公務(wù)員期刊網(wǎng) 精選范文 隧道施工技術(shù)指南范文

隧道施工技術(shù)指南精選(九篇)

前言:一篇好文章的誕生,需要你不斷地搜集資料、整理思路,本站小編為你收集了豐富的隧道施工技術(shù)指南主題范文,僅供參考,歡迎閱讀并收藏。

隧道施工技術(shù)指南

第1篇:隧道施工技術(shù)指南范文

Abstract: In traffic construction, tunnel occupies a very important position. Tunnel construction is a very complex project, master well the quality of tunnel construction technology can have a good grasp of the tunnel construction, which has great significance for the safety and quality of traffic construction.

關(guān)鍵詞: 隧道施工;問(wèn)題;施工;技術(shù);方法

Key words: tunnel construction;problems;construction;technology;method

中圖分類號(hào):U455.4 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1006-4311(2014)14-0098-02

0 引言

隨著公路隧道建筑規(guī)模的逐漸擴(kuò)大,兩車隧道已經(jīng)遠(yuǎn)遠(yuǎn)不能滿足日漸增長(zhǎng)的行車需要,三車隧道在實(shí)踐中得到大規(guī)模的運(yùn)用。但是隧道規(guī)模越大技術(shù)也相應(yīng)復(fù)雜,因此,與過(guò)去一般的公路隧道相比,在設(shè)計(jì)、施工以及運(yùn)營(yíng)管理方面均有質(zhì)的不同,這就給公路隧道建設(shè)者帶來(lái)挑戰(zhàn)。本文就公路隧道施工技術(shù)結(jié)合自身工作經(jīng)驗(yàn)進(jìn)行了探析。

1 我國(guó)隧道工程常用施工技術(shù)及存在的問(wèn)題

我國(guó)目前主要的施工技術(shù)有:深海底抗壓建設(shè)技術(shù);深層鉆爆施工技術(shù);超淺埋、淺埋暗造技術(shù);輔助工程建造技術(shù);盾構(gòu)法建造技術(shù);開敞式新型挖掘技術(shù);保護(hù)環(huán)境施工技術(shù);深管道埋藏技術(shù)等許多其它新技術(shù)。

在施工修建的過(guò)程中存在的問(wèn)題也很多,就目前隧道工程發(fā)展而言,其主要問(wèn)題有:①對(duì)土質(zhì)結(jié)構(gòu)了解不深,致使確定施工方案存有不合理之處,造成出現(xiàn)豆腐渣工程現(xiàn)狀;②高原冷凍鐵路的質(zhì)量難以保證,耐用性能較弱;③海底隧道抗壓效果達(dá)不到實(shí)際要求,常出現(xiàn)變形問(wèn)題;④新技術(shù)開發(fā)速度較慢,滿足不了社會(huì)建設(shè)的需求,亟待提高;⑤環(huán)保隧道技術(shù)做的不夠到位,造成環(huán)境被破壞的現(xiàn)象時(shí)有發(fā)生;⑥隧道工程建設(shè)系統(tǒng)缺乏統(tǒng)一的施工標(biāo)準(zhǔn)要求,常出現(xiàn)施工不科學(xué)問(wèn)題。

2 施工準(zhǔn)備期的技術(shù)準(zhǔn)備

2.1 施工環(huán)境的勘測(cè) ①我們根據(jù)地質(zhì)鉆探資料的審查對(duì)圍巖進(jìn)行分類,不難看出在對(duì)地質(zhì)工程特點(diǎn)進(jìn)行分析的時(shí)候,如果對(duì)巖層走向、褶曲、斷層以及地下水和特殊土等分析有誤,對(duì)施工就會(huì)造成十分嚴(yán)重的影響。②有針對(duì)性的對(duì)施工現(xiàn)場(chǎng)進(jìn)行核查,核查的方面主要就是包括:地質(zhì)、供水、氣象、排水、原材料、動(dòng)力供應(yīng)、運(yùn)輸條件、棄渣、場(chǎng)地等。對(duì)于風(fēng)化堆積較為嚴(yán)重的洞口及淺埋段等,我們要有健全的方案進(jìn)行治理或補(bǔ)償。

2.2 施工材料設(shè)備和方案的準(zhǔn)備 ①要想工地實(shí)驗(yàn)室期限達(dá)到質(zhì)監(jiān)站臨時(shí)資質(zhì)審批要求,就需要我們有健全的試驗(yàn)設(shè)備、技術(shù)人員以及完善的管理制度。當(dāng)承包商與業(yè)主簽訂合同后,監(jiān)理工程師就可以根據(jù)合同規(guī)定的時(shí)間,要求承包商按照合同承諾進(jìn)行各項(xiàng)籌備工作了。②開工前監(jiān)理工程對(duì)兩端反外控制點(diǎn)近反復(fù)檢查。③承包商及時(shí)按合同規(guī)定的日期上報(bào)總體性計(jì)劃和具體實(shí)施計(jì)劃,這樣才能保證監(jiān)理工程師對(duì)工程進(jìn)行整體調(diào)查、分析,然后根據(jù)出現(xiàn)的問(wèn)題與承包商進(jìn)行討論、澄清、修改。

3 施工方法

隧道施工方法主要有:全斷面法、臺(tái)階法、臺(tái)階分部法、上(下)導(dǎo)坑法、單側(cè)壁導(dǎo)坑法、雙側(cè)壁導(dǎo)坑法等六種。

