
施工過(guò)程中進(jìn)行巡視檢查和旁站監(jiān)理。
在施工過(guò)程中著重檢查施工配合比是否正確;檢查鋼筋籠是否合格;檢查樁位是否正確,樁身是否垂直;檢查樁尖是否達(dá)到設(shè)計(jì)要求的持力層;檢查施工中對(duì)相鄰樁是否有影響以及影響程度是否滿足規(guī)范要求;檢查填充料是否滿足規(guī)范要求,總投料量滿足不大于1.8M3,且不小于0.5M3的要求,單次填料量不宜過(guò)多;檢查夯擊后地面是否隆起及隆起高度是否滿足規(guī)范要求(不得大于50MM);旁站檢查三擊貫入度是否滿足設(shè)計(jì)要求(不大于100MM);檢查混凝土坍落度是否滿足配合比要求及振搗情況是否滿足要求;檢查樁頂標(biāo)高是否滿足設(shè)計(jì)要求;檢查混凝土試塊留置數(shù)量是否滿足要求等。
三、質(zhì)量的事后控制
夯擴(kuò)樁施工完成后,檢查所施工樁數(shù)和樁位是否與施工圖相符;所留置的試塊抗壓強(qiáng)度報(bào)告是否返回,強(qiáng)度是否合格;打樁記錄是否合格;對(duì)于施工過(guò)程完成的部分、分項(xiàng)工程,進(jìn)行中間驗(yàn)收。施工單位按照施工方案及《建筑安裝工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》先進(jìn)行自檢,確認(rèn)合格后向監(jiān)理工程師提交“工程報(bào)驗(yàn)審核表”,監(jiān)理工程師按合同文件要求,根據(jù)施工圖紙、施工規(guī)范、標(biāo)準(zhǔn)進(jìn)行檢查、復(fù)核,簽署審核意見(jiàn)。
樁身的質(zhì)量檢查,破樁后,若混凝土不密實(shí)或有蜂窩等現(xiàn)象,要求將混凝土砸至密實(shí)合格為止;若鋼筋錨固長(zhǎng)度不夠,用焊接的方法將鋼筋接夠錨固長(zhǎng)度;若有樁位偏差過(guò)大的樁,將根據(jù)實(shí)際情況會(huì)同設(shè)計(jì)部門(mén),進(jìn)行處理。經(jīng)核驗(yàn)合格后,方可進(jìn)行下一步工程施工。
檢查測(cè)量定位點(diǎn)的保護(hù)情況,見(jiàn)證工程定位線的交接和檔案的交接,保證工程檔案的連續(xù)性和完整性。
四、容易出現(xiàn)的質(zhì)量問(wèn)題
1、由于混凝土運(yùn)輸線路比較長(zhǎng),混凝土坍落度大會(huì)造成混凝土離析,影響成樁的質(zhì)量,特別是遇到回填土及不密實(shí)的土質(zhì),混凝土中的水泥漿將流失。
預(yù)防措施:經(jīng)常實(shí)際測(cè)量混凝土坍落度和宏觀檢查相結(jié)合,密切注意混凝土的攪拌質(zhì)量,發(fā)現(xiàn)混凝土坍落度過(guò)大的情況,責(zé)令施工單位返工重新攪拌,嚴(yán)禁往出罐后的混凝土中加水。
2、鋼筋頭參差不齊,由于打樁時(shí)樁的長(zhǎng)度及標(biāo)高控制的不好,使成樁后露出地面的樁頭鋼筋標(biāo)高相差很多,產(chǎn)生截筋或接筋現(xiàn)象(圖紙要求樁頭鋼筋錨入承臺(tái)長(zhǎng)度不小于500mm)
預(yù)防措施:設(shè)置標(biāo)高控制標(biāo)志或隨時(shí)用水準(zhǔn)儀檢測(cè)。
3、填充量大于1.8 m3 。
處理辦法:少量的情況下,及時(shí)與設(shè)計(jì)單位溝通,經(jīng)設(shè)計(jì)單位和建設(shè)單位同意改變樁長(zhǎng)。
4、漏樁現(xiàn)象。
預(yù)防措施:及時(shí)清點(diǎn)樁數(shù)(檢查打樁記錄和現(xiàn)場(chǎng)實(shí)際檢查),避免樁基撤出后再發(fā)現(xiàn)漏樁。
參考文獻(xiàn):
建筑專業(yè)實(shí)習(xí)報(bào)告精選范文一
在進(jìn)行3年半的理論知識(shí)積累之后,要有一個(gè)踏入工地進(jìn)行實(shí)踐的過(guò)程,也就是理論與實(shí)踐的結(jié)合,特別是對(duì)與建筑這種實(shí)踐性能非常強(qiáng)的一門(mén)學(xué)科更要強(qiáng)調(diào)實(shí)際 操作技能的培養(yǎng)。而且 這門(mén)學(xué)科在很大程度上與書(shū)本有一定程度的差異,在這次實(shí)習(xí)中能使我們所掌握的理論知識(shí)得以升華,把理論與實(shí)踐找到一個(gè)最好的切入點(diǎn),為我所用。所以就要有一個(gè)將理論與實(shí)踐相融合的機(jī)會(huì)。在實(shí)習(xí)中可以得到一些只有實(shí)踐中才能得到的技術(shù),為我們以后參加緊工作打好基礎(chǔ),這就是這次實(shí)習(xí)的目的所在。
大四的第二學(xué)期一開(kāi)學(xué),老師布置完任務(wù)后,我就開(kāi)始了我的實(shí)習(xí)生活。雖然時(shí)間不是很長(zhǎng),但是我卻知道這次實(shí)習(xí)的重要性,因?yàn)檫@次實(shí)習(xí)是我們認(rèn)識(shí)專業(yè)的一個(gè)窗口,同時(shí)又是擇業(yè),社會(huì)交往乃至認(rèn)識(shí)社會(huì)的第一次機(jī)會(huì),所以我決定,在這次實(shí)習(xí)生活中,嚴(yán)格的要求自己,并悉心向各位師傅請(qǐng)教,讓自己通過(guò)這次實(shí)習(xí),確實(shí)學(xué)到一些東西,減少自己將來(lái)踏入社會(huì)的一些盲目性,讓自己在今后的工作道路中能夠走的更自信。
一、實(shí)習(xí)目的
通過(guò)接觸和參加實(shí)際工作,充實(shí)和擴(kuò)大自己的知識(shí)面,培養(yǎng)綜合應(yīng)用的能力,為以后走上工作崗位打下基礎(chǔ)。
二、實(shí)習(xí)內(nèi)容
參加測(cè)量工程、鋼筋工程、模板工程、混凝土工程、砌筑工程施工全過(guò)程的操作實(shí)習(xí),學(xué)習(xí)每個(gè)工種的施工技術(shù)和施工組織管理方法,學(xué)習(xí)和應(yīng)用有關(guān)工程施工規(guī)范及質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn),學(xué)習(xí)施工過(guò)程中對(duì)技術(shù)的處理方法。
三、實(shí)習(xí)概況
在實(shí)習(xí)期間遵守實(shí)習(xí)單位和學(xué)校的安全規(guī)章制度,出勤率高,積極向工人師傅請(qǐng)教善于發(fā)現(xiàn)問(wèn)題,并運(yùn)用所學(xué)的理論知識(shí),在工地技術(shù)員的幫助下解決問(wèn)題。對(duì)鋼筋工程、模板工程、混凝土工程等有了很具體的了解,同時(shí)對(duì)部分工程進(jìn)行實(shí)踐操作。
1.鋼筋工程鋼筋使用必須堅(jiān)持先檢查后使用的原則;鋼筋必須有出廠合格證和檢驗(yàn)報(bào)告,按國(guó)家規(guī)范進(jìn)行復(fù)檢合格后方可用于工程中,鋼筋在現(xiàn)場(chǎng)加工,制作加工工序?yàn)椋轰摻顧C(jī)械安裝鋼筋對(duì)焊錐螺紋加工彎曲成型鋼筋綁扎。
2.模板工程模板及其支架應(yīng)根據(jù)工程結(jié)構(gòu)形式、荷載大小、地基土類別、施工設(shè)備和材料供應(yīng)等條件進(jìn)行設(shè)計(jì)。模板及其支架應(yīng)具有足夠的承載能力、剛度和穩(wěn)定性,能可靠地承受澆筑混凝土的重量、側(cè)壓力以及施工荷載。澆筑混凝土?xí)r模板及支架在混凝土重力、側(cè)壓力及施工荷載等作用下脹模(變形)、跑模(位移)甚至坍塌的情況時(shí)有發(fā)生。為避免事故,保證工程質(zhì)量和施工安全,提出了對(duì)模板及其支架進(jìn)行觀察、維護(hù)和發(fā)生異常情況時(shí)進(jìn)行處理的要求。
3.混凝土工程結(jié)構(gòu)混凝土的強(qiáng)度等級(jí)必須符合設(shè)計(jì)要求。用于檢查結(jié)構(gòu)構(gòu)件混凝土強(qiáng)度的試件,應(yīng)在混凝土的澆筑地點(diǎn)隨機(jī)抽取。取樣與試件留置應(yīng)符合下列規(guī)定:
1、每拌制100盤(pán)且不超過(guò)100m3的同配合比的混凝土,取樣不得少于一次;
2、每工作班拌制的同一配合比的混凝土不足100盤(pán)時(shí),取樣不得少于一次;
3、當(dāng)一次連續(xù)澆筑超過(guò)100m3時(shí),同一配合比的混凝土每200m3取樣不得少于一次;
4、每一樓層、同一配合比的混凝土,取樣不得少于一次;
5、每次取樣應(yīng)至少留置一組標(biāo)準(zhǔn)養(yǎng)護(hù)試件,同條件養(yǎng)護(hù)試件的留置組數(shù)應(yīng)根據(jù)實(shí)際需要確定。
四、實(shí)習(xí)主要工作任務(wù)
我們這次實(shí)習(xí)的主要任務(wù)就是看懂實(shí)習(xí)工地的建筑類型,了解工程的性質(zhì),規(guī)模,建筑結(jié)構(gòu)特點(diǎn)與施工條件等內(nèi)容,了解不同機(jī)械設(shè)備的操作范圍和規(guī)程,多多請(qǐng)教了解看到的不知道的知識(shí)。盡量爭(zhēng)取參與并了解工程開(kāi)工前和施工中的各項(xiàng)準(zhǔn)備工作,參與進(jìn)入施工現(xiàn)場(chǎng)的材料,收集有關(guān)技術(shù)資料,整理施工實(shí)習(xí)日記,做好實(shí)習(xí)收尾工作。
我們應(yīng)該去了解或者熟悉工地上常用的機(jī)械設(shè)備的性能。帶著各種各樣的疑問(wèn),我們一邊參觀一邊詢問(wèn)著,嘗試了解常用的機(jī)械設(shè)備。
為了了解不同機(jī)械設(shè)備的操作范圍和規(guī)程,針對(duì)在施工現(xiàn)場(chǎng)看到的雙錐反轉(zhuǎn)出料攪拌機(jī),操作的師傅細(xì)心的告訴我們它是目前在建筑工程中應(yīng)用較廣的一種自落式攪拌機(jī),主要按重力機(jī)理進(jìn)行攪拌作業(yè)。觀察我們可以看到攪拌筒內(nèi)壁焊有弧形葉片,當(dāng)攪拌筒繞水平軸旋轉(zhuǎn)時(shí),葉片不斷將物料提升到一定高度,然后自由落下,互相摻合。主要用于一般骨料塑性混凝土的攪拌。為了進(jìn)行有效的成本控制,工長(zhǎng)告訴我們正確的放料順序?yàn)椋菏?,水,砂。因?yàn)榉帕享樞虿粚?duì)會(huì)造成浪費(fèi)。
我們?cè)诂F(xiàn)場(chǎng)看到有師傅在砌筑空心磚,據(jù)他介紹空心磚具有良好絕熱性能,主要用于非承重墻或框架結(jié)構(gòu)的填充墻等部位,比如陽(yáng)臺(tái)后砌墻。使用砌筑砂漿,孔對(duì)孔(空心磚)1/2處,孔向下(將少數(shù)分布筋埋入)交錯(cuò)搭接。若空心磚旁要開(kāi)門(mén)窗洞,應(yīng)將3塊實(shí)心磚填入其中再施工。
我們又詢問(wèn)了為了節(jié)約用水,可不可以使用生活用的污水來(lái)拌和混凝土。師傅笑了笑說(shuō),混凝土用水也需要干凈的水,因?yàn)槲鬯畷?huì)影響混凝土的質(zhì)量。不單是水,對(duì)砂、石的細(xì)度模數(shù)也有要求;對(duì)水泥標(biāo)號(hào)也有要求。
五、實(shí)習(xí)中存在的問(wèn)題
不實(shí)踐很多問(wèn)題都考慮不到,實(shí)踐后才知道什么情況都可能遇到,這就要求我們必須有豐富的實(shí)踐經(jīng)驗(yàn),像剛剛走出校門(mén)的實(shí)習(xí)生實(shí)踐經(jīng)驗(yàn)還很不豐富,但理論中的東西要是也什么都不會(huì),那在實(shí)習(xí)過(guò)程中就吃不開(kāi)了。到了施工現(xiàn)場(chǎng)經(jīng)過(guò)一段時(shí)間的實(shí)習(xí),才體會(huì)到并不是課本中學(xué)的東西用不上,而是要看你會(huì)不會(huì)用,懂不懂得變通和舉一反三的道理。本次實(shí)習(xí)中比較嚴(yán)重的問(wèn)題有以下幾個(gè):
問(wèn)題一:對(duì)理論知識(shí)掌握不夠扎實(shí),例如:混凝土、砂漿試塊的養(yǎng)護(hù)時(shí)間,做試塊時(shí)應(yīng)該振搗到什么程度,混凝土澆筑完畢后的養(yǎng)護(hù)溫度、養(yǎng)護(hù)時(shí)間,另外對(duì)混凝土出現(xiàn)裂縫分析不出原因等等。
問(wèn)題二:熟悉圖紙的能力差,對(duì)平面的圖形想象不出立體的樣子。致使不能明確的判斷出施工的對(duì)錯(cuò)。
問(wèn)題三:對(duì)于最新的施工規(guī)范不知道,致使不能很快的判斷出施工的對(duì)錯(cuò)。
問(wèn)題四:對(duì)于一些施工順序還不太明了,對(duì)每一個(gè)施工過(guò)程的操作不了解。
問(wèn)題五:理論聯(lián)系實(shí)際的能力差。對(duì)于建筑方面的一些出新了解太少。
建筑專業(yè)實(shí)習(xí)報(bào)告精選范文二
即將結(jié)束的大三學(xué)習(xí)中,我終于迎來(lái)了本專業(yè)第一次實(shí)習(xí)。實(shí)習(xí)之中,學(xué)院為我們這次實(shí)習(xí)能勝利圓滿的完成指導(dǎo)員老師和院領(lǐng)導(dǎo)交代了注意事項(xiàng)。第一重要的還是安全。畢竟安全第一!而實(shí)習(xí)也是大學(xué)生活的第二課堂,是知識(shí)發(fā)展的源泉,是檢驗(yàn)真理的試金石,也是鍛煉成長(zhǎng)的有效途徑。一個(gè)人的知識(shí)和能力只有在實(shí)踐中才能發(fā)揮作用,才能得到豐富、完善和發(fā)展。由于這次實(shí)習(xí)的時(shí)候錦江佳苑3棟才剛剛做完基礎(chǔ),所以沒(méi)有參與基礎(chǔ)工程實(shí)習(xí)。以下是我通過(guò)這次實(shí)習(xí)的認(rèn)識(shí)和收獲。
自1988年開(kāi)始起步,隨著我國(guó)改革開(kāi)放的不斷深入和交通事業(yè)的持續(xù)、快速發(fā)展,建設(shè)監(jiān)理制度已成為我國(guó)公路、水運(yùn)工程建設(shè)中不可缺少的重要環(huán)節(jié),所起的作用也越來(lái)越明顯。
建設(shè)工程監(jiān)理,即有資質(zhì)的監(jiān)理單位接收業(yè)主的委托和授權(quán),根據(jù)國(guó)家批準(zhǔn)的工程項(xiàng)目文件、有關(guān)法律、法規(guī)和監(jiān)理合同及其他建設(shè)合同進(jìn)行的監(jiān)理、管理活動(dòng)。它由監(jiān)理單位對(duì)承包單位在施工質(zhì)量、建設(shè)工期和資金使用等方面,代表建設(shè)單位實(shí)施監(jiān)督。監(jiān)理單位即監(jiān)理公司,是指具有法人資格、并取得交通主管部門(mén)頒發(fā)的公路工程施工監(jiān)理資質(zhì)證書(shū),從事工程監(jiān)理業(yè)務(wù)的經(jīng)濟(jì)組織。它是監(jiān)理工程師的執(zhí)業(yè)機(jī)構(gòu)。監(jiān)理工程師需經(jīng)全國(guó)統(tǒng)一考試合格,取得《監(jiān)理工程師資格證書(shū)》并經(jīng)注冊(cè)登記。他是代表業(yè)主監(jiān)控工程質(zhì)量,是業(yè)主和承包商之間的橋梁,這不僅要求執(zhí)業(yè)者懂得工程技術(shù)知識(shí)、成本核算,還需要其非常清楚建筑法規(guī)。在監(jiān)理工作進(jìn)行時(shí),還需總監(jiān)理工程師一職,他由法定代表人書(shū)面授權(quán),全面負(fù)責(zé)委托監(jiān)理合同的履行,主持項(xiàng)目監(jiān)理機(jī)構(gòu)的監(jiān)理工程師。此外,監(jiān)理人員還包括專業(yè)監(jiān)理工程師和監(jiān)理員,但對(duì)于信息系統(tǒng)工程建設(shè)的全過(guò)程監(jiān)理的質(zhì)量,總監(jiān)理工程師的作用至關(guān)重要??偙O(jiān)具體工程項(xiàng)目施工過(guò)程中,應(yīng)做到誠(chéng)信服務(wù),事前予控,重視工程工地例會(huì)。(58同城-實(shí)習(xí)報(bào)告)