目前,我國(guó)隧道施工主要是以新奧法為主的,新奧法施工的精髓就是將圍巖作為支護(hù)的一部分,共同承受上覆荷載的壓力。利用新奧法進(jìn)行隧道施工,無(wú)論在進(jìn)度上還是質(zhì)量上以及工程費(fèi)用上都會(huì)存在明顯的優(yōu)越性。然而,隨著設(shè)計(jì)的支護(hù)形式和施工工藝存在的差異,在施工過(guò)程中要想根據(jù)圍巖性質(zhì)及地質(zhì)變化適時(shí)對(duì)施工工藝以及支護(hù)形式進(jìn)行調(diào)整。我們?cè)谶M(jìn)行大跨度隧道施工的時(shí)候,主要選擇的方法就是:上半斷面臺(tái)階法,中隔壁法和雙側(cè)臂導(dǎo)坑法(眼鏡法)等。

4 隧道施工的主要技術(shù)分析

4.1 軟弱破碎圍巖段施工技術(shù) 針對(duì)軟弱的圍巖可能發(fā)生的大變形,采用增大預(yù)留變形量和噴射混凝土、錨桿、鋼筋網(wǎng)和可縮性的U型鋼拱架復(fù)合式襯砌手段,采用分部開挖的方法,初期支護(hù)及時(shí)封閉,噴射混凝土可以分2~3次施工,然后加強(qiáng)監(jiān)控量測(cè),利用反饋的信息進(jìn)行施工指導(dǎo)。通過(guò)軟弱破碎帶段富水段時(shí),先治水,采用排堵結(jié)合等治理措施。開挖過(guò)程中配備有經(jīng)驗(yàn)的地質(zhì)工程師24小時(shí)輪流值班,及時(shí)監(jiān)控地質(zhì)變化情況,指導(dǎo)現(xiàn)場(chǎng)施工。

加強(qiáng)監(jiān)控量測(cè),當(dāng)初期支護(hù)變形異常且無(wú)收斂趨勢(shì)的時(shí)候,就是需要我們調(diào)整支護(hù)參數(shù),必要時(shí)可以實(shí)施二次襯砌。因此,二次襯砌就是為了增設(shè)鋼筋和提高混凝土強(qiáng)度的一種措施。

4.2 隧道防滲漏、防坍塌技術(shù) ①防滲漏技術(shù)。隧道的二次襯砌主要是提高混凝土的抗?jié)B性能,也是避免膨脹的一道工序,主要作用就是防止復(fù)合防水板局部因?yàn)槠屏训仍蛟斐傻臐B水。因此,我們要根據(jù)水量的增加情況,對(duì)盲溝布設(shè)進(jìn)行設(shè)計(jì),以更佳有利于排水。在進(jìn)行防水板施工的時(shí)候,我們除了要嚴(yán)格檢查焊縫焊接情況,還要確保施工縫、變形縫等不滲不漏。②防坍塌技術(shù)措施。采用減震爆破,盡量減少對(duì)圍巖的擾動(dòng)。開挖成型后及時(shí)施作噴砼等初期支護(hù),使圍巖盡早達(dá)到穩(wěn)定狀態(tài)。對(duì)圍巖自穩(wěn)能力較差地段,采用超前支護(hù)或超前加固前方圍巖,堅(jiān)持先護(hù)頂后開挖的原則組織施工。當(dāng)初期支護(hù)變形出現(xiàn)異?,F(xiàn)象且無(wú)收斂趨勢(shì)時(shí),采取初期支護(hù)加強(qiáng)措施,并提前施做二次襯砌。在二次襯砌中,采取增設(shè)鋼筋和提高混凝土強(qiáng)度等措施。根據(jù)地質(zhì)勘察資料,巖層與隧道軸線夾角較小,為此,采取減小循環(huán)進(jìn)尺,加強(qiáng)超前支護(hù),加固圍巖的措施進(jìn)行預(yù)防。在圍巖含水地段先治水:當(dāng)有滲水流時(shí)設(shè)置橡膠帶盲溝引排:滲水面積較大時(shí)橡膠帶盲溝可并排設(shè)置。當(dāng)有集中股水流時(shí)設(shè)置彈簧盲溝引排,將水壓力對(duì)初期支護(hù)的影響降至最小。為了加強(qiáng)對(duì)施工過(guò)程的控制:開挖過(guò)程中配備有經(jīng)驗(yàn)的地質(zhì)工程師24小時(shí)輪流值班,及時(shí)監(jiān)控地質(zhì)變化情況,指導(dǎo)現(xiàn)場(chǎng)施工。軟弱不穩(wěn)定圍巖地段,主要領(lǐng)導(dǎo)輪流值班,強(qiáng)管理,嚴(yán)要求,及時(shí)處理緊急問(wèn)題。

4.3 防排水施工技術(shù) ①施工縫、變形縫防水。施工縫主要是隧道襯砌混凝土在施工時(shí)候所產(chǎn)生的冷接造成的,也是防水的薄弱環(huán)節(jié),是整個(gè)隧道中最容易發(fā)生滲漏的地方。因此,我們?cè)趯?duì)隧道進(jìn)行襯砌施工處理的時(shí)候,要避免因?yàn)樘幚聿缓枚斐伤淼赖恼J褂煤托熊嚢踩?,?yán)重的還會(huì)降低結(jié)構(gòu)的強(qiáng)度和耐久性。為了防止襯砌不均勻引起的裂損,我們就需要對(duì)沉降縫進(jìn)行設(shè)置,避免因?yàn)闇囟鹊膭×易兓鴮?dǎo)致混凝土收縮引起襯砌開裂。②防水混凝土。隧道二次襯砌混凝土既是外力的承載結(jié)構(gòu),也是最后一道防水線。而防水混凝土大多數(shù)都是通過(guò)規(guī)定的級(jí)進(jìn)行配比,并摻入少量外加劑,通過(guò)調(diào)整配合比配置成具有一定抗?jié)B能力的防水混凝土。我國(guó)的鐵路隧道工程技術(shù)指南要求的二次混凝土的抗?jié)B等級(jí)不得低于P8。

4.4 隧道二襯施工技術(shù) ①鋼筋加工及安裝。鋼筋采用加工專用設(shè)備進(jìn)行加工,主要采用的就是單面焊接形式對(duì)鋼筋接頭進(jìn)行焊接,焊接的長(zhǎng)度一般不得低于10d。鋼筋焊接主要就是保證焊縫飽滿度,并鑿除焊渣。采用自制臺(tái)車進(jìn)行安裝,安裝時(shí)應(yīng)根據(jù)設(shè)計(jì)尺寸及保護(hù)層進(jìn)行施工。②灌注砼。臺(tái)車就位后,可以采用松木板將端頭封牢。砼輸送泵管道通過(guò)臺(tái)車上部的天窗接入模內(nèi),同時(shí)砼輸送車將砼倒入輸送泵內(nèi),由輸送泵將砼通過(guò)管道壓入模內(nèi)。

5 結(jié)束語(yǔ)

在進(jìn)行隧道施工時(shí),要在安全、有序、優(yōu)質(zhì)、高效的指導(dǎo)思想下,努力控制隧道施工質(zhì)量達(dá)到最優(yōu)化。不斷的更新隧道的施工技術(shù),針對(duì)各個(gè)控制點(diǎn),有針對(duì)性的采取合適的施工技術(shù),確保隧道施工的質(zhì)量。

參考文獻(xiàn):

[1]陳小雄主編.隧道施工技術(shù)[M].北京:人民交通出版社, 2011,6.

第2篇:隧道施工技術(shù)指南范文

關(guān)鍵詞:隧道 防排水 施工

中圖分類號(hào):TG51 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1672-3791(2013)02(c)-0051-01

1 工程概況及防排水設(shè)計(jì)情況

新屋河隧道位于湖北省大悟縣境內(nèi),全長(zhǎng)1774 m,起止里程DK1096+419~DK1098+413。隧道縱坡:?jiǎn)蚊嫫?,坡度?2‰,坡長(zhǎng)2700m。[2]。新屋河隧道的防排水設(shè)計(jì),采用“防、排、截、堵結(jié)合,因地制宜,綜合治理”的原則,以達(dá)到防水可靠、排水暢通、經(jīng)濟(jì)合理的目的,并滿足地下工程國(guó)家一級(jí)防水標(biāo)準(zhǔn)。

隧道防水措施包括:初期支護(hù)混凝土防水;防水層防水;施工縫與變形縫防水;二襯自防水等。隧道排水措施包括:縱向及環(huán)向盲管;雙側(cè)水溝、中心水溝、檢查井及橫向引水管等。

2 隧道防水施工技術(shù)

2.1 初期支護(hù)混凝土防水

噴混凝土作為防水層是被國(guó)際隧協(xié)所提倡的,但這種觀點(diǎn)在國(guó)內(nèi)尚未被廣泛接受。設(shè)計(jì)單位雖然對(duì)噴射混凝土材料及施工工藝有要求,但未從防水的角度做針對(duì)性的設(shè)計(jì)[3]。作為復(fù)合式襯砌的最外層支護(hù)及第一道防水屏障,其在整個(gè)隧道防水體系中起著重要的作用,但設(shè)計(jì)與施工單位只是注重了初支混凝土的安全支護(hù)作用,而忽視了初支混凝土還應(yīng)該起到防水的作用。

2.2 防水層防水

2.2.1 基面處理

防水層鋪設(shè)前,先對(duì)隧道初期支護(hù)噴射混凝土表面進(jìn)行處理,切除錨桿頭和鋼筋露頭,并用細(xì)石混凝土磨平覆蓋,確?;炷帘砻嫫秸?,無(wú)尖銳棱角。

2.2.2 鋪設(shè)土工布

首先用簡(jiǎn)易作業(yè)臺(tái)車將單幅無(wú)紡布固定到預(yù)定位置,然后用專用熱熔襯墊及射釘將無(wú)紡布固定在噴射混凝土上。

2.2.3 鋪設(shè)防水板

先用簡(jiǎn)易作業(yè)臺(tái)車將防水板固定到預(yù)定位置,然后用手動(dòng)電熱熔器加熱,使防水板焊接在固定無(wú)紡布的專用熱熔襯墊上。防水板間自動(dòng)熱熔焊接用自動(dòng)雙縫熱熔焊接機(jī)按照預(yù)定的溫度、速度焊接,防水板搭接寬度須大于15 cm。

注意事項(xiàng)。

(1)防水板在施工中盡量緊貼巖面,松緊度應(yīng)適中,由于平整度不易控制,施作防水板時(shí)應(yīng)預(yù)留變形尺寸,避免因二襯混凝土施作而產(chǎn)生的表面拉應(yīng)力破壞防水板[4]。