建設(shè)工程監(jiān)理經(jīng)招投標(biāo),簽訂合同同時(shí)任命總監(jiān)、組成更建理班子,再由總監(jiān)監(jiān)理具體規(guī)劃,并按施工要求建立建立實(shí)施細(xì)則,便能進(jìn)行質(zhì)量監(jiān)控。在質(zhì)量監(jiān)控過(guò)程中,需做到精心策劃,事前予控;認(rèn)真履行事中檢查驗(yàn)收;實(shí)事求是進(jìn)行評(píng)定。建設(shè)工程監(jiān)理的主要內(nèi)容是:控制工程建設(shè)的投資控制、建設(shè)工期控制、工程質(zhì)量控制;進(jìn)行信息管理、工程建設(shè)合同管理、安全管理;協(xié)調(diào)有關(guān)單位之間的工作關(guān)系,即三控、三管、一協(xié)調(diào)。其主要建理制度包括:開(kāi)工申請(qǐng),圖紙會(huì)審,材料報(bào)驗(yàn),分項(xiàng)驗(yàn)收、屏蔽驗(yàn)收,會(huì)議制度,資料管理和開(kāi)工停工令。同時(shí),監(jiān)理工作須具有服務(wù)性,獨(dú)立性,公開(kāi)性和獨(dú)立性,以保證監(jiān)理工作正常而高效的進(jìn)行。
目前,雖然建設(shè)監(jiān)理制度已經(jīng)在全國(guó)范圍內(nèi)推行,但業(yè)主、施工單位和質(zhì)量監(jiān)督機(jī)構(gòu)對(duì)實(shí)行工程監(jiān)理的意義及其重要性還是缺乏認(rèn)識(shí),對(duì)監(jiān)理人員的地位及與各方的關(guān)系也不甚了解。有些業(yè)主認(rèn)為監(jiān)理人員是自己的雇員,必須為自己的利益著想,按自己的要求辦事。質(zhì)量監(jiān)督機(jī)構(gòu)認(rèn)為監(jiān)理人員代替了自己的職能,因而忽視了對(duì)工程質(zhì)量的監(jiān)管。由于對(duì)監(jiān)理人員工作的模糊認(rèn)識(shí),使工程建設(shè)各方在關(guān)系的協(xié)調(diào)上不順暢,監(jiān)理人員的決定不能實(shí)施,監(jiān)理效果不夠理想,工程質(zhì)量監(jiān)督工作出現(xiàn)漏洞。當(dāng)工程出現(xiàn)質(zhì)量問(wèn)題時(shí),還容易出現(xiàn)互相推諉扯皮的現(xiàn)象。
實(shí)行建設(shè)監(jiān)理制度是我國(guó)建設(shè)領(lǐng)域的一項(xiàng)重大改革,是我國(guó)對(duì)外開(kāi)放、國(guó)際交往日益擴(kuò)大的結(jié)果。通過(guò)實(shí)行建設(shè)監(jiān)理制度,我國(guó)建設(shè)工程的管理體制開(kāi)始向社會(huì)化、專業(yè)化、規(guī)范化的先進(jìn)管理模式轉(zhuǎn)變。這種管理模式,在項(xiàng)目法人與承包商之間引入了建設(shè)監(jiān)理單位作為中介服務(wù)的第三方,進(jìn)而在項(xiàng)目法人與承包商、項(xiàng)目法人與監(jiān)理單位之間形成了以經(jīng)濟(jì)合同為紐帶,以提高工程質(zhì)量和建設(shè)水平為目的的相互制約、相互協(xié)作、相互促進(jìn)的一種新的建設(shè)項(xiàng)目管理運(yùn)行機(jī)制。這種機(jī)制為提高建設(shè)工程的質(zhì)量、節(jié)約建筑工程的投資、縮短建筑工程的工期創(chuàng)造了有利條件。
在接下來(lái)的實(shí)習(xí)中,我們對(duì)給水排水工程工程施工進(jìn)行了學(xué)習(xí)。
總所周知,在任何工程項(xiàng)目中,設(shè)計(jì)與施工都是創(chuàng)造性的工作,兩者相互配合,相輔相成。
設(shè)計(jì)工作是指工程建設(shè)目標(biāo),運(yùn)用工程技術(shù)和經(jīng)濟(jì)方法,對(duì)建設(shè)工程的工藝、土木、建筑、公用環(huán)境等系統(tǒng)進(jìn)行綜合策劃,論證編制建設(shè)所需要的設(shè)計(jì)文件及相關(guān)活動(dòng)。其主要內(nèi)容包括:
1.基礎(chǔ)資料準(zhǔn)備:包括工程概況、地形圖、地質(zhì)資料、任務(wù)下達(dá)書(shū)、道路工程投資資料,并結(jié)合以上資料進(jìn)行現(xiàn)場(chǎng)踏勘;
2.方案設(shè)計(jì)、比選:較多的與甲方、審批部門(mén)的溝通,項(xiàng)目建設(shè)書(shū)、可行性研究報(bào)告,管線敷設(shè)方案的比選,工程沿線可作為雨水、污水出入關(guān)取得確定;
3.施工圖設(shè)計(jì):依照設(shè)計(jì)原則進(jìn)行要求達(dá)到經(jīng)濟(jì)效益最優(yōu),主要設(shè)計(jì)參數(shù)分平面設(shè)計(jì)參數(shù)、縱斷面設(shè)計(jì)參數(shù)、橫斷面設(shè)計(jì)參數(shù)及各類孔口設(shè)計(jì)參數(shù),設(shè)計(jì)過(guò)程中需專業(yè)協(xié)調(diào),并遵循設(shè)計(jì)、施工、驗(yàn)收規(guī)范,在施工中可采用新工藝,新材料,有必要時(shí)需繪制細(xì)部圖和大樣圖;
4.技術(shù)交流:以便對(duì)方案中存在問(wèn)題進(jìn)行改進(jìn)和提高;
5.設(shè)計(jì)變更:針對(duì)施工中出現(xiàn)問(wèn)題所采取的措施。
我們所學(xué)的給水排水工程專業(yè),分為兩個(gè)大方向:市政和建筑。在接下來(lái)的實(shí)習(xí)中,我們針對(duì)市政工程設(shè)計(jì)這一方向進(jìn)行了學(xué)習(xí)。市政工程項(xiàng)目建設(shè)過(guò)程由機(jī)會(huì)研究,初步可行性研究(項(xiàng)目建議書(shū)),可行性研究報(bào)告,方案設(shè)計(jì)(兩個(gè)以上可行方案,在進(jìn)行經(jīng)濟(jì)、環(huán)境、社會(huì)效益等方面的綜合比較選出最優(yōu)方案),施工圖設(shè)計(jì),工程施工,竣工驗(yàn)收,項(xiàng)目管理等八項(xiàng)組成。工程設(shè)計(jì)內(nèi)容包括方案設(shè)計(jì),初步設(shè)計(jì),施工圖設(shè)計(jì)。需注意,初步設(shè)計(jì)和施工圖設(shè)計(jì)最主要區(qū)別為施工圖設(shè)計(jì)帶大樣圖。工程設(shè)計(jì)須依據(jù)建設(shè)單位的委托、意見(jiàn)及要求,前期的項(xiàng)目建設(shè)書(shū)、可行性研究報(bào)告(評(píng)審),管線綜合、其他專業(yè)及相關(guān)資料、法律法規(guī)即專業(yè)設(shè)計(jì)規(guī)范進(jìn)行。其步驟設(shè)計(jì)為:
1.現(xiàn)場(chǎng)踏勘:弄清現(xiàn)場(chǎng)諸如雨水排放、污染源等情況;
2.資料調(diào)查
3.依據(jù)規(guī)范、法規(guī)、設(shè)計(jì)經(jīng)驗(yàn)確定分水嶺,劃分排水區(qū)域,選擇設(shè)計(jì)參數(shù);
4.應(yīng)盡量按照管線綜合規(guī)劃設(shè)計(jì);
5.現(xiàn)場(chǎng)施工過(guò)程中的技術(shù)服務(wù);
6.設(shè)計(jì)變更:注明項(xiàng)目名稱、位置、數(shù)量、規(guī)模等,經(jīng)業(yè)主、施工、監(jiān)理三方簽字方能生效。
再設(shè)計(jì)結(jié)束后,便可開(kāi)始施工。管道工程施工的內(nèi)容主要有設(shè)計(jì)交底(介紹工程項(xiàng)目,說(shuō)明施工中需注意的問(wèn)題和存在的疑問(wèn),并指出錯(cuò)誤),收集資料(包括現(xiàn)場(chǎng)管線情況、地質(zhì)水文、水電、機(jī)械等),施工組織(工程概況、施工方法、材料機(jī)械的供應(yīng)、安全、工期計(jì)劃、環(huán)境保護(hù)等),測(cè)量(根據(jù)水準(zhǔn)點(diǎn)確定井位)。在施工完成后,還需根據(jù)施工圖設(shè)計(jì)變更、中間驗(yàn)收數(shù)據(jù)、材料合格證及驗(yàn)收?qǐng)?bào)告進(jìn)行驗(yàn)收方能投入使用。中間驗(yàn)收數(shù)據(jù)是在施工中,也所做的中間驗(yàn)收的記錄,包括管道、地基、基礎(chǔ)等。
在對(duì)市政工程設(shè)計(jì)的理論知識(shí)學(xué)習(xí)了之后,我們還對(duì)工程實(shí)例進(jìn)行了學(xué)習(xí),使我們所學(xué)的知識(shí)得以鞏固,在腦中初步形成了工程的概念。
這一天,我們學(xué)習(xí)了排水工程。
排水工程是給水排水工程的一個(gè)重要組成部分。其規(guī)劃與設(shè)計(jì)應(yīng)符合區(qū)域規(guī)劃以及城市和工業(yè)企業(yè)的總體規(guī)劃,并應(yīng)與城市和工業(yè)企業(yè)中其他單項(xiàng)工程建設(shè)密切配合,互相協(xié)調(diào);要與臨近區(qū)域的污水和污泥的處理和處置協(xié)調(diào);應(yīng)處理好污染源治理與集中處理的關(guān)系;城市污水是可貴的淡水資源,在規(guī)劃重要考慮污水經(jīng)再生后回用的方案;如排果設(shè)計(jì)水區(qū)域內(nèi)尚需考慮給水和防洪的問(wèn)題,污水排水工程與給水工程協(xié)調(diào),雨水排水工程與防洪工程協(xié)調(diào),以節(jié)省總投資所謂實(shí)踐是檢驗(yàn)真理的唯一標(biāo)準(zhǔn),通過(guò)旁站,使我近距離的觀察了整個(gè)房屋的建造過(guò)程,學(xué)到了很多很適用的具體的施工知識(shí),這些知識(shí)往往是我在學(xué)校很少接觸,很少注意的,但又是十分重要、十分基礎(chǔ)的知識(shí)比如,鋼筋的綁扎,底層基礎(chǔ)鋼筋的綁扎首先要放樣,每一跨度里鋼筋的接頭數(shù)只有25%,即4根鋼筋里只有一個(gè)接頭,另外,接頭要盡量放在受壓區(qū)內(nèi)。在砌墻的過(guò)程中,如遇到墻要轉(zhuǎn)角或相交的時(shí)候,兩墻要一起砌起來(lái),在留槎的過(guò)程中,可以留斜槎,如果要留直槎,則必須留陽(yáng)槎,且要有拉結(jié)筋,不能留陰槎。在進(jìn)行混凝土施工的過(guò)程中,要特別注意混凝土的配合比,在天熱的時(shí)候要注意養(yǎng)護(hù)。
通過(guò)這次實(shí)習(xí),我學(xué)到了很多知識(shí)那是在課堂上無(wú)法學(xué)到的東西。在我看來(lái)理論知識(shí)固然重要,不過(guò)實(shí)踐更重要。在施工中,很多時(shí)候靠的是經(jīng)驗(yàn),在經(jīng)驗(yàn)來(lái)源的同時(shí)用理論知識(shí)去檢驗(yàn)。所以就算理論知識(shí)掌握得在好,沒(méi)有實(shí)習(xí)和工作的實(shí)際經(jīng)驗(yàn)也很難解決施工中時(shí)刻遇到的種種問(wèn)題。記得實(shí)習(xí)第一天,李工說(shuō)過(guò)一句話一句不得不讓我折服的話:他說(shuō),如果說(shuō)理論知識(shí)我比不上你們,因?yàn)槟銈兘邮苓^(guò)大學(xué)教育而我自己沒(méi)有。但是我有多年的工作經(jīng)驗(yàn)即便沒(méi)上過(guò)大學(xué),對(duì)這些問(wèn)題的解決也很熟悉。只要你們有過(guò)實(shí)際工作一年的經(jīng)驗(yàn),就會(huì)很熟悉了。在我看來(lái),這或許是前輩的謙虛和對(duì)我們的鼓勵(lì)以及對(duì)我們的要求吧。我想也是,在這樣看來(lái) 我們沒(méi)有理由做得更好。在一次和白工的閑聊中,他作為一個(gè)前輩給了我們很多啟示。
建筑專業(yè)實(shí)習(xí)報(bào)告精選范文三
實(shí)習(xí)目的:通過(guò)實(shí)地的測(cè)量實(shí)習(xí),鞏固課堂所學(xué)的理論知識(shí),熟練掌握水準(zhǔn)儀、經(jīng)緯儀的基本操作,掌握導(dǎo)線測(cè)量、三角高程測(cè)量、四等水準(zhǔn)測(cè)量的觀測(cè)和計(jì)算方法,學(xué)習(xí)如何進(jìn)行實(shí)地的地形控制測(cè)量和地形圖的展繪、拼接,在實(shí)習(xí)的同時(shí)也體驗(yàn)一下實(shí)際測(cè)量工作的生活、培養(yǎng)團(tuán)隊(duì)協(xié)作能力。
實(shí)習(xí)時(shí)間:20XX年5月11日到20XX年5月19日
實(shí)習(xí)地點(diǎn):江西省蠶桑茶葉研究所
實(shí)習(xí)人員:14水利水電工程專業(yè)全體學(xué)生及老師
實(shí)習(xí)儀器:經(jīng)緯儀,水準(zhǔn)儀,水準(zhǔn)尺,尺墊,計(jì)算器,記錄本,三角板等
實(shí)習(xí)計(jì)劃:踏勘選點(diǎn)一天,控制測(cè)量三天,控制點(diǎn)坐標(biāo)計(jì)算和展繪一天,地形測(cè)量四天,拼圖一天(計(jì)劃十天,實(shí)際實(shí)習(xí)時(shí)間為九天)。
實(shí)習(xí)經(jīng)歷及體會(huì):
2015年5月11日上午,帶著愉快的心情,坐上一路向南的汽車,開(kāi)始了我們本學(xué)期的工程測(cè)量實(shí)習(xí),這也是我們專業(yè)第三次的實(shí)習(xí)!一個(gè)多小時(shí)之后,我們來(lái)到了我們實(shí)習(xí)的目的地江西省桑蠶茶葉研究所!
在這里不得不介紹一下江西省蠶桑茶葉研究所了,江西省蠶桑茶葉研究所始建于1958年,經(jīng)50年的建設(shè),現(xiàn)已發(fā)展成集蠶桑、茶葉科學(xué)研究與科技服務(wù),農(nóng)業(yè)良種繁育與推廣,園林設(shè)計(jì)與苗木栽培及現(xiàn)代農(nóng)業(yè)展示為一體的科研事業(yè)單位。所內(nèi)主要經(jīng)營(yíng)項(xiàng)目有:蠶種培育、茶葉加工、苗木種植、園林設(shè)計(jì)和果樹(shù)栽培等。我們所住的招待所周圍空氣清新,樹(shù)木繁茂,山塘眾多,地貌豐富,植被覆蓋率超高,而且民風(fēng)淳樸,安居樂(lè)業(yè),的確是旅游觀光、休閑度假的理想之地,是人民居住的天堂啊!
當(dāng)日下午,在招待所門(mén)前,我們的歐陽(yáng)老師簡(jiǎn)單地開(kāi)了個(gè)動(dòng)員大會(huì),他重申了我們此次實(shí)習(xí)的意義和要求,強(qiáng)調(diào)了應(yīng)當(dāng)遵守的一些紀(jì)隸和安全事項(xiàng),還為我們打氣,鼓勵(lì)我們勇敢機(jī)智面對(duì)將要到來(lái)的困難!接著馬上就是踏勘選點(diǎn),圍繞著招待所外面的8字圈,我們選取了AB兩條線路,每條12個(gè)點(diǎn),就這樣,我們10幾個(gè)小組被分成4路!