(2)防水板搭接縫應(yīng)與變形縫、施工縫等防水薄弱環(huán)節(jié)錯(cuò)開0.5 m以上。

(3)鋼筋焊接作業(yè)時(shí),防水板要用阻燃隔熱板進(jìn)行防護(hù),避免電焊火花損傷防水板。

2.3 施工縫與變形縫防水

2.3.1 施工縫防水

環(huán)向施工縫處設(shè)置中埋式止水帶和背貼式止水帶,縱向施工縫處設(shè)置中埋式止水帶和遇水膨脹止水膠。

2.3.2 變形縫防水

變形縫防水采用中埋式止水帶、背貼式止水帶及遇水膨脹止水膠等。拱墻變形縫處襯砌內(nèi)緣3 cm范圍內(nèi)以聚硫密封膠封堵,其余空隙采用填縫料填塞密實(shí)。

注意事項(xiàng)。

兩縫防水的關(guān)鍵是中埋式止水帶,在澆筑混凝土施工時(shí),受混凝土重力擠壓等,容易翻轉(zhuǎn)、扭結(jié),如發(fā)現(xiàn)有扭結(jié)不展現(xiàn)象應(yīng)及時(shí)進(jìn)行調(diào)正。

2.4 二襯自防水

隧道二襯混凝土既是承載結(jié)構(gòu),也是隧道防水的最后一道防線,因此要求襯砌既要有足夠的強(qiáng)度,還要具有一定的抗?jié)B性,新屋河隧道襯砌混凝土設(shè)計(jì)抗?jié)B防水等級(jí)不小于P10。

注意事項(xiàng)。

(1)二襯自防水的關(guān)鍵是混凝土本體的施工質(zhì)量,包括了混凝土的制作、運(yùn)輸和施工,任何一個(gè)環(huán)節(jié)出現(xiàn)問(wèn)題都將直接影響到其使用功能。

(2)二襯封頂時(shí),混凝土澆筑不宜過(guò)快,否則易導(dǎo)致拱頂混凝土不密實(shí),形成空隙。

3 隧道排水施工技術(shù)

3.1 環(huán)、縱向排水盲管

隧道內(nèi)設(shè)置縱向Φ100 mm、環(huán)向Φ50 mm雙壁打孔波紋管??v向排水管長(zhǎng)10 m一段,每段縱向排水管中間設(shè)Φ100PVC泄水管一處;環(huán)向排水管縱向間距8~10 m并根據(jù)地下水發(fā)育情況調(diào)整,縱向排水管兩端及環(huán)向排水管下端進(jìn)行圓彎后接入隧道側(cè)溝。

注意事項(xiàng)。

澆筑二襯混凝土?xí)r,易造成環(huán)、縱向盲管及泄水孔堵塞,要及時(shí)檢查處理,保證管路暢通。

3.2 中心水溝、側(cè)溝、橫向引水管、檢查井等

中心水溝在施工仰拱填充混凝土?xí)r,將事先預(yù)制好的預(yù)制混凝土管按設(shè)計(jì)位置埋設(shè);每30 m設(shè)置檢查井一個(gè),通過(guò)橫向引水管將測(cè)溝與中心溝連通。

注意事項(xiàng):

由于測(cè)溝落后仰拱、二襯施工時(shí)間較長(zhǎng),日常對(duì)管頭進(jìn)行包裹,以免堵塞,施工測(cè)溝前對(duì)管路進(jìn)行檢查、清理,保證暢通。

4 結(jié)語(yǔ)

隧道防排水是個(gè)系統(tǒng)工程,要使最終建成的工程滿足既定的標(biāo)準(zhǔn),保證其使用功能,需要各方的共同努力。首先,各方應(yīng)該重視初期支護(hù)混凝土的防水作用。其次,施工方要體會(huì)設(shè)計(jì)的真正意圖,施工過(guò)程中,嚴(yán)格設(shè)計(jì),但不拘泥于設(shè)計(jì),因地制宜,并在施工中加強(qiáng)管理,提高施工質(zhì)量,才能保證隧道在運(yùn)營(yíng)期間不滲、不漏水,排水通暢。

參考文獻(xiàn)

[1] 中鐵一局集團(tuán)有限公司.客運(yùn)專線鐵路隧道工程施工技術(shù)指南[S].北京:中國(guó)鐵道出版社,20059.

[2] 鐵道第二勘察設(shè)計(jì)院.新建鐵路石家莊至武漢客運(yùn)專線新屋河隧道設(shè)計(jì)資料[R].成都:鐵道第二勘察設(shè)計(jì)院,2008,7.

第3篇:隧道施工技術(shù)指南范文

【關(guān)鍵詞】鐵路隧道;施工技術(shù);防水排水。

隧道設(shè)計(jì)人類在改造世界過(guò)程中做出的巨大的創(chuàng)舉,在古代,沒(méi)有任何交通工具的情況下,人與人之間的來(lái)往很可能就要翻越很多座大山,“愚公移山”的故事在現(xiàn)在看來(lái)沒(méi)有什么,但是在當(dāng)時(shí)卻是擺在人們面前的一個(gè)難題。而當(dāng)今隧道的挖掘?qū)⑻靿q變?yōu)榱送ㄍ?,將大山隔絕開來(lái)的兩邊整合在了一體,大大節(jié)約了人們的時(shí)間。在隧道施工過(guò)程中,安全問(wèn)題是非常重要的,安全問(wèn)題除了相關(guān)施工技術(shù)方面的原因之外,滲水漏水也是巨大的安全隱患。滲水漏水的原因是多方面的,也與其他的一些病害是相關(guān)聯(lián)的,滲漏水會(huì)造成各種病害的發(fā)生,大大降低隧道的安全性和使用壽命,所以必須予以重視。

一、地下水對(duì)鐵路隧道的巨大影響

我們這里將地下水對(duì)鐵路隧道的影響專門列出來(lái)闡述,將大氣降水排除在外,一是因?yàn)榇髿饨邓緹o(wú)法控制,施工過(guò)程也應(yīng)當(dāng)做好了隧道巖壁的防水工作,但是地下水不同,在施工前和施工過(guò)程中不可能對(duì)整個(gè)地下水的情況進(jìn)行十分確切、深入的了解,無(wú)法有針對(duì)性地將所有防水工作做得完善。

地下水一般分為三種類型,區(qū)分的依據(jù)是埋藏的條件。巖土層中的水主要是巖石和土壤中的水,潛水指的是地面以下具有自由水面的水,承壓水則是兩個(gè)隔水層之間承受著壓力的水。這地下水的運(yùn)動(dòng)是十分復(fù)雜的,不僅僅是我們想象的那樣單受重力影響向下流動(dòng)。很多地下水存在于各種空隙中,運(yùn)動(dòng)情況規(guī)律很難把握。在這種情況下,地下水對(duì)隧道的影響主要體現(xiàn)在對(duì)圍巖、襯砌結(jié)構(gòu)和運(yùn)營(yíng)環(huán)境三方面的影響。對(duì)圍巖的影響主要是侵蝕和軟化,將其物理和化學(xué)性質(zhì)發(fā)生改變;對(duì)襯砌結(jié)構(gòu)的影響是產(chǎn)生各種壓力;對(duì)運(yùn)營(yíng)環(huán)境的影響就是將隧道內(nèi)變得潮濕,對(duì)其正常運(yùn)營(yíng)十分不利。

二、隧道防水排水工作存在的問(wèn)題及對(duì)策

隧道防水排水工作非常重要,應(yīng)當(dāng)獲得各方面的普遍重視。但是現(xiàn)實(shí)中,在防水排水工作中還存在著不少的問(wèn)題。首先,防水排水設(shè)計(jì)依據(jù)較為混亂。隧道的施工與道路和橋梁的施工不同,后者能夠?qū)⒅車沫h(huán)境監(jiān)測(cè)地比較清楚明了,而隧道施工很難進(jìn)行細(xì)致的勘探,所以設(shè)計(jì)的依據(jù)上并沒(méi)有特別大的參考價(jià)值。其次,防水排水相關(guān)技術(shù)不完善。當(dāng)前我國(guó)的防排水工作沒(méi)有系統(tǒng)的規(guī)范要求,各個(gè)工程的施工單位往往依據(jù)經(jīng)驗(yàn)和工程成本自行解決,沒(méi)有科學(xué)性;再次,防水等級(jí)不確定。沒(méi)有等級(jí)上的明晰,就無(wú)法真正認(rèn)定有沒(méi)有防水和排水的必要性,某些嚴(yán)重情況就會(huì)被遺漏,可能會(huì)造成巨大的損失。最后,各部門之間的交流和協(xié)調(diào)不夠,沒(méi)有將理論研究、設(shè)計(jì)勘測(cè)、施工單位三位一體的融合作為系統(tǒng)工作去做。

針對(duì)上述的問(wèn)題,在鐵路隧道防水排水工作中,應(yīng)當(dāng)做到四個(gè)要點(diǎn)。一是防水,要盡可能地在成本允許的范圍內(nèi)對(duì)勘探活動(dòng)進(jìn)行完善,做好前期的防水設(shè)計(jì),在施工中,做好洞頂?shù)乇矸琅潘鸵r砌背面的排水措施;二是在結(jié)構(gòu)上做好防水工作,做好防水層。防水層要選用合適的材料,在當(dāng)前防水層材料的選擇上,預(yù)制的防水板因?yàn)槠涫┕け憬?、綠色環(huán)保受到當(dāng)前施工單位的青睞。需要注意的一點(diǎn)是,對(duì)于防水的混凝土來(lái)說(shuō),特別要注意配比問(wèn)題,因?yàn)榛炷恋乃疅峄瘯?huì)導(dǎo)致混凝土裂縫,完全起不到應(yīng)有的防水效果;三是做好截水和堵水工作,從隧道洞外和地下都做好截水工作。在地表,可以開挖各種疏導(dǎo),將地表水引出隧道范圍,使降水時(shí)水流也能夠及時(shí)排走,而地下水則可以設(shè)置專門的設(shè)施例如鉆孔截水等等。對(duì)于堵水來(lái)說(shuō),一般就是用注漿的方式來(lái)進(jìn)行。注漿的方法也要根據(jù)具體工程的不同進(jìn)行具體的調(diào)整。

三、結(jié)語(yǔ)

其實(shí)對(duì)于隧道的滲水、漏水,原因是多方面的。但是在隧道施工階段,必須做好防水排水工作,那么后期一旦出現(xiàn)滲水、漏水,一定是出現(xiàn)了各種問(wèn)題。這些問(wèn)題可能在材料上,也可能在施工技術(shù)上,需要根據(jù)不同的情況進(jìn)行不同的判斷和處理。隧道防排水一定要遵循的原則就是首先必須將出現(xiàn)的水排出去、然后防水和排水工作相結(jié)合、根據(jù)隧道工程的不同靈活選用各種施工技術(shù)、進(jìn)行多重的防水和排水措施。不過(guò),盡管如此,施工單位也應(yīng)當(dāng)意識(shí)到隧道工程的防水工作一直是世界范圍內(nèi)的難題,防水排水工作不僅涉及工程學(xué)相關(guān)知識(shí),還涉及了地理學(xué)、化學(xué)工程等等綜合學(xué)科,在理論上尚有很多問(wèn)題沒(méi)有解決。在實(shí)踐中相關(guān)單位應(yīng)當(dāng)盡可能地做到完善,確保隧道的安全。

參考文獻(xiàn)

[1]呂康成,崔凌秋.隧道防排水工程指南(第一版)[M].北京:人民交通出版社,2005.