接下來(lái)的頭3天是平面控制測(cè)量!我們小組先是用了一天半的時(shí)間完成角度測(cè)量,然后用一天半來(lái)完成高程測(cè)量。
1、用經(jīng)緯儀來(lái)測(cè)角度,架設(shè)儀器:將經(jīng)緯儀放置在架頭上,使架頭大致水平,旋緊連接螺旋。
2 、對(duì)中:目的是使儀器中心與測(cè)站點(diǎn)位于同一鉛垂線上。可以移動(dòng)腳架、旋轉(zhuǎn)腳螺旋使對(duì)中標(biāo)志準(zhǔn)確對(duì)準(zhǔn)測(cè)站點(diǎn)的中心。
3 、整平:目的是使儀器豎軸鉛垂,水平度盤(pán)水平。根據(jù)水平角的定義,是兩條方向線的夾角在水平面上的投影,所以水平度盤(pán)一定要水平。粗平:伸縮腳架腿,使圓水準(zhǔn)氣泡居中。檢查并精確對(duì)中:檢查對(duì)中標(biāo)志是否偏離地面點(diǎn)。如果偏離了,旋松三角架上的連接螺旋,平移儀器基座使對(duì)中標(biāo)志準(zhǔn)確對(duì)準(zhǔn)測(cè)站點(diǎn)的中心,擰緊連接螺旋。精平:旋轉(zhuǎn)腳螺旋,使管水準(zhǔn)氣泡居中。
4 、瞄準(zhǔn)與讀數(shù):① 目鏡對(duì)光:目鏡調(diào)焦使十字絲清晰。② 瞄準(zhǔn)和物鏡對(duì)光:粗瞄目標(biāo),物鏡調(diào)焦使目標(biāo)清晰。注意消除視差。精瞄目標(biāo)。③ 讀數(shù):調(diào)整照明反光鏡,使讀數(shù)窗亮度適中,旋轉(zhuǎn)讀數(shù)顯微鏡的目鏡使刻劃線清晰,然后讀數(shù)。
用水準(zhǔn)儀來(lái)測(cè)高程時(shí),先將儀器的三腳架張開(kāi),使其高度適中,架頭大致水平,并將腳架踩實(shí);再開(kāi)箱取出儀器,將其固連在三腳架上。對(duì)照儀器,指出準(zhǔn)星、缺口、目鏡及其調(diào)焦螺旋、物鏡、對(duì)光螺旋、管水準(zhǔn)儀、圓水準(zhǔn)儀、制動(dòng)和微動(dòng)螺旋、微傾螺旋、腳螺旋等,了解其作用并熟悉其使用方法。對(duì)照水準(zhǔn)尺,熟悉其分劃注記并練習(xí)讀數(shù)。
(1)粗平:雙手食指和拇指各擰一只腳螺旋,同時(shí)以相反的方向轉(zhuǎn)動(dòng),使圓水準(zhǔn)器氣泡向中間移動(dòng);再擰另一只腳螺旋,使圓氣泡居中。若一次不能居中,可反復(fù)進(jìn)行(觀察左手拇指轉(zhuǎn)動(dòng)腳螺旋的方向與氣泡移動(dòng)方向之間的關(guān)系)。
(2)瞄準(zhǔn):在離儀器不遠(yuǎn)處選一點(diǎn)A,并在其上立一根水準(zhǔn)尺;轉(zhuǎn)動(dòng)目鏡調(diào)焦螺旋使十字絲清晰;松開(kāi)制動(dòng)螺旋,轉(zhuǎn)動(dòng)儀器,用缺口和準(zhǔn)星大致瞄準(zhǔn)A點(diǎn)水準(zhǔn)尺,擰緊制動(dòng)螺旋;轉(zhuǎn)動(dòng)對(duì)光螺旋看清水準(zhǔn)尺;轉(zhuǎn)動(dòng)微動(dòng)螺旋使水準(zhǔn)尺位于視線中央;再轉(zhuǎn)動(dòng)對(duì)光螺旋,使目標(biāo)清晰并消除視差(觀察視差現(xiàn)象,練習(xí)消除方法)。
(3)精平:轉(zhuǎn)動(dòng)微傾螺旋,使符合水準(zhǔn)管氣泡兩端的半影像吻合(成圓弧狀),即水準(zhǔn)管氣泡居中(觀察微傾螺旋轉(zhuǎn)動(dòng)方向與氣泡移動(dòng)方向之間的關(guān)系)。
(4)讀數(shù): 從望遠(yuǎn)鏡中觀察十字絲橫絲在水準(zhǔn)尺上的分劃位置,讀取4位數(shù)字,即直接讀出米(m)、分米(dm)、厘米(cm)的數(shù)值,估讀毫米(mm)的數(shù)值,記為后視讀數(shù)a。注意讀數(shù)完畢時(shí)水準(zhǔn)管氣泡仍需居中。若不居中,應(yīng)再資助精平,重新讀數(shù)。
(5)分別 在B、C、D等點(diǎn)立尺按(2)~(4)步讀取前視讀數(shù)b,記錄。
(6)計(jì)算 高差,h=a b
(7)改變儀器高度或搬站再次觀測(cè)A與B、C、D等的高差,進(jìn)行比較。
第五天的控制點(diǎn)坐標(biāo)計(jì)算和展繪工作,前面三天的測(cè)量我們歷經(jīng)辛苦,一邊測(cè)量,一邊記錄~計(jì)算~檢查~校對(duì)誤差,最終很好地控制了誤差,因此利用老師給出了B9點(diǎn)的三維坐標(biāo),很快地完成了坐標(biāo)計(jì)算和展繪的工作!
最后的四天是碎部測(cè)量和地形圖的描繪。首先進(jìn)行碎部測(cè)量前的準(zhǔn)備工作,在各導(dǎo)線控制點(diǎn)上測(cè)定碎部點(diǎn),同時(shí)描繪地物和地貌。
我們小組采用的是DJ6的經(jīng)緯儀,進(jìn)行碎部測(cè)量。將經(jīng)緯儀安置在控制點(diǎn)上,測(cè)繪板安置于測(cè)站旁,用經(jīng)緯儀測(cè)出碎部點(diǎn)方向與已知方向之間的水平夾角;再用視距測(cè)量方法測(cè)出測(cè)站到碎部點(diǎn)的水平距離及碎部點(diǎn)的高程;然后根據(jù)測(cè)定的水平角和水平距離,用量角器和比例尺將碎部點(diǎn)展繪在圖紙上,并在點(diǎn)的右側(cè)注記其高程。然后對(duì)照實(shí)地情況,按照地形圖圖式規(guī)定的符號(hào)繪出地形圖。
在這里向講下地形圖的檢查和整飾
(1)地形圖的檢查
在測(cè)圖中,測(cè)量人員應(yīng)做到隨測(cè)隨檢查。為了確保成圖的質(zhì)量,在地形圖測(cè)完后,必須對(duì)完成的成果成圖資料進(jìn)行嚴(yán)格的自檢和互檢。圖的檢查可分為室內(nèi)檢查和室外檢查兩部分。
①室內(nèi)檢查的內(nèi)容有圖面地物、地貌是否清晰易讀,各種符號(hào)、注記是否正確,等高線與地貌特征點(diǎn)的高程是否相符等。
②野外檢查是在室內(nèi)檢查的基礎(chǔ)上進(jìn)行重點(diǎn)抽查。檢查方法分巡視檢查和儀器檢查兩種。巡視檢查時(shí)應(yīng)攜帶測(cè)圖板,根據(jù)室內(nèi)檢查的重點(diǎn),按預(yù)定的巡視檢查路線,進(jìn)行實(shí)地對(duì)照查看。主要查看地物、地貌各要素測(cè)繪是否正確、齊全,取舍是否恰當(dāng)。等高線的勾繪是否逼真,圖式符號(hào)運(yùn)用是否正確等;儀器設(shè)站檢查是在室內(nèi)檢查和野外巡視檢查的基礎(chǔ)上進(jìn)行的。除對(duì)發(fā)現(xiàn)的問(wèn)題進(jìn)行補(bǔ)測(cè)和修正外,還要對(duì)本測(cè)站所測(cè)地形進(jìn)行檢查,看所測(cè)地形圖是否符合要求,如果發(fā)現(xiàn)點(diǎn)位的誤差超限,應(yīng)按正確的觀測(cè)結(jié)果修正。
(2)地形圖的整飾
原圖經(jīng)過(guò)檢查后,還應(yīng)按規(guī)定的地形圖圖式符號(hào)對(duì)地物、地貌進(jìn)行清繪和整飾,使圖面更加合理、清晰、美觀。整飾的順序是先圖內(nèi)后圖外,先注記后符號(hào),先地物后地貌。最后寫(xiě)出圖名、比例尺、坐標(biāo)系統(tǒng)及高程系統(tǒng)、施測(cè)單位、測(cè)繪者及施測(cè)日期等。
在此次工程測(cè)量實(shí)習(xí)的過(guò)程中,我們也遇到了一些困難和問(wèn)題。剛開(kāi)始的時(shí)候,我們擔(dān)心自己測(cè)不好,要是讓我擺弄水準(zhǔn)儀和經(jīng)緯儀,沒(méi)什么問(wèn)題。但想到實(shí)習(xí)最后是要地形測(cè)量和地形圖的繪制,心里就沒(méi)底了,覺(jué)得我們好難完成任務(wù)。但還好,我們的團(tuán)結(jié)、默契,克服了測(cè)量中的種種問(wèn)題,終于按時(shí)完成了任務(wù)。
以下是其中一些實(shí)際測(cè)量工作中遇到的問(wèn)題:
1、準(zhǔn)儀和經(jīng)緯儀測(cè)量的過(guò)程當(dāng)中,偶爾出現(xiàn)比較大的誤差,經(jīng)過(guò)我們對(duì)誤差來(lái)源的分析后,再進(jìn)行重新的測(cè)量和計(jì)算,誤差減小到了允許的范圍。
2、標(biāo)尺時(shí),需要立直,盡量避免晃動(dòng),有晃動(dòng)時(shí),應(yīng)該選擇數(shù)據(jù)最小的時(shí)候進(jìn)行讀取外,還應(yīng)該選在合適而且重要的點(diǎn)。因此,選點(diǎn)是很重要的。點(diǎn)一定要選在有代表性的地方,同時(shí)要注意并非點(diǎn)越多越好,相反選取的無(wú)用點(diǎn)過(guò)多不但會(huì)增加工作量,浪費(fèi)寶貴的時(shí)間,而且會(huì)因點(diǎn)多而雜亂產(chǎn)生較大的誤差。
3、計(jì)算問(wèn)題。計(jì)算必須由包括初步的計(jì)算和校核。在此過(guò)程當(dāng)中,也還是出現(xiàn)了計(jì)算錯(cuò)誤的問(wèn)題,我們?cè)诓粩嗟闹貜?fù)校核計(jì)算后算出了正確的數(shù)值,讓誤差達(dá)到了允許范圍。
4、團(tuán)結(jié)協(xié)作。剛開(kāi)始的時(shí)候,分工不是很明確,所以耽誤了工作時(shí)間。后來(lái),我們吸取教訓(xùn),分工明確,精誠(chéng)合作,使得我們的工作速度和質(zhì)量都有所提升。
5、每次讀數(shù)前,定將長(zhǎng)水準(zhǔn)管氣泡調(diào)平,則造成的誤差會(huì)很大。
6、最好使單線與目標(biāo)重合,如果目標(biāo)有一定寬度,可以用雙絲夾住目標(biāo)。
7、進(jìn)行量?jī)x器高時(shí)候一定要小心,因?yàn)樯晕⑴隽艘幌聝x器,就要重新調(diào)整對(duì)中水平,否則就會(huì)導(dǎo)致數(shù)據(jù)錯(cuò)誤,也可能導(dǎo)致儀器的損壞。
8、記錄數(shù)據(jù)時(shí),每位成員都要細(xì)心,既要看得準(zhǔn),還要果斷,不能猶豫不決,任何一個(gè)錯(cuò)誤都有可能導(dǎo)致最終的成果的錯(cuò)誤。
9、道路和主要建筑物確定下來(lái),然后在添加其余次要方面,這樣不但條理清楚,有利于作圖的準(zhǔn)確和隨時(shí)進(jìn)行實(shí)物和圖形的對(duì)比從而檢驗(yàn)測(cè)量數(shù)據(jù)的準(zhǔn)確與否。我們還要對(duì)所測(cè)過(guò)得范圍能夠做到胸中有數(shù),避免漏測(cè)、重測(cè)。
通過(guò)此次在省蠶茶所的測(cè)量實(shí)習(xí),我們培養(yǎng)了理論聯(lián)系實(shí)際、分析問(wèn)題和解決問(wèn)題的能力以及實(shí)際動(dòng)手操作能力,并培養(yǎng)了嚴(yán)格認(rèn)真的科學(xué)態(tài)度、實(shí)事求是的工作作風(fēng)、吃苦耐勞的精神和團(tuán)結(jié)協(xié)作的能力,為今后從事實(shí)際測(cè)繪工作打下良好的基礎(chǔ)。
關(guān)鍵詞:新疆;工程監(jiān)理;特點(diǎn);對(duì)策
Xinjiang military engineering supervision
Chi Wei-sheng1Wang Xiao-long1Yang Bing-hui2
(1.Air Force Engineering University, Xi'an 710038, China;
2. Lanzhou Air Force Logistics at the airport barracks, Lanzhou 730020, China)
Abstract: In the last two years, we project supervision borne by the five army engineering supervision and project in the Xinjiang region. Army engineering and Xinjiang geographical features in the supervision process targeted research and analysis, and to take appropriate measures and countermeasures, rationalization proposals put forward to the owners and design units, to achieve the desired purpose, Supervision target . Through the elaboration of this paper, in order to follow-up supervision and project reference.