[2]梁巍,郭小紅.廈門翔安海底隧道防排水設(shè)計(jì)和施工介紹[J].中國(guó)建筑防水,2008(2).

第4篇:隧道施工技術(shù)指南范文

關(guān)鍵詞:淺埋 偏壓洞口段 施工技術(shù)

中圖分類號(hào):TU74 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

鐵路的發(fā)展與我國(guó)的國(guó)計(jì)民生息息相關(guān),在我國(guó)的交通體系有著不可替代的作用。近年來(lái),隨著我國(guó)國(guó)民經(jīng)濟(jì)快速、穩(wěn)定、持續(xù)增長(zhǎng),人們的出行要求出現(xiàn)了日新月異的變化。鐵路事故與鐵路公共安全事件也屢見不鮮。這些突發(fā)事件不僅給社會(huì)和人員造成極大的損失,還給鐵路的運(yùn)輸組織工作帶來(lái)了重大的挑戰(zhàn)。淺埋偏壓圍巖隧道地形復(fù)雜,掘進(jìn)施工易產(chǎn)生變形,且變形量大,甚至發(fā)生突發(fā)事件,是隧道施工的重點(diǎn)和難點(diǎn)所在,施工前必須弄清楚圍巖的工程地質(zhì)特性和可能發(fā)生的各種災(zāi)害,制定確實(shí)可行的施工方案和施工方法;同時(shí),加強(qiáng)開挖后圍巖變形量測(cè),及時(shí)準(zhǔn)確地掌握圍巖的變形量、變形時(shí)間和變形規(guī)律,并分析整理數(shù)據(jù),及時(shí)調(diào)整施工方案,以達(dá)到減小危害,指導(dǎo)施工的目的。

1工程概況

南廣高鐵是兩廣交通經(jīng)濟(jì)大動(dòng)脈,桂粵兩省區(qū)最便捷的快速通道,南廣鐵路突村1#隧道全長(zhǎng)186 m,隧址區(qū)位于丘陵區(qū),地形起伏較大,圍巖上部為第四系殘坡積粉質(zhì)粘土,易滑塌,下伏燕山期花崗巖,洞身全風(fēng)化,呈砂土狀及碎塊狀,為極軟巖,洞身風(fēng)化層圍巖較差,洞口中線與等高線斜交,有明顯偏壓現(xiàn)象。右側(cè)洞口60m淺埋段覆蓋層為2.1m~13.5m不等,隧道開挖時(shí),洞頂易坍塌,側(cè)壁易失穩(wěn)。

2施工方案

全隧道按三臺(tái)機(jī)七步開挖法施工,在洞口淺埋段范圍內(nèi)為殘坡積粉質(zhì)粘土,,圍巖不穩(wěn)定,易滑塌,防水、防塌成為制約洞口段施工的關(guān)鍵因素。施工中首先對(duì)洞口段左側(cè)進(jìn)行反壓回填夯實(shí),同時(shí)對(duì)右側(cè)增加地表注漿,加強(qiáng)洞口右側(cè)圍巖穩(wěn)定,再施作導(dǎo)向墻和40 m長(zhǎng)大管棚對(duì)洞口段進(jìn)行超前支護(hù),然后進(jìn)行正洞開挖。

3施工方法

3.1邊、仰坡開挖及支護(hù)

1)由于粉質(zhì)粘土自身的特點(diǎn),且隧址區(qū)均為丘陵區(qū),廣西地區(qū)雨季時(shí)間長(zhǎng),雨水來(lái)勢(shì)猛,所以必須避開雨季施工可能對(duì)隧道造成的隱患。

2)在雨季到來(lái)之前,完善洞口錨桿、鋼筋網(wǎng)、噴射混凝土邊、仰坡防護(hù),及時(shí)砌筑天溝、截水溝,并對(duì)反壓回填部分進(jìn)行特殊防護(hù)處理。

3)邊、仰坡防護(hù)完成后施工洞口導(dǎo)向墻,縱向設(shè)置1.5m,厚100cm,導(dǎo)向墻內(nèi)埋設(shè)四榀工字型鋼架支撐,由于導(dǎo)向管安設(shè)的平面位置、傾角、外插角的準(zhǔn)確度直接影響管棚的質(zhì)量,因此導(dǎo)向管必須用全站儀以坐標(biāo)法在工字鋼架上定出其平面位置,用水準(zhǔn)尺配合坡度板設(shè)定管口的傾角,用前后差距法設(shè)定導(dǎo)向管的外插角;導(dǎo)向管應(yīng)牢固焊接在工字鋼上,防止?jié)仓炷習(xí)r產(chǎn)生位移。

3.2超前支護(hù)

采用40m長(zhǎng)108大管棚對(duì)洞口段進(jìn)行超前支護(hù)。沿隧道開挖外緣環(huán)向距離為0.4m打入一排縱向鋼管,并且在插入鋼管后再往管內(nèi)注雙液漿以固結(jié)軟弱圍巖、充填鋼管與孔壁之間的空隙,使管棚與圍巖固結(jié)緊密,提高鋼管的強(qiáng)度。在拱部超前大管棚注漿預(yù)固結(jié)圍巖的保護(hù)下,進(jìn)行主洞掘進(jìn)施工。

3.2.1管棚參數(shù)

1)長(zhǎng)管棚采用108熱軋無(wú)縫鋼管,壁厚5 mm,管節(jié)長(zhǎng)度4 m~6 m,采用絲扣相接,接頭相互錯(cuò)開。

2)管口段2.0 m鋼管不開孔,其余部分按15 cm間距交錯(cuò)設(shè)置注漿孔,孔徑8 mm,管頭焊成長(zhǎng)度20 cm圓錐形。

3.2.2搭設(shè)鉆孔平臺(tái)安裝鉆機(jī)

1)鉆機(jī)平臺(tái)可用枕木或鋼管腳手架搭設(shè),搭設(shè)平臺(tái)應(yīng)一次性搭好,鉆孔由兩臺(tái)鉆機(jī)由高孔位向低孔位對(duì)稱進(jìn)行,可縮短移動(dòng)鉆機(jī)與搭設(shè)平臺(tái)時(shí)間,便于鉆機(jī)定位。

2)平臺(tái)支撐要著實(shí)地,連接要牢固、穩(wěn)定。防止在施鉆時(shí)鉆機(jī)產(chǎn)生不均勻下沉、擺動(dòng)、位移等影響鉆孔質(zhì)量。

3)鉆機(jī)定位:鉆機(jī)要求與已設(shè)定好的孔口管方向平行,必須精確核定鉆機(jī)位置。用經(jīng)緯儀、掛線、鉆桿導(dǎo)向相結(jié)合的方法反復(fù)調(diào)整,確保鉆機(jī)鉆桿軸線與孔口管軸線相吻合。

3.2.3鉆孔

1)由于粉質(zhì)粘土的特殊性,采用螺旋鉆頭。

2)巖質(zhì)較好的可以一次成孔,鉆進(jìn)時(shí)產(chǎn)生坍孔、卡鉆需補(bǔ)注漿后再鉆進(jìn)。

3)鉆機(jī)開鉆時(shí),可低速低壓,待成孔2 m后可根據(jù)地質(zhì)情況逐漸調(diào)整鉆速及風(fēng)壓。

4)鉆進(jìn)過(guò)程中用測(cè)斜儀測(cè)定其位置、孔深、傾角、外插角,并根據(jù)鉆機(jī)鉆進(jìn)的現(xiàn)象判斷成孔質(zhì)量,及時(shí)處理鉆進(jìn)過(guò)程中出現(xiàn)的事故;鉆進(jìn)過(guò)程中確保動(dòng)力器、扶正器、合金鉆頭按同心圓鉆進(jìn)。

5)做好鉆進(jìn)過(guò)程的原始記錄,對(duì)孔口巖屑進(jìn)行地質(zhì)判斷、描述。做好開挖洞身的地質(zhì)超前預(yù)報(bào),作為指導(dǎo)洞身開挖的依據(jù)。

3.2.4安裝管棚

1)鋼管應(yīng)在專用的管床上加工好絲扣,管棚四周鉆出漿孔,孔徑8 mm,管頭焊成長(zhǎng)度20 cm圓錐形便于入孔。

2)管棚頂進(jìn)采用導(dǎo)向管和鉆機(jī)相結(jié)合的工藝,即導(dǎo)向管控制方向由鉆機(jī)沖擊力頂進(jìn)鋼管。

3)鋼管焊接應(yīng)滿足受力要求,并用30 cm長(zhǎng)套管連接,相鄰鋼管的接頭應(yīng)錯(cuò)開。同一橫斷面內(nèi)的接頭數(shù)不小于50%。

3.2.5注漿

1)注漿漿液采用水泥—水玻璃漿液,以縮短漿液的膠化固結(jié)時(shí)間,控制漿液的擴(kuò)散范圍。

2)水泥漿水灰比1∶1,水泥漿與水玻璃體積比1∶0.5,水玻璃濃

度為35波美度,水玻璃模數(shù)為2.4;注漿孔口壓力初壓0.5 MPa1.0 MPa,終壓1.5 MPa~2.5 MPa。

3)為防止?jié){液從其他孔眼溢出,注漿前在孔口處設(shè)置止?jié){塞,止?jié){塞應(yīng)能承受最大注漿壓力。

4)注漿順序從兩側(cè)拱腳向拱頂,由于巖體孔隙不均勻,考慮風(fēng)鎬環(huán)形開挖的方便,同時(shí)要達(dá)到固結(jié)破碎松散巖體的目的,保證開挖輪廓線外環(huán)狀巖體的穩(wěn)定,形成有一定強(qiáng)度及密實(shí)度的殼體,特別要確保兩側(cè)拱腳的注漿密實(shí)度和承載力,一定要控制注漿終壓(1.5 MPa~2.5 MPa)和注漿量雙控注漿質(zhì)量,拱腳的注漿終壓高于拱腰至拱頂。通過(guò)現(xiàn)場(chǎng)試驗(yàn)確定,本隧道地質(zhì)情況注漿終壓達(dá)到2.3 MPa時(shí),注漿管棚軀殼強(qiáng)度可達(dá)到17.8 MPa。注漿時(shí)相鄰孔眼需間隔進(jìn)行,以確保固結(jié)效果,又達(dá)到控制注漿量的目的。