Keywords: Xinjiang; engineering supervision; characteristics; countermeasures
2010年6月我們工程監(jiān)理所先后承擔(dān)了新疆地區(qū)五個(gè)軍隊(duì)工程的監(jiān)理項(xiàng)目,南到和田北到福海,跨越了南疆和北疆。至2012年底已開(kāi)工項(xiàng)目全部進(jìn)行了初驗(yàn)。新疆地區(qū)五個(gè)軍隊(duì)工程的監(jiān)理工作值得進(jìn)行總結(jié),供后續(xù)監(jiān)理項(xiàng)目有所借鑒。
1.新疆地區(qū)軍隊(duì)工程特點(diǎn)
總結(jié)回顧五個(gè)工程的監(jiān)理工作,新疆地區(qū)軍隊(duì)工程主要特點(diǎn)有以下五點(diǎn):
1.1工程類型多,含蓋了場(chǎng)道工程、磚混結(jié)構(gòu)工程、框架結(jié)構(gòu)工程、鋼結(jié)構(gòu)工程、地下工程、給排水工程、供暖工程、供電工程、供油工程、通信導(dǎo)航工程等;
1.2建筑類型繁多,單體數(shù)量多建筑面積面積小,最小單體建筑面積18平米;
1.3土基鹽堿含量大,尤其南疆地區(qū)更嚴(yán)重。2003年竣工的和田機(jī)場(chǎng)及2007年竣工的庫(kù)爾勒機(jī)場(chǎng),無(wú)論場(chǎng)道工程還是建筑工程都出現(xiàn)鹽脹問(wèn)題,嚴(yán)重的將道面板脹起二至三十厘米,建筑基礎(chǔ)腐蝕嚴(yán)重個(gè)別導(dǎo)致拆除重建;
1.4烏魯木齊機(jī)場(chǎng)場(chǎng)道工程所使用的級(jí)配碎石堿活性檢驗(yàn)超標(biāo);
1.5《2011年自治區(qū)建設(shè)工程質(zhì)量監(jiān)督工作要點(diǎn)》指出加強(qiáng)工程責(zé)任主體質(zhì)量行為的監(jiān)管,嚴(yán)格查處施工單位使用劣質(zhì)材料,施工技術(shù)資料弄虛作假行為,加強(qiáng)總監(jiān)和監(jiān)理人員從業(yè)資格的監(jiān)督,強(qiáng)化總監(jiān)及監(jiān)理人員職責(zé)的履行。自治區(qū)根據(jù)近年來(lái)工程主體外觀質(zhì)量存在的問(wèn)題,制定專項(xiàng)治理方案,重點(diǎn)治理磚混結(jié)構(gòu)中構(gòu)造柱、圈梁、樓梯等砼構(gòu)件跑模、漲模、蜂窩麻面等質(zhì)量缺陷。
2.加強(qiáng)對(duì)執(zhí)業(yè)人員的培訓(xùn),提高業(yè)務(wù)素質(zhì)
監(jiān)理人員的素質(zhì)是形象的窗口,要重視、加強(qiáng)對(duì)所屬人員的培訓(xùn)。是提高監(jiān)理質(zhì)量的有效途徑,主要應(yīng)抓好兩個(gè)環(huán)節(jié)的工作。
一是及時(shí)、適時(shí)及做好施工圖的熟悉、審閱工作。收到全套施工圖紙后,組織各專業(yè)監(jiān)理工程師認(rèn)真審閱圖紙,領(lǐng)會(huì)設(shè)計(jì)意圖,熟悉圖紙細(xì)節(jié),明確工程監(jiān)理的關(guān)鍵部位,對(duì)控制目標(biāo)進(jìn)行分解,編制分項(xiàng)工程、關(guān)鍵部位監(jiān)理旁站規(guī)劃及實(shí)施細(xì)則。施工圖審閱中,克服和消除“施工圖是經(jīng)過(guò)審查的”、只要“按圖監(jiān)理就可以”的思想。領(lǐng)會(huì)、理解設(shè)計(jì)說(shuō)明中“未盡事宜按有關(guān)規(guī)范、標(biāo)準(zhǔn)施工”的深層含義?!凹埳险劚睍r(shí),要善于發(fā)現(xiàn)問(wèn)題,提出建議。針對(duì)鹽脹問(wèn)題,建議業(yè)主和設(shè)計(jì)單位在道面板或建筑基礎(chǔ)下增設(shè)30厘米碎石基層,作為隔離層以消除或減少鹽脹;建筑基礎(chǔ)外表面熱瀝青腐處理,防止或減少腐蝕,達(dá)到了良好效果。
二是適時(shí)做好從業(yè)人員的不定期培訓(xùn)。新知識(shí)、新材料、新技術(shù)在各行業(yè)應(yīng)用快而廣。更新觀念,更新知識(shí),更新技術(shù)要與時(shí)俱進(jìn)。當(dāng)國(guó)家對(duì)建筑業(yè)有新的法規(guī)、政策出臺(tái)時(shí);當(dāng)某工程質(zhì)量事故造成重大損失和嚴(yán)重后果影響極大時(shí);當(dāng)國(guó)家對(duì)建筑新材料、新技術(shù)推廣應(yīng)用時(shí);對(duì)規(guī)范、圖集作較大調(diào)整時(shí),監(jiān)理從業(yè)人員要進(jìn)行強(qiáng)化培訓(xùn)。堅(jiān)持自學(xué)與培訓(xùn)相結(jié)合,不斷拓寬知識(shí)面,掌握從業(yè)的基本技能。
3.嚴(yán)格工程質(zhì)量控制,確保工程質(zhì)量
本著“嚴(yán)格監(jiān)理保質(zhì)量,熱情服務(wù)創(chuàng)品牌”的要求,對(duì)工程的實(shí)施進(jìn)行了全面、有效的監(jiān)督管理。按監(jiān)理規(guī)劃和細(xì)則的要求,從原材料進(jìn)場(chǎng)直至成品驗(yàn)收,進(jìn)行了全面跟蹤監(jiān)控,實(shí)現(xiàn)了監(jiān)理目標(biāo),得到了業(yè)主的認(rèn)可。主要做了以下工作:
3.1施工前的控制
一是審查施工單位的項(xiàng)目管理機(jī)構(gòu)和管理組織。包括審查施工單位的質(zhì)量保證體系和技術(shù)管理制度是否健全、檢查工程技術(shù)管理人員是否到位;審查施工技術(shù)人員的資格證、上崗證是否滿足工程要求;檢查特殊工種作業(yè)人員是否持證上崗及備案情況;檢查施工技術(shù)交底情況,崗前安全教育培訓(xùn)情況。二是嚴(yán)把進(jìn)場(chǎng)材料、構(gòu)配件、設(shè)備的質(zhì)量關(guān)。包括工程所用材料、構(gòu)配件、設(shè)備進(jìn)場(chǎng)必須有出廠合格證或質(zhì)保書(shū)、中文標(biāo)識(shí)、檢測(cè)報(bào)告,否則不準(zhǔn)進(jìn)場(chǎng)。重要部位使用的原材料、構(gòu)配件等必須按照有關(guān)規(guī)定進(jìn)行抽樣復(fù)檢,復(fù)檢合格后方可使用,對(duì)于未經(jīng)復(fù)檢或復(fù)檢不合格的原材料、構(gòu)配件等不準(zhǔn)堆放在施工現(xiàn)場(chǎng)。針對(duì)烏魯木齊機(jī)場(chǎng)場(chǎng)道工程所使用的級(jí)配碎石堿活性檢驗(yàn)超標(biāo)問(wèn)題,建議業(yè)主和設(shè)計(jì)單位召開(kāi)專家論證會(huì),現(xiàn)場(chǎng)提出方案解決問(wèn)題。三是檢查施工用機(jī)械設(shè)備的規(guī)格型號(hào)、性能參數(shù)、完好率是否滿足工程要求,機(jī)械數(shù)量是否滿足工程要求,如不滿足,則責(zé)令施工單位予以更換或增加數(shù)量;四是審查施工方案,對(duì)施工單位報(bào)送的施工組織設(shè)計(jì)、施工技術(shù)方案、檢測(cè)方法、進(jìn)度控制措施、安全控制措施等認(rèn)真進(jìn)行審查,并結(jié)合實(shí)際情況進(jìn)行全面分析、綜合考慮,力求方案的技術(shù)可行、經(jīng)濟(jì)合理。
3.2施工過(guò)程的控制
施工過(guò)程是工程實(shí)體形成的過(guò)程,由于施工的特殊性,質(zhì)量受到主觀客觀多種因素的影響,其中某一環(huán)節(jié)出現(xiàn)問(wèn)題都會(huì)產(chǎn)生嚴(yán)重不良的后果。針對(duì)此特點(diǎn),我們具體做了一些工作:一是每周召開(kāi)監(jiān)理例會(huì),研究施工中出現(xiàn)的問(wèn)題,總結(jié)經(jīng)驗(yàn)教訓(xùn),安排好下周工作,提醒施工單位應(yīng)注意的問(wèn)題;二是對(duì)已出現(xiàn)的問(wèn)題及時(shí)發(fā)監(jiān)理通知,要求施工單位限期改正或返工,整改或返工完畢并經(jīng)監(jiān)理工程師驗(yàn)收合格后才允許進(jìn)入下一道工序施工;三是嚴(yán)格要求施工單位實(shí)行“自檢、互檢、交接檢”的“三檢制度”,嚴(yán)格要求施工單位遵守報(bào)驗(yàn)制度,每一道工序施工完成后報(bào)監(jiān)理工程師驗(yàn)收,驗(yàn)收合格并簽署監(jiān)理意見(jiàn)后才能進(jìn)入下一道工序施工,未經(jīng)驗(yàn)收或不合格的工序嚴(yán)禁隱蔽或進(jìn)行下一道工序施工;四是落實(shí)旁站制度,保證關(guān)鍵部位、關(guān)鍵工序的工程質(zhì)量。監(jiān)理工作的重點(diǎn)要放在事前控制,這是監(jiān)理職能的要求。關(guān)鍵部位、關(guān)鍵工序的隱蔽、施工,監(jiān)理人員要實(shí)行旁站,因?yàn)殛P(guān)鍵部位、關(guān)鍵工序一旦形成,輕則做返工處理影響工期,重則違反強(qiáng)制性條文,留下工程質(zhì)量隱患或永久缺陷。制定針對(duì)性強(qiáng)、符合所監(jiān)工程特點(diǎn)的監(jiān)理旁站計(jì)劃,并在實(shí)際監(jiān)理活動(dòng)中予以落實(shí),更好地體現(xiàn)監(jiān)理單位綜合水平和現(xiàn)場(chǎng)監(jiān)理人員良好素質(zhì)。
3.3施工過(guò)程中的檢測(cè)
在監(jiān)理工作中以科學(xué)為指導(dǎo),以圖紙規(guī)范標(biāo)準(zhǔn)為準(zhǔn)繩,嚴(yán)格驗(yàn)收程序。驗(yàn)收資料與驗(yàn)收環(huán)節(jié)保持同步,防止施工技術(shù)資料弄虛作假行為。監(jiān)理是受項(xiàng)目業(yè)主的委托,對(duì)工程建設(shè)項(xiàng)目進(jìn)行監(jiān)督管理的組織。監(jiān)理工程中,拒絕或避免施工單位追求進(jìn)度和效益,不進(jìn)行自檢就請(qǐng)監(jiān)理驗(yàn)收檢測(cè),或者施工單位自檢與監(jiān)理驗(yàn)收并行等違反規(guī)定的情況發(fā)生。還要避免施工單位自檢只應(yīng)付于作資料,更要避免施工單位編資料“做”資料。監(jiān)理每次驗(yàn)收時(shí),只要發(fā)現(xiàn)檢驗(yàn)批不合格率超出規(guī)范規(guī)定,就拒絕繼續(xù)驗(yàn)收,責(zé)令進(jìn)行全面整改。整改合格后再次驗(yàn)收,并對(duì)所報(bào)驗(yàn)收段重新全面抽驗(yàn)。這樣可以避免施工單位僅僅整改局部,從而督促其質(zhì)檢員認(rèn)真驗(yàn)收,監(jiān)理人員認(rèn)真驗(yàn)收。只有確保每一個(gè)驗(yàn)收批的質(zhì)量,才能確保分項(xiàng)工程、分部工程、單位工程的質(zhì)量。
4.結(jié)束語(yǔ)
以上是我們開(kāi)展新疆地軍隊(duì)工程監(jiān)理工作中,針對(duì)其特點(diǎn)在監(jiān)理活動(dòng)中所采取的一些做法,達(dá)到了預(yù)期監(jiān)理目標(biāo),實(shí)踐證明所采取的措施和對(duì)策是切實(shí)可行的??晒┪覀?cè)谝院蟮谋O(jiān)理活動(dòng)中借鑒。
目前我們?cè)诒O(jiān)理工作中遇到比較突出的問(wèn)題是體制問(wèn)題(無(wú)編制)和監(jiān)理取費(fèi)標(biāo)準(zhǔn)低的問(wèn)題(有的工程僅有8‰)。這兩個(gè)問(wèn)題直接影響監(jiān)理人員的配置,導(dǎo)致監(jiān)理一線工作的監(jiān)理人員,多數(shù)是監(jiān)理員,而且流動(dòng)性很大,有的工程一個(gè)施工周期,會(huì)調(diào)換多個(gè)監(jiān)理人員。影響監(jiān)理工作的順利開(kāi)展。
參考文獻(xiàn)
[1] 自治區(qū)住房和城鄉(xiāng)建設(shè)廳.2011年自治區(qū)建設(shè)工程質(zhì)量監(jiān)督工作要點(diǎn)[R],2011.3.
[2] 劉洪濤.淺談當(dāng)前工程監(jiān)理的主要問(wèn)題及對(duì)策[J].黑龍江交通科技,2010.6.
_____________________
關(guān)鍵詞:園林建設(shè) 施工
園林是一種長(zhǎng)效的景觀,將實(shí)用與美觀相結(jié)合,才能使園林的作用發(fā)揮到極致。園林工作中的攻堅(jiān)階段就是園林的施工,園林工程的施工對(duì)整個(gè)園林工程有著重要的影響,因此,必須引起我們足夠的重視。
一、目前城市園林建設(shè)施工主要問(wèn)題
1、綠化施工隊(duì)伍良莠不齊,難以充分體現(xiàn)工程的設(shè)計(jì)思想。由于園林施工的嚴(yán)謹(jǐn)性、技術(shù)性都比建筑施工低,導(dǎo)致許多人誤認(rèn)為園林施工不過(guò)是種種樹(shù),鋪鋪草而已;又加上其可觀的利潤(rùn),致使許多素質(zhì)不高的施工隊(duì)紛紛涌入園林施工行業(yè)。他們往往只重視最后的景觀效果,對(duì)土壤、基肥、樹(shù)坑規(guī)格等不是很強(qiáng)調(diào),致使一些樹(shù)木生長(zhǎng)不良,增加了后期維護(hù)管理的難度。
2、由于施工管理水平低,造成返工率,施工進(jìn)度慢,管理成本高,樹(shù)木成活率低,造成不必要的浪費(fèi),還有由于胡亂施工,造成對(duì)環(huán)境污染的現(xiàn)場(chǎng)經(jīng)常出現(xiàn)。
3、缺乏專業(yè)的園林監(jiān)理公司。園林施工監(jiān)理很多都是由建筑工程施工監(jiān)理兼任,加之《城市綠化工程施工及驗(yàn)收規(guī)范》中帶“必須”的強(qiáng)制性條款很少。往往出現(xiàn):不管土壤好不好,能栽就行;不管樹(shù)坑大不大,栽下就行;不管基肥施不施,不死就行。只重視最后的景觀效果,對(duì)土壤、基肥、放樣、樹(shù)坑規(guī)格等不是很強(qiáng)調(diào),致使一些樹(shù)木生長(zhǎng)不良,增加了后期維護(hù)管理的難度,從而難以達(dá)到應(yīng)有的景觀效果。
二、完善園林建設(shè)施工的幾點(diǎn)建議
1、做好施工前的準(zhǔn)備工作
中華人民共和國(guó)行業(yè)標(biāo)準(zhǔn)《城市綠化工程施工及驗(yàn)收規(guī)范》的頒布,為城市園林工程施工與驗(yàn)收提供了詳細(xì)具體的標(biāo)準(zhǔn)。施工單位必須按照規(guī)范,嚴(yán)格按批準(zhǔn)的園林工程設(shè)計(jì)圖紙及有關(guān)文件施工,對(duì)各項(xiàng)園林工程的建設(shè)全過(guò)程實(shí)施全面的工程監(jiān)理和質(zhì)量控制。
首先,切實(shí)做好施工前準(zhǔn)備工作。在掌握設(shè)計(jì)意圖的基礎(chǔ)上,根據(jù)設(shè)計(jì)圖紙對(duì)現(xiàn)場(chǎng)進(jìn)行核對(duì),編制施工計(jì)劃書(shū),認(rèn)真做好場(chǎng)地平整、定點(diǎn)放線、給排水工程等前期工作。其次,嚴(yán)格按設(shè)計(jì)圖紙施工園林工程施工就是按景觀設(shè)計(jì)的要求種植植物并使其成活,設(shè)法使植物盡早發(fā)揮綠化美化的作用。因此,園林工程設(shè)計(jì)是園林工程的靈魂,離開(kāi)了設(shè)計(jì),園林工程的施工將無(wú)從入手。如不嚴(yán)格按圖施工,將會(huì)歪曲整個(gè)設(shè)計(jì)意念,影響園林美化效果。施工人員對(duì)設(shè)計(jì)意圖的掌握、與設(shè)計(jì)單位的密切聯(lián)系、嚴(yán)格按圖施工,是保證園林工程質(zhì)量的基本前提。
2、提高員工素質(zhì),規(guī)范施工行為
施工單位作為園林項(xiàng)目的具體操作者,因而員工的素質(zhì)和施工行為規(guī)范現(xiàn)得尤為重要,要從以下幾點(diǎn)做起:(1)樹(shù)立“質(zhì)量第一”的觀念,使員工的認(rèn)識(shí)統(tǒng)一到工程管理中來(lái)。①組織培訓(xùn)。由于員工的素質(zhì)不一,項(xiàng)目經(jīng)理的層次差異也較大,定期通過(guò)培訓(xùn)的方式,如內(nèi)業(yè)資料培訓(xùn)、施工技術(shù)培訓(xùn)等使參建人員素質(zhì)得以提高。②明確施工要求和計(jì)劃。通過(guò)交底、例會(huì)、現(xiàn)場(chǎng)會(huì)、觀摩會(huì)等形式,明確建設(shè)方的要求和計(jì)劃,使施工單位能跟上建設(shè)單位的節(jié)奏,作到步令統(tǒng)一。③制定詳細(xì)的考核細(xì)則和辦法。通過(guò)制定對(duì)人員、設(shè)備、土壤管理、水分管理、肥料管理中耕除草、修剪工作、植保工作、防臺(tái)防汛、成活率、景觀效果、文明施工、技術(shù)措施等要求使施工程序和施工工藝科學(xué)規(guī)范。④建立獎(jiǎng)懲制度。做到獎(jiǎng)優(yōu)罰劣,給員工帶來(lái)一定的促動(dòng)。(2)注重建設(shè)過(guò)程中的每個(gè)環(huán)節(jié),從源頭控制問(wèn)題的發(fā)生。①對(duì)土方采取一票否決制,建立土方監(jiān)督員制度,通過(guò)合理的土壤改良和地形處理,確保土方質(zhì)量。②建立苗木質(zhì)量的三抽檢制度。從苗源地開(kāi)始把關(guān),確保苗木質(zhì)量。③擬訂苗木的種植及相關(guān)技術(shù)措施細(xì)則。通過(guò)制定《苗木種植技術(shù)要求》、《特殊苗木種植技術(shù)要求》等,確保苗木在采購(gòu)、運(yùn)輸、種植、養(yǎng)護(hù)、綁扎等方面的規(guī)范運(yùn)作,確保種植后的景觀效果。④擬訂養(yǎng)護(hù)管理要求及考核制度。使員工認(rèn)清養(yǎng)護(hù)的重要性,加強(qiáng)苗木后期的養(yǎng)護(hù)工作。⑤制定病蟲(chóng)害發(fā)生的預(yù)測(cè)預(yù)報(bào)制度。將病蟲(chóng)害的發(fā)生控制在早期,避免大規(guī)模病蟲(chóng)害發(fā)生帶來(lái)的損失。
3、加強(qiáng)施工成本管理
園林施工管理中重要的一項(xiàng)任務(wù)就是降低工程造價(jià),也就是對(duì)項(xiàng)目進(jìn)行成本控制。成本控制通常是指在項(xiàng)目成本形成過(guò)程中,對(duì)生產(chǎn)經(jīng)營(yíng)所消耗的能力資源、物質(zhì)資源和費(fèi)用開(kāi)支,進(jìn)行指導(dǎo)、監(jiān)督、調(diào)節(jié)和限制,力求將成本、費(fèi)用降到最低,以保證成本目標(biāo)的實(shí)現(xiàn)。首先,根據(jù)園林施工項(xiàng)目費(fèi)用標(biāo)準(zhǔn)的內(nèi)容,施工項(xiàng)目成本主要由直接成本和間接成本構(gòu)成。直接成本主要由種植土方費(fèi)、工程苗木費(fèi)、種植人工費(fèi)、輔助材料費(fèi)、機(jī)械臺(tái)班費(fèi)及其他直接費(fèi)組成;間接成本包括現(xiàn)場(chǎng)管理人員工資、管理人員工資附加費(fèi)、辦公費(fèi)、差旅費(fèi)、固定資產(chǎn)使用費(fèi)、行政工具使用費(fèi)、職工教育費(fèi)、勞動(dòng)保險(xiǎn)費(fèi)、待業(yè)保險(xiǎn)金和勞動(dòng)保護(hù)費(fèi)、工程保修費(fèi)、工程排污費(fèi)等。其次,園林施工成本控制的原則包括:全員控制原則,全程控制原則,中間控制原則,目標(biāo)管理原則,堅(jiān)持節(jié)約原則,例外管理原則。第三,通過(guò)加強(qiáng)質(zhì)量管理,控制質(zhì)量成本。一是降低停工、返工損失,將其控制在成本預(yù)算的1%以內(nèi)。二是減少質(zhì)量過(guò)剩支出。施工員要嚴(yán)格掌握定額標(biāo)準(zhǔn),力求在保證質(zhì)量的前提下,使人工和材料消耗不超過(guò)定額水平。三是堅(jiān)持現(xiàn)場(chǎng)標(biāo)準(zhǔn)化,堵塞浪費(fèi)漏洞。根據(jù)現(xiàn)場(chǎng)及工程特點(diǎn),合理安排施工現(xiàn)場(chǎng),加強(qiáng)現(xiàn)場(chǎng)安全生產(chǎn)管理,節(jié)約人力物力。
4、加強(qiáng)園林施工管理
××××年工程代建及工程監(jiān)理工作總結(jié)
今年初按照投資中心統(tǒng)一部署我被安排在××咨詢公司從事代建工作,一年來(lái),在中心及公司××經(jīng)理的正確領(lǐng)導(dǎo)下,我認(rèn)真領(lǐng)會(huì)上級(jí)意圖,積極主動(dòng)創(chuàng)造性地開(kāi)展工作;認(rèn)真履行崗位職責(zé),努力學(xué)習(xí)代建方面知識(shí),較好地完成了上級(jí)領(lǐng)導(dǎo)安排的工程代建及工程監(jiān)理任務(wù)?,F(xiàn)將本人一年來(lái)的工作總結(jié)如下:
一、代建工作:
(一)×××街改建工程
今年市政管委重點(diǎn)工程項(xiàng)目開(kāi)工的數(shù)量較多,管委工程科的工作量較大,為了更好的加強(qiáng)對(duì)各工程項(xiàng)目的管理工作,管委工程科×××科長(zhǎng)決定,由我負(fù)責(zé)×××街改建工程,主抓該工程現(xiàn)場(chǎng)施工管理及各參建單位協(xié)調(diào)工作,×××街改建工程于×月××日召開(kāi)了開(kāi)工動(dòng)員會(huì)議,并于×月××日正式動(dòng)工。
在此期間,我編制完成了×××街改建工程項(xiàng)目管理規(guī)劃,認(rèn)真熟悉×××街改建工程設(shè)計(jì)圖紙,對(duì)工程的質(zhì)量、進(jìn)度、投資等要求做到了如指掌;加強(qiáng)對(duì)外協(xié)調(diào)工作。督處配電房占施工場(chǎng)地拆除、橡膠二廠圍墻拆除及路邊樹(shù)木伐移工作;對(duì)內(nèi)協(xié)調(diào)工作。安排市政公司清理施工場(chǎng)地,臨建、圍擋搭設(shè)工作;施工現(xiàn)場(chǎng)安全文明施工標(biāo)牌設(shè)計(jì)制作宣傳工作;催促電信工程施工隊(duì)伍盡快進(jìn)場(chǎng)施工,以確保整個(gè)工程項(xiàng)目如期完工。
×月××日組織召開(kāi)了第一次工地會(huì)議,會(huì)議上對(duì)各管線工程的工期進(jìn)行安排,會(huì)同施工、設(shè)計(jì)單位對(duì)各管線橫穿過(guò)路的位置高程進(jìn)行協(xié)商,并決定有關(guān)過(guò)路橫穿問(wèn)題,根據(jù)實(shí)際情況現(xiàn)場(chǎng)解決。與各施工單位簽訂安全文明施工責(zé)任書(shū)。與電信工程負(fù)責(zé)人商定加快施工進(jìn)度的措施,為市政雨污水管線工程提前開(kāi)工創(chuàng)造條件。
在×××街工程實(shí)施過(guò)程中,我組織認(rèn)真各參建單位進(jìn)行施工圖審核及工程中間驗(yàn)收工作,協(xié)調(diào)各參建單位施工工序搭接等具體工作,為了使本工程能如期保質(zhì)保量的完成,我做了大量的內(nèi)外部相關(guān)單位的協(xié)調(diào)工作,具體工作內(nèi)容如下:
I. 外部協(xié)調(diào)工作:
①協(xié)調(diào)×××公司臨時(shí)供電站拆除工作,橡膠二廠圍墻拆除工作,園林中心樹(shù)木伐移工作,使得施工單位能如期進(jìn)場(chǎng),掃除障礙,給施工單位提供工作面。
②協(xié)調(diào)種植中心、區(qū)教委二單位南門(mén)封閉改由其它出口出行以避免影響工程施工。
③協(xié)調(diào)質(zhì)量監(jiān)督站報(bào)質(zhì)量監(jiān)督手續(xù)、交通大隊(duì)辦理斷路導(dǎo)行手續(xù)等。
④配合施工單位做好圍擋宣傳牌圖案,標(biāo)語(yǔ)設(shè)計(jì)并與城管大隊(duì)協(xié)調(diào)。
⑤協(xié)調(diào)怡馨家園北側(cè)停車場(chǎng)石材鋪裝方案、簽訂鋪裝協(xié)議及工程款支付等工作。
II. 內(nèi)部協(xié)調(diào):為了保證各管線工程施工工序合理,避免各工序施工互相干擾或重復(fù)施工情況發(fā)生,對(duì)各參建單位做了大量的內(nèi)部協(xié)調(diào)工作:
①協(xié)調(diào)電力、電信、歌華有線、燃?xì)?、自?lái)水、熱力等管線安裝單位進(jìn)場(chǎng)施工順序,并督促各施工單位按期進(jìn)場(chǎng)施工
②協(xié)調(diào)電力、電信舊有架設(shè)線纜入地工作,為道路施工按期開(kāi)工創(chuàng)造先決條件。
③參與監(jiān)理單位組織的單位工程驗(yàn)收工作,與質(zhì)量監(jiān)督站聯(lián)系,邀請(qǐng)相關(guān)人員參與雨污水工程驗(yàn)槽、污水管道閉水試驗(yàn),道路鋪油檢驗(yàn)等工作。
④協(xié)調(diào)各施工單位文明施工、成品保護(hù)工作,因施工現(xiàn)場(chǎng)地處市區(qū)中心,覆土遮蓋、撒水降塵工作顯得尤為重要,為此經(jīng)常督促×××市政公司,要求做好現(xiàn)場(chǎng)文明施工工作。
⑤因協(xié)調(diào)各管線施工單位縱向及橫穿管線位置及時(shí),未發(fā)生各管線施工時(shí)互相碰撞及挖掘過(guò)程破壞已建成管線情況。
⑥多次與市政設(shè)計(jì)所聯(lián)系施工圖紙更改事宜,參與制定人行步道鋪裝方案。
⑥協(xié)調(diào)路燈、廣告燈箱安裝,參與確定安裝平面位置,聯(lián)系垃圾桶廠家,并現(xiàn)場(chǎng)安排安裝等工作。
在×××街改建工程實(shí)施過(guò)程中,工程質(zhì)量、進(jìn)度、投資管理顯得尤為重要,為此我做了大量的工程管理工作:
Ø 質(zhì)量控制方面:
×、在進(jìn)行質(zhì)量控制的過(guò)程中,遵循堅(jiān)持質(zhì)量第一原則、堅(jiān)持以人為控制核心的原則、堅(jiān)持預(yù)防為主的原則、堅(jiān)持質(zhì)量標(biāo)準(zhǔn)的原則和科學(xué)、公正、守法的原則,根據(jù)相關(guān)的國(guó)家及政府有關(guān)部門(mén)頒布的有關(guān)質(zhì)量管理方面的法律、法規(guī)性文件,工程承包合同文件,施工規(guī)程、
本工程有關(guān)的檢驗(yàn)評(píng)定的標(biāo)準(zhǔn)和方法以及設(shè)計(jì)圖紙,確定質(zhì)量控制工作程序;采取事前、事中、事后控制相結(jié)合的質(zhì)量控制方法,對(duì)投入的物質(zhì)資源的質(zhì)量控制、施工過(guò)程的質(zhì)量控制和工程產(chǎn)品質(zhì)量的控制,以工序質(zhì)量控制為重點(diǎn)、以保證分項(xiàng)工程質(zhì)量和單位工程質(zhì)量,進(jìn)而確保工程項(xiàng)目質(zhì)量。
其中:事前控制:要求現(xiàn)場(chǎng)監(jiān)理工程師確定質(zhì)量標(biāo)準(zhǔn)、建立質(zhì)量監(jiān)理體系、施工現(xiàn)場(chǎng)的驗(yàn)收、審查審批各分包單位資質(zhì),督促承建單位和完善質(zhì)量保證體系、檢查工程所用的原材料和半成品質(zhì)量、施工機(jī)械質(zhì)量控制、審查審批施工單位的施工組織設(shè)計(jì)、施工方案和開(kāi)工報(bào)告,組織圖紙會(huì)審和技術(shù)交底的工作,審查施工單位管理人員,特別是項(xiàng)目經(jīng)理、質(zhì)量檢驗(yàn)員、施工員和特殊工種人員的資格,以確保工程投入環(huán)節(jié)的質(zhì)量。
事中控制:要求監(jiān)理工程師通過(guò)對(duì)施工過(guò)程質(zhì)量的工序控制、工序交接檢查、隱蔽工程檢查驗(yàn)收;中間產(chǎn)品質(zhì)量控制;分項(xiàng)工程質(zhì)量評(píng)定驗(yàn)收;設(shè)計(jì)變更及技術(shù)洽商的處理;監(jiān)理指令、支付的質(zhì)量認(rèn)證工作,以確保工程轉(zhuǎn)換環(huán)節(jié)的質(zhì)量。
事后控制:配合監(jiān)理工程師通過(guò)對(duì)單位工程的竣工初驗(yàn)收、項(xiàng)目工程的質(zhì)量評(píng)定、審核竣工資料確保工程項(xiàng)目的質(zhì)量。
×、在進(jìn)行事前控制和事中控制時(shí),始終通過(guò)對(duì)影響質(zhì)量的人、材料、機(jī)械、方法和環(huán)境這五大質(zhì)量影響因素的控制,確保工程投入物和產(chǎn)出品的質(zhì)量。
其中:對(duì)人的質(zhì)量控制,嚴(yán)格要求監(jiān)理工程師檢查各類人員的上崗證和制止違章操作;對(duì)材料的質(zhì)量控制主要是對(duì)通過(guò)書(shū)面檢驗(yàn)進(jìn)場(chǎng)材料的材料質(zhì)量證書(shū)、對(duì)進(jìn)場(chǎng)材料進(jìn)行外觀檢驗(yàn)、對(duì)材料抽樣的一般試驗(yàn)項(xiàng)目和部分的其它試驗(yàn)項(xiàng)目進(jìn)行理化檢驗(yàn),把好原材料和半成品的質(zhì)量關(guān);對(duì)施工方法的質(zhì)量控制主要配合監(jiān)理工程師對(duì)施工采用的技術(shù)方案、工藝流程、組織措施、檢測(cè)手段、施工組織設(shè)計(jì)進(jìn)行控制,重點(diǎn)是對(duì)施工組織設(shè)計(jì)的審批;對(duì)混凝土攪拌機(jī)、砂漿攪拌機(jī)、壓路機(jī)等施工機(jī)械的質(zhì)量控制主要是對(duì)設(shè)備選
型、主要性能參數(shù)和使用操作要求要滿足工程的需要進(jìn)行控制;對(duì)環(huán)境因素的質(zhì)量控制主要是對(duì)工程技術(shù)環(huán)境,工程管理環(huán)境和勞動(dòng)環(huán)境進(jìn)行控制,重點(diǎn)是對(duì)工程的管理環(huán)境中的質(zhì)量保證體系進(jìn)行控制。
×、質(zhì)量控制的主要方法
(×)嚴(yán)格工序質(zhì)量控制
要求監(jiān)理工程師根據(jù)工序的重要性設(shè)置質(zhì)量控制點(diǎn),對(duì)質(zhì)量進(jìn)行預(yù)控和重點(diǎn)控制,在施工過(guò)程中監(jiān)理工程師進(jìn)行質(zhì)量監(jiān)控,控制的重點(diǎn)包括:路床分層回填碾壓,路床軟基處理,路床與基層的密實(shí)度,瀝青路面彎沉;排水溝槽地基承載力,溝槽回填分層夯實(shí)及密實(shí)度;基坑地基承載力,路燈接地電阻等,現(xiàn)場(chǎng)監(jiān)理人員在施工現(xiàn)場(chǎng)實(shí)行旁站控制,隨時(shí)監(jiān)督施工單位在施工過(guò)程中可能出現(xiàn)的不合格工序,預(yù)測(cè)施工過(guò)程中可能影響工序質(zhì)量的因素,對(duì)各工序進(jìn)行質(zhì)量預(yù)控。同時(shí)重點(diǎn)控制工序活動(dòng)條件和工序活動(dòng)效果,嚴(yán)格按照工序報(bào)檢程序進(jìn)行驗(yàn)收,堅(jiān)持在施工單位報(bào)驗(yàn)的基礎(chǔ)上進(jìn)行工序質(zhì)量驗(yàn)收檢查,經(jīng)驗(yàn)收檢查合格的工序方可進(jìn)行下道工序的施工,對(duì)不合格品嚴(yán)格要求返工處理,保證了工程質(zhì)量目標(biāo)的實(shí)現(xiàn)。
(×)根據(jù)路床碾壓密實(shí)度試驗(yàn)結(jié)果,確定挖方地段預(yù)留碾壓高度,杜絕超挖回填現(xiàn)象。
(×)針對(duì)雨季施工的特點(diǎn),提出調(diào)整二灰基層的粉煤灰、石灰拌和比例,保證基層質(zhì)量。
(×)采用平行檢測(cè)的方法檢測(cè)路床和基層密實(shí)度,平行檢測(cè)混凝土路面的抗折強(qiáng)度,平行檢測(cè)路床、基層面層的高程。
(×)清淤地段采取旁站監(jiān)督,對(duì)清理到原土即要求施工單位停止清淤工作,避免不必要的浪費(fèi)。
Ø 進(jìn)度控制方面:
本項(xiàng)目道路工程合同工期為××天,工程于××××年×月××日開(kāi)工,××××年×月××日完工,總工期×× 天,滿足合同工期的要求。由于影響工程進(jìn)度的因素很多,有工程建設(shè)相關(guān)單位的影響,設(shè)計(jì)變更的影響,施工條件的影響,承包商自身管理水平的影響和各種風(fēng)險(xiǎn)因素的影響等相當(dāng)多的影響因素。因此,要求本工程項(xiàng)目的監(jiān)理機(jī)構(gòu)進(jìn)度控制的重點(diǎn)是對(duì)本工程的進(jìn)度進(jìn)行檢查、評(píng)估和對(duì)局部具備施工條件的項(xiàng)目施工進(jìn)度進(jìn)行監(jiān)督,消除承包商自身管理水平的影響。在消除承包單位自身管理水平的影響時(shí)主要采用技術(shù)措施和合同措施,通過(guò)及時(shí)處理工程所遇到的技術(shù)問(wèn)題盡可能地為施工單位創(chuàng)造施工條件;通過(guò)監(jiān)理指令督促施工單位增加資源的投入,改進(jìn)施工工藝,加快施工進(jìn)度。
配合監(jiān)理單位進(jìn)行進(jìn)度控制的主要工作有:
×、組織專業(yè)監(jiān)理工程師審核施工單位提交的施工總進(jìn)度計(jì)劃,使總進(jìn)度計(jì)劃與合同總工期有一定的富余時(shí)間,使各分項(xiàng)工程的施工時(shí)間安排相互之間協(xié)調(diào)一致,同時(shí)符合工期總目標(biāo)的要求。
×、協(xié)助督促承建商實(shí)施進(jìn)度計(jì)劃,隨時(shí)檢查施工進(jìn)度計(jì)劃的關(guān)鍵控制點(diǎn),動(dòng)態(tài)了解進(jìn)度計(jì)劃實(shí)施情況。
×、檢查和審核施工單位提交的月度及周進(jìn)度計(jì)劃,同時(shí)按照周進(jìn)度計(jì)劃嚴(yán)格進(jìn)行進(jìn)度核查,隨時(shí)進(jìn)行進(jìn)度調(diào)整。
×、根據(jù)工程特點(diǎn)設(shè)置節(jié)點(diǎn)重點(diǎn)進(jìn)行控制,為了保證工程總工期目標(biāo)的實(shí)現(xiàn),把總進(jìn)度分為兩個(gè)階段,×月××日前要求施工必須完成排水工程施工及道路路床下基層的施工,按照此目標(biāo)要求進(jìn)行進(jìn)度的控制。
×、組織召開(kāi)現(xiàn)場(chǎng)進(jìn)度專題會(huì)、工地例會(huì)。對(duì)現(xiàn)場(chǎng)存在的影響進(jìn)度的各種問(wèn)題及時(shí)召開(kāi)進(jìn)度專題會(huì)、及時(shí)分析、通報(bào)工程施工進(jìn)度情況,提出改進(jìn)措施,協(xié)調(diào)承包商不能解決的工程
×、協(xié)助施工單位完善和提高進(jìn)度計(jì)劃管理水平。定期及隨時(shí)進(jìn)行進(jìn)度完成情況檢查對(duì)比,同時(shí)把我們的看法和意見(jiàn)經(jīng)常與施工負(fù)責(zé)人進(jìn)行交換,共同解決存在的進(jìn)度問(wèn)題。
Ø 投資控制方面:
×、本工程計(jì)劃投資×××萬(wàn)元。
×、工程實(shí)際造價(jià):
道路、人行步道鋪裝、排水工程、熱力、燃?xì)?、給水、電信、有線電視、電力、路燈、綠化、交通等工程約一千余萬(wàn)元。
超出部分是由于工程設(shè)計(jì)變更造成的,例如:原人行步道鋪裝設(shè)計(jì)為普通水泥方磚,現(xiàn)改為×㎝厚花崗巖機(jī)刨石等。
×、投資控制主要方法:
(×)嚴(yán)把設(shè)計(jì)變更關(guān):對(duì)工程變更、設(shè)計(jì)修改等事項(xiàng),首先進(jìn)行技術(shù)經(jīng)濟(jì)合理性預(yù)分析,確實(shí)必要時(shí)經(jīng)施工、設(shè)計(jì)、監(jiān)理三方同意并報(bào)送業(yè)主審批后方可實(shí)施,當(dāng)發(fā)現(xiàn)與原投資控制計(jì)劃有較大差異時(shí),及時(shí)向業(yè)主報(bào)告,并與業(yè)主及設(shè)計(jì)人員協(xié)商處理。
(×)嚴(yán)格控制費(fèi)用的簽證:凡設(shè)及經(jīng)濟(jì)費(fèi)用支出的簽證認(rèn)真進(jìn)行審核,并要求附上原始依據(jù),同時(shí)會(huì)同業(yè)主核簽后才能生效。
(×)作好工程計(jì)量工作:
①按照工程計(jì)量程序進(jìn)行工程計(jì)量。
②要求監(jiān)理人員熟悉每一份施工合同條款內(nèi)容,掌握工程計(jì)量原則和條件,避免工程量的交叉重復(fù)計(jì)量。
③認(rèn)真復(fù)核、審核各種計(jì)量原始資料及表?yè)?jù),要求監(jiān)理工程師要與承包商共同進(jìn)行現(xiàn)場(chǎng)測(cè)完計(jì)量,確保計(jì)量的準(zhǔn)確性。
④做好每月的進(jìn)度完成工程量審核工作。
⑤嚴(yán)把沒(méi)有進(jìn)行工序驗(yàn)收合格的項(xiàng)目不予計(jì)量的原則,由于施工單位自身原因?qū)е碌墓こ碳夹g(shù)處理措施工程量不予計(jì)量。
Ø 安全文明施工方面:
本工程項(xiàng)目管理部堅(jiān)決貫徹“安全第一、預(yù)防為主”的安全生產(chǎn)
方針,加強(qiáng)現(xiàn)場(chǎng)安全文明施工的管理,監(jiān)督參與本工程建設(shè)的各方認(rèn)真貫徹國(guó)家關(guān)于建設(shè)施工項(xiàng)目的安全管理規(guī)定及項(xiàng)目法人對(duì)安全施
工的有關(guān)規(guī)定,采取有效措施,杜絕重大人身傷亡事故、重大設(shè)備安全事故,營(yíng)造一個(gè)安全文明的施工環(huán)境,實(shí)現(xiàn)創(chuàng)建安全文明施工工地的目標(biāo)。
×、安全工作重點(diǎn):
①建立、健全安全生產(chǎn)制度,結(jié)合生產(chǎn)現(xiàn)場(chǎng)特點(diǎn),開(kāi)展各項(xiàng)檢查;督促個(gè)施工單位對(duì)生產(chǎn)現(xiàn)場(chǎng)安全文明施工增加投入,使安全防護(hù)欄桿布置符合安規(guī)要求,安全標(biāo)示牌醒目,各種物質(zhì)、材料堆放有序,標(biāo)識(shí)清楚,文明施工場(chǎng)地面貌煥然一新,文明施工井然有序;
②充分發(fā)揮《工地安全例會(huì)》的作用。主持召開(kāi)工地安全生產(chǎn)會(huì)議,在會(huì)上各施工單位認(rèn)真回顧本單位安全工作,總結(jié)經(jīng)驗(yàn),找出不足,大家暢所欲言、取長(zhǎng)補(bǔ)短,交流、學(xué)習(xí)、溝通、協(xié)調(diào),達(dá)成共識(shí),統(tǒng)一意見(jiàn),對(duì)今后安全工作計(jì)劃抓住重點(diǎn),以點(diǎn)帶面,統(tǒng)籌兼顧。做到有布置、有檢查、有總結(jié)。
×、開(kāi)展安全生產(chǎn)及文明施工安全檢查。本工程自開(kāi)工以來(lái),配合項(xiàng)目監(jiān)理部積極主動(dòng)地進(jìn)行施工現(xiàn)場(chǎng)安全檢查活動(dòng),對(duì)各單位工程安全生產(chǎn)及文明施工大檢查× 次,組織施工單位進(jìn)行施工用電、挖掘機(jī)械、特殊工種證件、起重工器具、消防設(shè)施、人員行為規(guī)范、空洞蓋板及臨邊防護(hù)、班組安全活動(dòng)等各類安全專項(xiàng)檢查××次,發(fā)現(xiàn)和糾正了很多隱患。由于堅(jiān)持
了事前控制,把事故消滅在萌芽狀態(tài),有效地確保了本工程開(kāi)工以來(lái)的長(zhǎng)周期安全文明施工;
×、嚴(yán)格審大項(xiàng)目、重要工序、危險(xiǎn)作業(yè)和特殊作業(yè)的安全施工措施。嚴(yán)格審查施工單位的施工組織設(shè)計(jì)及重大技術(shù)及現(xiàn)場(chǎng)總平面布置所涉及的安全文明施工、危險(xiǎn)源和環(huán)境保護(hù)措施。參加重大項(xiàng)目、重要工程、危險(xiǎn)項(xiàng)目、特殊作業(yè)的會(huì)審,提出安全管理修改意見(jiàn)或建議,使施工方案更合理、更科學(xué)、更便于可操作性。共審查施工方案及安全措施×份;
×、加強(qiáng)安全文明施工檢查,要求施工現(xiàn)場(chǎng)定置化管理,必須做到施
工安全通道暢通,物料擺放整齊,小型工器具安全操作規(guī)程、材料標(biāo)示牌醒目清晰,臨邊防護(hù)、孔洞蓋板齊全、色澤鮮明,生產(chǎn)場(chǎng)地基本達(dá)到“工完料盡場(chǎng)地清”;
×、監(jiān)督檢查施工單位現(xiàn)場(chǎng)安全文明施工狀況,發(fā)現(xiàn)問(wèn)題及時(shí)督促整
改。始終堅(jiān)持安全監(jiān)理為現(xiàn)場(chǎng)服務(wù),監(jiān)督、幫助施工單位安全設(shè)施到位,規(guī)范施工人員行為,安全先行,搞好安全文明施工,安全與施工進(jìn)度齊頭并進(jìn),實(shí)現(xiàn)工程安全生產(chǎn)。在安全管理中,重點(diǎn)抓住安全帽、的使用。
×、加強(qiáng)現(xiàn)場(chǎng)巡視,發(fā)現(xiàn)違章作業(yè),及時(shí)制止,發(fā)現(xiàn)安全隱患及時(shí)要求監(jiān)理人員下達(dá)監(jiān)理工程師通知單或工作聯(lián)系單限期整改。對(duì)于嚴(yán)重違規(guī),嚴(yán)重威脅人身安全的隱患,開(kāi)具《違章施工罰款通知書(shū)》進(jìn)行處罰。
×、加強(qiáng)現(xiàn)場(chǎng)文明施工管理,督促施工單位做好施工現(xiàn)場(chǎng)覆土苫蓋及灑水降塵工作,基本做到施工現(xiàn)場(chǎng)無(wú)覆土情況,無(wú)揚(yáng)塵情況發(fā)生;現(xiàn)場(chǎng)渣土均能及時(shí)外運(yùn),施工現(xiàn)場(chǎng)物料堆放整齊,道路整潔,施工現(xiàn)場(chǎng)秩序井然。
工程竣工驗(yàn)收移交使用單位是考核代建工作績(jī)效的最后一關(guān),因此,做好工程竣工驗(yàn)收工作是代建工作的關(guān)鍵。為了做好此項(xiàng)工作,我做了大量準(zhǔn)備工作:
×、安排竣工驗(yàn)收日期,通知各相關(guān)參驗(yàn)單位,明確驗(yàn)收標(biāo)準(zhǔn),審核施工單位工程技術(shù)資料,編繪竣工圖紙;
×、編制西街工程竣工總結(jié)報(bào)告等。
(二)×××垃圾中轉(zhuǎn)站、垃圾房及廢品回收間工程
×××區(qū)人民政府為了迎接奧運(yùn)會(huì),改善×××區(qū)農(nóng)村人民的生活環(huán)境,決定在×××區(qū)××個(gè)鎮(zhèn),近×××個(gè)村建設(shè)垃圾房×××余座,垃圾中轉(zhuǎn)站××座,該項(xiàng)工程投資××××余萬(wàn)元。該項(xiàng)工程在×月×日開(kāi)始籌劃,并于×月××日進(jìn)行各鎮(zhèn)垃圾中轉(zhuǎn)站選址開(kāi)始,相關(guān)施工單位進(jìn)行開(kāi)工建設(shè),工期初步設(shè)定本年年底。
為做好本工程的代建工作,我認(rèn)真研究施工圖紙,熟悉工程概況。由于本工程建于各鄉(xiāng)鎮(zhèn),需要協(xié)調(diào)各鄉(xiāng)鎮(zhèn)政府相關(guān)人員、各施工單位、監(jiān)理公司及業(yè)主(市政管委)等,因此,協(xié)調(diào)工作量巨大。
在做好大量的協(xié)調(diào)工作情況下,我編制了《垃圾轉(zhuǎn)運(yùn)站及垃圾房工程項(xiàng)目建設(shè)管理措施》,并報(bào)市政管委及×××咨詢公司審批通過(guò)執(zhí)行。
在進(jìn)行項(xiàng)目建設(shè)管理工作時(shí),我做了大量的相關(guān)工作,特別是垃圾中轉(zhuǎn)站工程,因沒(méi)有詳細(xì)施工圖紙及總圖,現(xiàn)場(chǎng)圍墻、路面、外網(wǎng)、門(mén)衛(wèi)房等具體工程均為我及施工項(xiàng)目經(jīng)理現(xiàn)場(chǎng)確定,并得到業(yè)主的一致贊許,為簽訂代建合同打下良好的基礎(chǔ)。積極巡視檢查各村垃圾房建設(shè)進(jìn)度及質(zhì)量情況,每周以工程簡(jiǎn)報(bào)的形式按時(shí)向市政管委市容科呂科長(zhǎng)匯報(bào)工程實(shí)況,協(xié)助監(jiān)理公司做好工程量計(jì)量工作,對(duì)已完成垃圾房建設(shè)的各鎮(zhèn)組織竣工驗(yàn)收,目前已完成×個(gè)鎮(zhèn)的垃圾房工程驗(yàn)收工作,預(yù)計(jì)在××月中旬完成剩余××鎮(zhèn)的垃圾房驗(yàn)收工作。
二、監(jiān)理工作:
因監(jiān)理公司專業(yè)人員緊缺,總公司為使監(jiān)理委托方滿意,優(yōu)化配置資源,派我兼任×××區(qū)垃圾填埋場(chǎng)工程監(jiān)理項(xiàng)目部總監(jiān)工作。
順義區(qū)垃圾填埋場(chǎng)工程建于×××區(qū)×××鎮(zhèn),占地××公頃,日處理垃圾×××噸,使用年限××年,投資×億元人民幣。
在擔(dān)任本工程總監(jiān)過(guò)程中,我詳細(xì)了解工程情況,安排監(jiān)理工程師編制監(jiān)理細(xì)則,組織監(jiān)理項(xiàng)目部?jī)?nèi)部工作會(huì)議,檢查專業(yè)監(jiān)理工程師監(jiān)理工作情況,及時(shí)發(fā)現(xiàn)并解決監(jiān)理工作中的一些實(shí)際問(wèn)題;每周按時(shí)主持工地建立例會(huì),協(xié)調(diào)業(yè)主及施工各方關(guān)系,為工程建設(shè)順利實(shí)施創(chuàng)造有利條件;認(rèn)真檢查監(jiān)理內(nèi)業(yè)資料,努力做到工程資料與施工同步,為工程竣工順利移交做好準(zhǔn)備工作;認(rèn)真審核施工單位施工組織設(shè)計(jì),對(duì)不合理及不符合施工規(guī)范情況及時(shí)提出,責(zé)成施工單位修改后報(bào)審;積極進(jìn)行施工現(xiàn)場(chǎng)巡視檢查工作,保證每周×日在施工現(xiàn)場(chǎng)巡視檢查施工情況,做到對(duì)工程進(jìn)度、質(zhì)量等情況了如指掌,為進(jìn)行三控兩管一協(xié)調(diào)工作打下良好基礎(chǔ)。
在任總監(jiān)工作期間,能較好的完成本崗位工作任務(wù),履行崗位職責(zé),使業(yè)主滿意。
三、其他工作
在努力完成公司下達(dá)的各項(xiàng)任務(wù)的同時(shí),我積極參與為公司創(chuàng)收活動(dòng),完成×××區(qū)×××座標(biāo)志物鋼結(jié)構(gòu)設(shè)計(jì)工作,為公司創(chuàng)收×萬(wàn)余元。
參加公司辦公室組織的繼續(xù)教育活動(dòng),努力提高專業(yè)素質(zhì),為今后更好的做好代建工作積蓄能量。
四、經(jīng)驗(yàn)教訓(xùn)
代建制作為一種新型的管理模式,于××××年在全國(guó)推行,首先因其體現(xiàn)了“投資、建設(shè)、管理、使用”職能的彼此分離,可以有效避免擅自擴(kuò)大建設(shè)規(guī)模,提高建設(shè)標(biāo)準(zhǔn),增加建設(shè)內(nèi)容等行為,以及“概算超估算、預(yù)算超概算、結(jié)算超預(yù)算”的三超問(wèn)題,達(dá)到提高投資效益和管理水平的目的。
其次,代建單位專業(yè)性強(qiáng),工作效率高。代建法人由于專業(yè)從事工程建設(shè),有一支專業(yè)化隊(duì)伍,他們熟悉業(yè)務(wù),熟悉市場(chǎng),成本節(jié)約意識(shí)強(qiáng),這種內(nèi)行管內(nèi)行,既提高工作效率,又節(jié)約成本,它使工程監(jiān)管更“?!薄?/p>
再次,它使權(quán)力分置更“明”。說(shuō)到底,全部資金由財(cái)政部門(mén)及國(guó)庫(kù)統(tǒng)一管理?yè)芨?,業(yè)主方既不管錢(qián)又不管建,代建單位也是看不見(jiàn)一分錢(qián),所建項(xiàng)目又不是自己用,真正做到“量體裁衣”,從而防止工程越建越大,克服了投資、建設(shè)、管理、使用“多位一體”的弊端,四權(quán)分立且相互制衡,對(duì)腐敗的免疫力自然倍增。
從上述幾個(gè)角度來(lái)說(shuō),“代建制”的建設(shè)管理還是比較有生命力的。實(shí)踐證明,實(shí)行“代建制”,將政府投資項(xiàng)目進(jìn)行適當(dāng)?shù)募?、統(tǒng)一管理,有利于提高政府投資項(xiàng)目管理的專業(yè)化水平,對(duì)于控制投資和提高投資效益可以發(fā)揮積極作用。為此,《國(guó)務(wù)院關(guān)于投資體制改革的決定》提出:對(duì)非經(jīng)營(yíng)性政府投資項(xiàng)目加快推行“代建制”。
×××工程管理有限公司在這樣的大環(huán)境進(jìn)行代建工作,足以看出決策者的英明所在。但是,由于本公司初涉代建工作,還存在代建工作經(jīng)驗(yàn)少,在工程管理過(guò)程中及內(nèi)外部協(xié)調(diào)等方面不到位等諸多問(wèn)題,公司員工專業(yè)化程度不
總結(jié)是對(duì)前段社會(huì)實(shí)踐活動(dòng)進(jìn)行全面回顧、檢查的文種,這決定了總結(jié)有很強(qiáng)的客觀性特征。下面就讓小編帶你去看看監(jiān)理年終工作個(gè)人總結(jié)報(bào)告范文5篇,希望能幫助到大家!
監(jiān)理年終工作總結(jié)報(bào)告1201__年7月,我應(yīng)聘到云南發(fā)展建設(shè)監(jiān)理公司工作,被安排在呈貢新潭2、3號(hào)工地,擔(dān)任現(xiàn)場(chǎng)監(jiān)理與資料員工作,至今工作已有一年了,一年來(lái)在公司鄰導(dǎo)和同事們的幫助下,圓滿完成相應(yīng)的工作任務(wù),并得到各部門(mén)的承認(rèn)與好評(píng),在從事監(jiān)理工作期間,本人任勞任怨,以良好的職業(yè)道德和較強(qiáng)的責(zé)任心認(rèn)真細(xì)致的進(jìn)行工作,現(xiàn)對(duì)一年來(lái)的工作情況和體會(huì)做如下總結(jié)。
初到工地,人地生疏,監(jiān)理經(jīng)驗(yàn)的缺乏,在工作中遇到了一些困難,我并未知難而退,積極向各位前輩虛心請(qǐng)教,并抓緊時(shí)間熟悉施工圖和各種相關(guān)資料,在最短的時(shí)間內(nèi)了解工地狀況等,很快的進(jìn)入了監(jiān)理的角色。
在監(jiān)理實(shí)際工作中,在各位前輩的指導(dǎo)下,認(rèn)真覆行監(jiān)理員的工作職責(zé),做好施工現(xiàn)場(chǎng)的監(jiān)理旁站記錄和施工現(xiàn)場(chǎng)的有關(guān)記錄,并及時(shí)的匯總到監(jiān)理日志中,當(dāng)然,在監(jiān)理過(guò)程中也曾多次遇到自已不能解決的問(wèn)題。如:施工單位人員在施工時(shí)未嚴(yán)格按設(shè)計(jì)及規(guī)范的要求進(jìn)行施工,當(dāng)我發(fā)現(xiàn)后進(jìn)行阻止,但施工人員不聽(tīng)勸阻,依然我行我素,此時(shí),我知道憑靠我個(gè)人的力量加之有限的水平是不能完全阻止其不正確的施工,隨即通知有經(jīng)驗(yàn)的同事到場(chǎng)協(xié)助解決,這樣即保證了施工質(zhì)量,也樹(shù)立了監(jiān)理在工程質(zhì)量控制中的作用。
此外,本人在一年來(lái)的監(jiān)理工作中,還擔(dān)任著監(jiān)理資料員工作。初到工地,對(duì)資料員這一工作的概念還不是太清楚,以為只是收、發(fā)資料或完成本部門(mén)文字處理工作等。但隨著工作的進(jìn)展、自已不斷的學(xué)習(xí)和在各位同事的耐心指導(dǎo)下,我明白了:市政道路工程以致其它工程,除了能通過(guò)工程本身反映外,資料也是很重要的一個(gè)環(huán)節(jié),通過(guò)資料能反映出工程當(dāng)中材料的使用,各工序之間是否符合相關(guān)要求,是否按施工圖施工等。作為監(jiān)理資料員,嚴(yán)格把好這道關(guān),做好資料的收集、整理工作,在工程中有著舉足輕重的作用,到工地后,在領(lǐng)導(dǎo)明確了自已的工作職責(zé)和分工后,就馬上開(kāi)始查閱各相關(guān)資料、文件和技術(shù)規(guī)范,很快的進(jìn)入了工作狀態(tài):
1、接收到上級(jí)有關(guān)部門(mén)下發(fā)的各種資料、文件后,及時(shí)的進(jìn)行登記、存檔,并及時(shí)的分發(fā)給施工單位項(xiàng)目部。
2、及時(shí)的完成對(duì)工程資料的傳遞工作,當(dāng)收到施工單位上報(bào)的各種資料后,及時(shí)的對(duì)其進(jìn)行分類和進(jìn)行初步的審核,對(duì)于合格的資料及時(shí)的分發(fā)給項(xiàng)目總監(jiān)和各專業(yè)監(jiān)理工程師進(jìn)行復(fù)核,對(duì)于不合格的資料,及時(shí)的返回給施工單位,要求其及時(shí)的進(jìn)行復(fù)核或整改后重新報(bào)到工部進(jìn)行審核。
3、及時(shí)的完成本部門(mén)的文字處理工作,配合各專業(yè)監(jiān)理工程師做好工作聯(lián)系單、監(jiān)理工程師通知和監(jiān)理月報(bào)等工作。
4、完成工程資料的收集、整理、匯總、編制和存檔工作。
我作為監(jiān)理員和資料員,從事監(jiān)理工作時(shí)間短,工作中還存在許多的不足之處,今后我會(huì)更加嚴(yán)格的要求自己,努力的鉆研業(yè)務(wù),不斷更新和補(bǔ)充新的知識(shí),提高業(yè)務(wù)水平和工作能力,總結(jié)經(jīng)驗(yàn),更好的完成監(jiān)理工作。
監(jiān)理年終工作總結(jié)報(bào)告2光陰似箭日月如梭,一年轉(zhuǎn)眼就過(guò)去了。在________工程這一年的時(shí)間里,較好的完成了本職工作及上級(jí)領(lǐng)導(dǎo)安排的各項(xiàng)工作,就201__年本人做工作總結(jié)如下:
在總監(jiān)理工程師的帶領(lǐng)下對(duì)巖嶺隧道工程建設(shè)的過(guò)程中不定期巡視檢查,科學(xué)監(jiān)理,認(rèn)真履行自己的崗位職責(zé)。在專業(yè)監(jiān)理工程師的指導(dǎo)下開(kāi)展現(xiàn)場(chǎng)監(jiān)理工作;定期對(duì)承包單位投入工程項(xiàng)目的人力、材料、主要設(shè)備及其使用、運(yùn)行狀況進(jìn)行檢查,并做好檢查記錄;按設(shè)計(jì)圖及有關(guān)標(biāo)準(zhǔn),對(duì)承包單位的施工工藝過(guò)程和施工工序進(jìn)行檢查和記錄,對(duì)加工制作和工序施工質(zhì)量檢查結(jié)果進(jìn)行記錄;及時(shí)對(duì)工程建設(shè)過(guò)程中的關(guān)鍵部位和關(guān)鍵工序的施工質(zhì)量實(shí)施的全過(guò)程現(xiàn)場(chǎng)跟班監(jiān)督,發(fā)現(xiàn)問(wèn)題并時(shí)指出并向?qū)I(yè)監(jiān)理工程師報(bào)告;在日常的監(jiān)理工作中如實(shí)做好監(jiān)理日記和有關(guān)的監(jiān)理記錄。
在監(jiān)理工作過(guò)程中依據(jù)建設(shè)工程委托監(jiān)理合同、建設(shè)工程施工合同、設(shè)計(jì)圖紙、國(guó)家規(guī)范、及相關(guān)法律法規(guī)對(duì)溪縣巖嶺隧道工程實(shí)施監(jiān)理。在巖嶺隧道工程工作過(guò)程中,也發(fā)現(xiàn)不少施工及管理方在的問(wèn)題如:沒(méi)有及時(shí)對(duì)隧道進(jìn)行監(jiān)控量測(cè)及觀測(cè),施工安全步距超標(biāo),仰拱施工不及時(shí),未及早封閉成環(huán),噴射混凝土厚度不符合設(shè)計(jì)要求,工字鋼安裝不符合規(guī)則要求等等相關(guān)問(wèn)題,但是在總監(jiān)理工程師的領(lǐng)導(dǎo)下,這些問(wèn)題都得到了落實(shí)及整改。
在__________今后的監(jiān)理工作過(guò)程中,我將對(duì)管轄內(nèi)隧道施工的安全及工序加強(qiáng)管理,確保隧道工程安全順利按期完成,必須嚴(yán)格控制隧道二次襯砌、仰拱距掌子面距離,臺(tái)階法施工開(kāi)挖長(zhǎng)度,仰拱施工開(kāi)挖長(zhǎng)度,初期支護(hù)設(shè)計(jì)要求。必須認(rèn)真履行監(jiān)理職責(zé),加大現(xiàn)場(chǎng)旁站及監(jiān)督力度,及時(shí)了解掌握施工現(xiàn)場(chǎng)的真實(shí)情況,使隧道施工的安全步距有序可控,督促施工單位嚴(yán)格按設(shè)計(jì)要求及相關(guān)規(guī)則進(jìn)行科學(xué)施工,保證隧道施工的安全步距,確保隧道的施工安全。在總監(jiān)理工程師的帶領(lǐng)下將嚴(yán)格監(jiān)理,及監(jiān)理程序,對(duì)承包商提供的原材料試驗(yàn)、標(biāo)準(zhǔn)試驗(yàn)要獨(dú)立抽檢,只有合格的材料及科學(xué)的數(shù)據(jù)才能用于工程指導(dǎo)施工;嚴(yán)格工序檢測(cè)驗(yàn)收,上一道工序不合格,嚴(yán)禁下一道工序施工,對(duì)關(guān)鍵工序、隱蔽工程要旁站監(jiān)理,嚴(yán)格按技術(shù)標(biāo)準(zhǔn)、施工規(guī)范、合同要求施工努力把巖嶺隧道工程現(xiàn)場(chǎng)監(jiān)理工作做好及完成201__年的本職工作。
新的一年就將到來(lái),為更好的完成好本職工作,明確質(zhì)量控制重點(diǎn),強(qiáng)化過(guò)程控制,提高工程建設(shè)質(zhì)量,為保障工程施工安全及高質(zhì)量標(biāo)準(zhǔn)的目標(biāo)而努力,為公司更加輝煌的明天而不懈的努力。
監(jiān)理年終工作總結(jié)報(bào)告3隨著時(shí)間的推移,________年即將過(guò)去,在這年終歲末之時(shí),回首過(guò)去一年工作,平下心來(lái),總結(jié)自己工作成績(jī)和收獲,從而找出不足,以利于今后工作??偨Y(jié)過(guò)去一年工作,誠(chéng)懇希望大家對(duì)總結(jié)不當(dāng)之處給予提示,對(duì)我來(lái)說(shuō)是莫大的幫助。
過(guò)去的一年,在公司和項(xiàng)目部的領(lǐng)導(dǎo)大力支持和關(guān)心下,我認(rèn)真堅(jiān)持“預(yù)控、規(guī)范、科學(xué)、優(yōu)質(zhì)”的工作指導(dǎo)思想,牢固樹(shù)立“確保每一個(gè)業(yè)主滿意”的服務(wù)宗旨,盡心盡職,努力工作。下面談?wù)勎以赺_____年的工作與表現(xiàn):
一、信息管理
① 不同單位的來(lái)往文函分別統(tǒng)一編號(hào)、登記,然后填寫(xiě)收文處理簽,呈總監(jiān)閱批,按照指示意見(jiàn)交于文件閱處人。并及時(shí)催促按期處理完畢。
②為方便編寫(xiě)會(huì)議紀(jì)要,每次會(huì)議都按時(shí)出席,并做好記錄。因?yàn)榧o(jì)要是會(huì)議內(nèi)容的精辟闡述和高度概括,高于會(huì)議紀(jì)錄。這中間涉及至口頭用語(yǔ)向?qū)I(yè)術(shù)語(yǔ)的轉(zhuǎn)化問(wèn)題,凡是不懂的我都會(huì)積極向同事們請(qǐng)教,爭(zhēng)取將工作做得趨于完善。
③ 監(jiān)理月報(bào)的大部分?jǐn)?shù)據(jù)是來(lái)源于施工月報(bào)。在做月報(bào)之前,需要認(rèn)真的研究施工月報(bào),其中的細(xì)節(jié)必須得吃透,只有這樣才能判斷出某些情況是否屬實(shí)。
一、對(duì)工程施工建設(shè)的質(zhì)量控制
①在事前控制中所做的工作
在收到工程施工圖紙后,我就先進(jìn)行熟悉圖紙,了解設(shè)計(jì)意圖,明了施工過(guò)程的主要工藝流程、工程特點(diǎn),對(duì)施工圖紙上所存在的異議之處采用書(shū)面形式進(jìn)行記錄,提交給總監(jiān)理工程師在圖紙會(huì)審會(huì)議上提出,由設(shè)計(jì)進(jìn)行明確。
②在事中控制中所做的工作
針對(duì)所有進(jìn)場(chǎng)材料、半成品等,我除做好對(duì)照標(biāo)準(zhǔn)和設(shè)計(jì)要求核查由施工方提交的相關(guān)報(bào)驗(yàn)資料進(jìn)行核查外,還做好對(duì)材料進(jìn)場(chǎng)時(shí)進(jìn)行必需的其外觀質(zhì)量目測(cè)檢查,對(duì)有在外觀質(zhì)量上不符合要求杜絕用入工程中。
針對(duì)在工程關(guān)鍵部位的施工時(shí),做到提前到達(dá)旁站位置,檢查施工準(zhǔn)備工作,并旁站施工全過(guò)程,及時(shí)、完全真實(shí)地作好書(shū)面的旁站記錄;對(duì)一般施工的各道工序作業(yè),做好日常的巡視、巡檢、檢查工作。
對(duì)各施工過(guò)程中的巡視、巡檢、檢查所發(fā)現(xiàn)的問(wèn)題,及時(shí)采用口頭形式或書(shū)面形式通知施工單位工程項(xiàng)目管理部,做到發(fā)現(xiàn)問(wèn)題及時(shí)向總監(jiān)匯報(bào),并督促施工單位落實(shí)整改及進(jìn)行再次的復(fù)核檢查。盡自己最大努力做好工程施工建設(shè)監(jiān)理控制質(zhì)量的事前與事中的控制,盡職盡責(zé)地做好我應(yīng)該做的工作。
二、對(duì)安全文明施工控制方面的工作
通過(guò)對(duì)學(xué)習(xí)《安全生產(chǎn)法》及在工作過(guò)程中我得到一些體會(huì)樹(shù)立以安全預(yù)防為主的觀點(diǎn),就是工作做在前,因?yàn)槭鹿适强梢灶A(yù)防的,但是是不可預(yù)測(cè)的,建立相應(yīng)的檢查制度,發(fā)現(xiàn)隱患及時(shí)整改,監(jiān)理在施工現(xiàn)場(chǎng)對(duì)于安全有不可推卸的職責(zé),我除了做好日常的安全檢查工作及監(jiān)督和管理(相關(guān)資料記錄存檔整理)工作外,堅(jiān)持做好對(duì)施工單位的日常安全教育、技術(shù)工種的安全技術(shù)教育和崗位安全技術(shù)交底工作的檢查(包括安全臺(tái)帳及書(shū)面資料),每月進(jìn)行定期或不定期的形式進(jìn)行現(xiàn)場(chǎng)施工安全狀況全方位檢查,并做好安全檢查記錄臺(tái)帳存檔。
針對(duì)公司領(lǐng)導(dǎo)對(duì)工程安全控制所提出的要求,加深了監(jiān)督管理的深度,對(duì)存在的問(wèn)題及時(shí)下達(dá)整改通知,要求施工單位進(jìn)行整改,并督促整改,及時(shí)進(jìn)行再檢查,對(duì)于工程施工建設(shè)過(guò)程監(jiān)理中的質(zhì)量控制尤其是對(duì)安全文明生產(chǎn)控制的具體工作做法,我的體會(huì)是應(yīng)該也必須做到“四勤”制:
眼勤(要能提前發(fā)現(xiàn)問(wèn)題);
腳勤(多在現(xiàn)場(chǎng)轉(zhuǎn)、巡、查);
嘴勤(對(duì)發(fā)現(xiàn)問(wèn)題要多講);
手勤(及時(shí)做好相關(guān)記錄下過(guò)書(shū)面通知);
加強(qiáng)巡視工作,加強(qiáng)過(guò)程中的控制,才能更好地、認(rèn)真地做好本職工作。
______年的工作既繁忙又充實(shí),為履行監(jiān)理職責(zé),積極工作,任勞任怨,服從領(lǐng)導(dǎo)安排,從不推脫,全心為工程著想。
監(jiān)理年終工作總結(jié)報(bào)告4一、工程概況
六盤(pán)水市職業(yè)技術(shù)學(xué)院1#綜合樓工程為六層框架結(jié)構(gòu),總建筑面積為27500平方米;采用鋼筋混凝土人工挖孔樁基礎(chǔ),主體為現(xiàn)澆鋼筋混凝土框架結(jié)構(gòu);現(xiàn)澆鋼筋砼無(wú)梁樓蓋技術(shù),外墻二至六層采用真石漆.一層采用天蘭色方磚,內(nèi)墻為瓷粉墻面;地面面層為水磨石地面,學(xué)術(shù)報(bào)告廳及門(mén)廳采用花崗巖板材;窗為白塑鋼窗,配天藍(lán)色玻璃;屋面采用剛性及柔性防水層,保溫隔熱層為水泥膨脹珍珠巖,
二、監(jiān)理組織機(jī)構(gòu)、監(jiān)理人員
自雙方簽訂建設(shè)監(jiān)理委托合同后,確定項(xiàng)目質(zhì)量、進(jìn)度、投資監(jiān)理總目標(biāo)。成立項(xiàng)目建立組織,即六盤(pán)水市職業(yè)技術(shù)學(xué)院1#綜合樓工程項(xiàng)目監(jiān)理部。確定以談若名為項(xiàng)目總監(jiān)理工程師,以李正橋?yàn)楣究傌?fù)責(zé)人,以張榮.祁玉奎為現(xiàn)場(chǎng)專業(yè)監(jiān)理工程師。按照監(jiān)理合同及《建設(shè)工程監(jiān)理規(guī)范》分解監(jiān)理目標(biāo),明確總監(jiān)理工程師及專業(yè)監(jiān)理工程師職責(zé)。使監(jiān)理工作制度化、規(guī)范化、標(biāo)準(zhǔn)化。
三、監(jiān)理合同履行情況
我公司自監(jiān)理委托合同簽訂后,根據(jù)該工程情況,給予高度重視,及時(shí)成立了項(xiàng)目建設(shè)監(jiān)理組織六盤(pán)水市職業(yè)技術(shù)學(xué)院1#綜合樓工程項(xiàng)目監(jiān)理部。編制了《監(jiān)理規(guī)劃》、《監(jiān)理實(shí)施細(xì)則》、《工程建設(shè)監(jiān)理工作制度》、《施工管理監(jiān)理規(guī)定》、《監(jiān)理工作三控制計(jì)劃》及《監(jiān)理工作程序》。按照國(guó)家和地方的相關(guān)規(guī)定及監(jiān)理合同分解監(jiān)理目標(biāo)。明確總監(jiān)理工程師、專業(yè)監(jiān)理工程師、監(jiān)理員工作職責(zé),嚴(yán)格按公司ISO9001-20____貫標(biāo)體系把監(jiān)理工作制度化、規(guī)范化、標(biāo)準(zhǔn)化管理。根據(jù)業(yè)主要求的工程質(zhì)量、進(jìn)度、投資控制目標(biāo)及其它施工合同約定目標(biāo)及時(shí)收集工程施工過(guò)程中各種信息,每月向業(yè)主提供一份詳細(xì)的監(jiān)理月報(bào),使業(yè)主自始至終了解工程進(jìn)展情況。本工程監(jiān)理工作控制目標(biāo)達(dá)到合同要求,項(xiàng)目監(jiān)理部已全面履行了監(jiān)理委托合同賦予的義務(wù)、責(zé)任,圓滿完成了本工程施工階段的監(jiān)理任務(wù)。
四、監(jiān)理工作手段
質(zhì)量控制:工程質(zhì)量控制是監(jiān)理工作的一項(xiàng)重要內(nèi)容。我們以施工圖紙、《施工及驗(yàn)收規(guī)范》、《建筑安裝工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》等為依據(jù),根據(jù)本工程合同約定的質(zhì)量目標(biāo),嚴(yán)格監(jiān)督管理。在該項(xiàng)目施工全過(guò)程的質(zhì)量控制中,結(jié)合本工程的實(shí)際情況,將其劃分為事前控制、事中檢查、事后驗(yàn)收三個(gè)過(guò)程,其中以事前控制(預(yù)控)為主。在實(shí)際操作過(guò)程中,嚴(yán)格核查承包單位的質(zhì)量保證及管理體系。查各級(jí)管理人員及特種作業(yè)人員持證上崗情況,核驗(yàn)施工單位的測(cè)量定位放線。
對(duì)承包單位的《施工組織設(shè)計(jì)》認(rèn)真審核并提出了諸多合理化建議。實(shí)行了嚴(yán)格的材料、設(shè)備、構(gòu)配件報(bào)驗(yàn)制度,對(duì)進(jìn)入工地的建筑材料、設(shè)備、構(gòu)配件要求必須出具相應(yīng)的`合格證、檢測(cè)報(bào)告、準(zhǔn)用證等,重要材料、設(shè)備、構(gòu)配件進(jìn)場(chǎng)后由現(xiàn)場(chǎng)監(jiān)理人員見(jiàn)證取樣送檢,嚴(yán)格執(zhí)行見(jiàn)證取樣制度。要求施工單位填寫(xiě)《材料/構(gòu)配件/設(shè)備報(bào)驗(yàn)單》報(bào)監(jiān)理部審核。對(duì)不符合要求,不合格的產(chǎn)品堅(jiān)決不準(zhǔn)用在工程上,從原材料上進(jìn)行事前控制杜絕了質(zhì)量隱患的發(fā)生。重要、關(guān)鍵的分部分項(xiàng)施工,堅(jiān)決要求施工單位拿出相關(guān)施工方案,將施工工藝、原材料使用、勞動(dòng)力配置、質(zhì)量保證措施等情況編寫(xiě)成專項(xiàng)施工方案報(bào)監(jiān)理部審核,累計(jì)共審批施工組織設(shè)計(jì)專項(xiàng)方案,經(jīng)審核確定后,要求施工方嚴(yán)格按照方案實(shí)施,避免了莽撞施工。砼、砂漿施工前必須出具并報(bào)驗(yàn)配合比,砼施工前必須填報(bào)砼澆筑申請(qǐng)單等事前控制措施。
在施工過(guò)程中我們實(shí)行巡視檢查和旁站監(jiān)理及平行檢查多種手段。對(duì)砼施工的分項(xiàng)工程實(shí)行24小時(shí)旁站監(jiān)理,一旦發(fā)現(xiàn)問(wèn)題立即口頭通知承包單位改正,然后由監(jiān)理工程師簽發(fā)《監(jiān)理通知》,發(fā)送承包單位并督促落實(shí)。對(duì)每完成一個(gè)分項(xiàng)、分部工程要求施工單位先自檢,自檢合格后填寫(xiě)《工程質(zhì)量報(bào)驗(yàn)單》,并附《檢驗(yàn)批工程質(zhì)量檢驗(yàn)評(píng)定表》,報(bào)監(jiān)理部簽認(rèn),按所報(bào)項(xiàng)目、現(xiàn)場(chǎng)進(jìn)行詳細(xì)核查,符合要求后,方可進(jìn)行下道工序施工。在施工中實(shí)行停檢點(diǎn)驗(yàn)收制度,重點(diǎn)對(duì)于定位放線、基槽驗(yàn)收、基礎(chǔ)鋼筋、主體結(jié)構(gòu)鋼筋綁扎、屋面防水、管道試壓、絕緣電阻測(cè)試、動(dòng)力系統(tǒng)調(diào)試等有關(guān)重要部位,均請(qǐng)相關(guān)單位共同驗(yàn)收。經(jīng)過(guò)上述有效措施及嚴(yán)格規(guī)范管理,基礎(chǔ)分部、主體分部驗(yàn)收都達(dá)到合格標(biāo)準(zhǔn)。督促承包單位質(zhì)量保證資料隨工程進(jìn)度同步進(jìn)行,及時(shí)完善工程資料。工程達(dá)到交驗(yàn)條件時(shí),及時(shí)協(xié)調(diào)組織由建設(shè)單位、施工承包單位和監(jiān)理方參加的預(yù)驗(yàn)收,針對(duì)工程的質(zhì)量情況、使用功能進(jìn)行全面檢查,并及時(shí)整理出預(yù)驗(yàn)收會(huì)議紀(jì)要。
進(jìn)度控制:從工程一開(kāi)始我們便督促承包單位按施工合同編寫(xiě)《施工總進(jìn)度計(jì)劃》、《施工進(jìn)度網(wǎng)絡(luò)圖》,及《每月進(jìn)度計(jì)劃》等。在施工過(guò)程中向承包單位提出合理化建議,在保證工程質(zhì)量的情況下加快了工程進(jìn)度。制定例會(huì)制度,每周一召開(kāi)現(xiàn)場(chǎng)工程例會(huì),,及時(shí)協(xié)調(diào)解決施工中存在的問(wèn)題,督促落實(shí)計(jì)劃完成情況;當(dāng)發(fā)現(xiàn)工程嚴(yán)重偏離計(jì)劃時(shí),我們及時(shí)組織承包單位分析原因、研究措施,適時(shí)糾偏;嚴(yán)格督促承包單位的人員、材料、施工機(jī)具及時(shí)到位,為合同約定目標(biāo)的實(shí)施提供了有力保證。
投資控制:我們嚴(yán)格執(zhí)行施工合同中工程款的支付程序,認(rèn)真審核承包單位的月工程量完成報(bào)表及月付款報(bào)審表,并根據(jù)業(yè)主核定的數(shù)額簽發(fā)支付憑證。對(duì)于工程變更、技術(shù)核定單及現(xiàn)場(chǎng)經(jīng)濟(jì)簽證都進(jìn)行了嚴(yán)格審查控制,確保業(yè)主的投資計(jì)劃目標(biāo)。
五、監(jiān)理工作成效
1、工程進(jìn)度:人工孔工程主體結(jié)構(gòu)與進(jìn)度計(jì)劃基本相符,后期裝飾、安裝階段由于受到裝飾方案選定、設(shè)計(jì)選型等客觀因素,以及增加連廊影響工期使總進(jìn)度滯后,工期延誤約7個(gè)月。
目前除外墻真石漆外,已完成合同內(nèi)和設(shè)計(jì)文件內(nèi)的工程量并進(jìn)行了預(yù)驗(yàn)收,達(dá)到竣工驗(yàn)收條件。
2、工程投資:通過(guò)嚴(yán)格審核工程變更、現(xiàn)場(chǎng)簽證及月完成工程量等措施,本工程投資控制基本上達(dá)到計(jì)劃預(yù)控目標(biāo),符合業(yè)主確定的投資計(jì)劃。
3、工程質(zhì)量:個(gè)施工過(guò)程中各檢驗(yàn)批.分項(xiàng)工程均能做到精心組織、精心施工,無(wú)重大質(zhì)量事故,無(wú)質(zhì)量安全隱患。
施工質(zhì)量達(dá)到了施工質(zhì)量驗(yàn)收規(guī)范的規(guī)定。
4、同的履行情況:本工程按照設(shè)計(jì)及施工驗(yàn)收規(guī)范的要求,完成了設(shè)計(jì)文件內(nèi)的工程量。
工程交工資料及其他有關(guān)檔案資料書(shū)面整潔、內(nèi)容基本齊全,本單位工程基本符合竣工驗(yàn)收?qǐng)?bào)驗(yàn)要求,監(jiān)理方同意竣工驗(yàn)收。
以上評(píng)定意見(jiàn)是否妥當(dāng)或不足之處,敬請(qǐng)各位參驗(yàn)領(lǐng)導(dǎo)、各位專家提出寶貴意見(jiàn),謝謝各位!
監(jiān)理年終工作總結(jié)報(bào)告5一、工程概況
本工程位于角美開(kāi)發(fā)區(qū)福龍工業(yè)園內(nèi),福龍工業(yè)園區(qū)13#(N28-N29)道路、排水工程從N28以東32米的喇叭口切點(diǎn)起至N29以東4.5米止,路線長(zhǎng)263.5米,道路橫斷面寬度為19米,其中:機(jī)動(dòng)車道2×4.5米、人行道為2×5米。機(jī)動(dòng)車道采用水泥穩(wěn)定層路基、水泥砼剛性路面,人行道設(shè)置路緣石后回填土方,道路埋設(shè)雨水、污水管道、雨污水過(guò)路管道等單位工程,工程質(zhì)量由龍海市建筑工程質(zhì)量監(jiān)督站進(jìn)行監(jiān)督。
本工程于20____年__月__日開(kāi)工,20____年__月__日已達(dá)到基本竣工驗(yàn)收條件;20____年月日正式驗(yàn)收,工程質(zhì)量均達(dá)到合格標(biāo)準(zhǔn)。
二、工程建設(shè)各方的單位名稱及項(xiàng)目負(fù)責(zé)人
建設(shè)單位:福建龍海經(jīng)濟(jì)開(kāi)發(fā)有限公司
項(xiàng)目負(fù)責(zé)人:
設(shè)計(jì)單位:廈門(mén)中沈建筑設(shè)計(jì)院
項(xiàng)目負(fù)責(zé)人:
監(jiān)理單位:漳州市光正工程建設(shè)監(jiān)理有限公司
總監(jiān)理工程師:何惠龍
施工單位:福建東興建筑工程有限公司
項(xiàng)目經(jīng)理:
質(zhì)量監(jiān)督單位:龍海市建設(shè)工程質(zhì)量監(jiān)督站
項(xiàng)目監(jiān)督人:曾寶祥
三、監(jiān)理工作內(nèi)容及方法
1、督促和檢查承包商建立質(zhì)量保證體系。
2、復(fù)核現(xiàn)場(chǎng)定位軸線和高程標(biāo)樁,審查承包商提交的復(fù)測(cè)成果。
3、審查承包商擬用于本工程的原材料、半成品、成品及設(shè)備的品質(zhì)、規(guī)格和質(zhì)量,并按規(guī)定見(jiàn)證取樣,100%見(jiàn)證送檢,復(fù)檢合格后才允許使用。
4、督促承包商嚴(yán)格按照施工合同、現(xiàn)行規(guī)范、規(guī)程、標(biāo)準(zhǔn)、設(shè)計(jì)文件和施工程序進(jìn)行施工,通過(guò)旁站、巡視、檢測(cè)、試驗(yàn)和驗(yàn)收等手段全面控制工程質(zhì)量。
5、對(duì)各工序質(zhì)量進(jìn)度檢查控制,對(duì)隱蔽工程進(jìn)行復(fù)驗(yàn)簽證,督促施工單位整理施工技術(shù)檔案資料。
6、監(jiān)理人員現(xiàn)場(chǎng)駐點(diǎn),對(duì)質(zhì)量存在問(wèn)題的地方及時(shí)發(fā)出監(jiān)理通知單,要求整改,同時(shí)接受市質(zhì)監(jiān)站監(jiān)督人員的不定期檢查,保證工程質(zhì)量。
四、工程質(zhì)量控制情況
1、在工程質(zhì)量控制工作中,貫徹以預(yù)控為主、糾編為輔及全方位、全過(guò)程監(jiān)控的指導(dǎo)思想,重點(diǎn)對(duì)各個(gè)施工環(huán)節(jié)進(jìn)行有效控制,嚴(yán)格控制各工序質(zhì)量。
2、總監(jiān)理工程師組織項(xiàng)目部監(jiān)理人員熟悉施工圖紙,并對(duì)圖紙中存在的問(wèn)題通過(guò)建設(shè)單位向設(shè)計(jì)單位提出意見(jiàn)和建議;
嚴(yán)格按設(shè)計(jì)圖紙進(jìn)行監(jiān)理。
3、嚴(yán)格執(zhí)行砼澆筑審批制,砼澆筑前,鋼筋、模板、水、電各施工班組長(zhǎng)先自檢合格,質(zhì)檢員檢驗(yàn)合格后,經(jīng)專業(yè)監(jiān)理工程師檢驗(yàn)簽字,方澆搗砼。
4、針對(duì)工程的具體情況,定期召開(kāi)工地例會(huì),由總監(jiān)理工程師主持,承包商、項(xiàng)目經(jīng)理、技術(shù)負(fù)責(zé)人和各專業(yè)部門(mén)質(zhì)量負(fù)責(zé)人參加,重點(diǎn)解決本階段施工中存在的質(zhì)量問(wèn)題,協(xié)調(diào)業(yè)主、設(shè)計(jì)、施工單位在施工過(guò)程中存在的配合問(wèn)題,并提出下一階段的質(zhì)量要求。
5、在工程施工中嚴(yán)格執(zhí)行現(xiàn)行國(guó)家的建筑工程施工質(zhì)量驗(yàn)收規(guī)范及有關(guān)的質(zhì)量驗(yàn)收標(biāo)準(zhǔn)、工程建設(shè)強(qiáng)制性條文;
加強(qiáng)質(zhì)量跟蹤監(jiān)控,主要通過(guò)旁站觀察、現(xiàn)場(chǎng)檢查、測(cè)量、試驗(yàn)等控制手段,對(duì)施工工藝過(guò)程的質(zhì)量嚴(yán)格控制。
6、業(yè)主代表不定期到現(xiàn)場(chǎng)檢查,指出施工過(guò)程中的質(zhì)量問(wèn)題,監(jiān)理人員督促施工單位進(jìn)行整改;
業(yè)主指定部分材料和品牌,在現(xiàn)場(chǎng)施工過(guò)程中已得到業(yè)主檢查。
7、龍海市建設(shè)工程質(zhì)量監(jiān)督站各有關(guān)專業(yè)監(jiān)督員對(duì)主要分部分項(xiàng)工程進(jìn)行中間驗(yàn)收:
(1) 教學(xué)樓---20____年__月__日樁基礎(chǔ)驗(yàn)收,20____年__月__日地
基與基礎(chǔ)驗(yàn)收,20____年__月__日主體結(jié)構(gòu)驗(yàn)收;
(2) 圖書(shū)館---20____年__月__日樁基礎(chǔ)驗(yàn)收,20____年__月__日地
基與基礎(chǔ)驗(yàn)收,20____年__月__日主體結(jié)構(gòu)驗(yàn)收;
(3) 宿舍樓---20____年__月__日樁基礎(chǔ)驗(yàn)收,20____年__月__日地
基與基礎(chǔ)驗(yàn)收,20____年__月__日主體結(jié)構(gòu)驗(yàn)收。
(4) 以上驗(yàn)收均為合格等級(jí)標(biāo)準(zhǔn)。
8、監(jiān)理工程師組織各專業(yè)監(jiān)理人員于20____年__月__日對(duì)竣工的工程項(xiàng)目進(jìn)行初驗(yàn)收,對(duì)發(fā)現(xiàn)的質(zhì)量問(wèn)題提出整改意見(jiàn),要求施工單位采取有效措施進(jìn)行整改;
對(duì)施工單位的內(nèi)業(yè)資料進(jìn)行檢查,資料基本齊全,施工單位已完成合同約定的內(nèi)容和業(yè)主的要求具備驗(yàn)收條件,監(jiān)理單位于20____年__月10出具了教學(xué)樓、圖書(shū)館的質(zhì)量評(píng)估報(bào)告,于20____年__月__日出具了宿舍樓質(zhì)量評(píng)估報(bào)告,同意施工單位報(bào)請(qǐng)預(yù)驗(yàn)收。
9、漳州市質(zhì)量監(jiān)督站監(jiān)督員對(duì)本工程進(jìn)行預(yù)驗(yàn)收,提出以下主要問(wèn)題:
(1) 伸縮縫防水處理不當(dāng),有滲水現(xiàn)象;
(2) 疏散樓梯寬度不夠,樓梯扶手高度不夠;
(3) 塑鋼窗密封膠漏打,未設(shè)置防撞墊;
(4) 無(wú)障礙通道兩側(cè)未設(shè)置欄桿扶手;
(5) 屋面女兒墻未設(shè)置分格縫。
10、建設(shè)單位組織市質(zhì)監(jiān)站、設(shè)計(jì)單位、地質(zhì)勘察單位、監(jiān)理單位、施工單位等有關(guān)人員于20____年__月__日對(duì)教學(xué)樓、圖書(shū)館工程進(jìn)行正式驗(yàn)收,于20____年__月__日對(duì)宿舍樓工程進(jìn)行正式驗(yàn)收,驗(yàn)收組聽(tīng)取勘察單位、設(shè)計(jì)單位、監(jiān)理單位、施工單位的報(bào)告,查看現(xiàn)場(chǎng),檢查外觀質(zhì)量,有關(guān)各方一致同意本工程通過(guò)正式驗(yàn)收,至此,本工程全部竣工,現(xiàn)場(chǎng)的監(jiān)理工作結(jié)束。
五、工程進(jìn)度的控制情況
按合同要求,本工程應(yīng)于20____年__月__日竣工,由于業(yè)主修改部分裝修內(nèi)容,以及主體工程和裝修工程交叉作業(yè),多工種相互影響,實(shí)際工期比合同工期拖延。
六、工程造價(jià)的控制情況
合同范圍內(nèi)的項(xiàng)目,按合同及施工圖紙進(jìn)行施工;業(yè)主增加的項(xiàng)目或設(shè)計(jì)變更的項(xiàng)目,其工程量及費(fèi)用由業(yè)主自行控制。
級(jí)別:北大期刊
榮譽(yù):中國(guó)優(yōu)秀期刊遴選數(shù)據(jù)庫(kù)
級(jí)別:北大期刊
榮譽(yù):Caj-cd規(guī)范獲獎(jiǎng)期刊
級(jí)別:部級(jí)期刊
榮譽(yù):中國(guó)期刊全文數(shù)據(jù)庫(kù)(CJFD)
級(jí)別:省級(jí)期刊
榮譽(yù):中國(guó)期刊全文數(shù)據(jù)庫(kù)(CJFD)
級(jí)別:北大期刊
榮譽(yù):Caj-cd規(guī)范獲獎(jiǎng)期刊