3.3洞身開挖

隧道洞身采用臺(tái)階法施工,拱部預(yù)留核心土,周邊采用風(fēng)鎬開挖,核心土及中槽運(yùn)用短臂挖掘機(jī)開挖。開挖后架設(shè)工字型鋼架支撐,并進(jìn)行錨噴支護(hù),形成牢固的棚狀支護(hù)結(jié)構(gòu)。開挖嚴(yán)格遵循“管超前、預(yù)注漿、小斷面、留核心、短進(jìn)尺、弱爆破、強(qiáng)支護(hù)、緊封閉、勤量測(cè)、穩(wěn)打穩(wěn)扎、步步為營(yíng)、以防為主、穩(wěn)步前進(jìn)”。

開挖施工順序:

1)超前支護(hù);2)上部環(huán)形開挖;3)上部初期支護(hù);4)核心土開挖;5)下部開挖;6)邊墻及仰拱開挖支護(hù);7)現(xiàn)澆仰拱。

4存在的問(wèn)題及體會(huì)

1)施工長(zhǎng)大管棚開孔是關(guān)鍵,一定要把握好。鉆水平孔時(shí)由于鉆機(jī)本身的自重下?lián)鲜潜厝坏?最好能打試驗(yàn)孔,測(cè)其下?lián)锨€,以便修正外插角。盡量采用粗鉆桿,剛度大下?lián)狭啃 ?/p>

2)施工中應(yīng)考慮每環(huán)管棚留1孔~3孔最后鉆孔但暫不注漿,專門用于排泄圍巖中的滲水,改善前方土體性質(zhì),有利于開挖。

3)長(zhǎng)大管棚施工工藝運(yùn)用于隧道洞口段施工,充分發(fā)揮了管棚支護(hù)作用,增加了施工安全度,提高了隧道的長(zhǎng)期穩(wěn)定性。在管棚支護(hù)下進(jìn)行人工開挖,減小了對(duì)圍巖的擾動(dòng),有效地控制了超欠挖、地表下沉和圍巖坍塌。

4)管棚鉆孔可作為地質(zhì)預(yù)探預(yù)報(bào),地質(zhì)資料可為洞身開挖提供依據(jù)。

參考文獻(xiàn):

[1] 高速鐵路工程測(cè)量規(guī)范 (TB10601-2009) 中國(guó)鐵道出版社.2010年

[2] 葉建延、李林峰.《淺談?dòng)例埶淼拦饷姹啤?華東公路出版社.2010年第2期

第5篇:隧道施工技術(shù)指南范文

關(guān)鍵詞:電廠隧道;下穿公路;施工技術(shù)

一、工程概況

電廠隧道位于云南昆明市晉寧縣境內(nèi)。隧道全長(zhǎng)2025米,起點(diǎn)樁號(hào)為D2K42+930,終點(diǎn)樁號(hào)為D2K44+955.隧道在D2K43+295—D2K43+345段下穿昆玉高速公路。

由于高速公路是昆明和曼谷之間的國(guó)際通道的起始路段,也是國(guó)道213線的重要路段,起始于昆明市官渡去鳴泉村,終于玉溪市高倉(cāng),全長(zhǎng)85.71公里,是云南第一條6車道高速公路。昆玉高速公路的路基寬26.5米,設(shè)計(jì)行車時(shí)速為100公里了。這段高速公路上的車流量已經(jīng)超過(guò)了40000輛/天,而且來(lái)往的重型車輛較多,這導(dǎo)致了地面的動(dòng)載變化大。

隧道穿越該處地質(zhì)為強(qiáng)風(fēng)化砂質(zhì)、泥質(zhì)板巖夾碳質(zhì)板巖,巖質(zhì)較軟,節(jié)理發(fā)育,巖層整合干燥無(wú)水。

二、下穿昆玉高速公路及國(guó)道213施工技術(shù)

一、初步確定施工方案

昆玉高速公路是國(guó)道213公路重要組成部分。為保證施工安全,應(yīng)該根據(jù)具體的地形特點(diǎn),對(duì)撐子面的距離進(jìn)行調(diào)整,同時(shí)要調(diào)整好初期支護(hù)和二次襯砌的距離。

國(guó)道213公路承擔(dān)著極大的車流,所過(guò)車輛中重型汽車占據(jù)著相當(dāng)?shù)谋壤R驗(yàn)槌休d著的重型車較多,而且每日的車流極大,所以該地段的地表動(dòng)荷載很大。故此,加上對(duì)周圍地段圍巖的擾動(dòng)是本次是公的關(guān)鍵。采用“短進(jìn)尺,若爆破,強(qiáng)支護(hù),襯砌緊跟”的施工方法,同時(shí)還要將“光面爆破,支護(hù)緊跟,監(jiān)控量測(cè),及時(shí)反饋修正”作為施工的原則,把隧道工程的進(jìn)展置于動(dòng)態(tài)監(jiān)控之下,及時(shí)而準(zhǔn)確地對(duì)施工過(guò)程進(jìn)行指導(dǎo)。

與此同時(shí),還要注意TSP地質(zhì)雷達(dá)的利用,對(duì)各種地質(zhì)狀況進(jìn)行預(yù)報(bào),以便施工者及時(shí)而精確地了解撐子面的地質(zhì)情況是否與工程的設(shè)計(jì)方案相符合。這樣,就能夠?qū)?yīng)急狀況進(jìn)行有針對(duì)性的處理。

二、優(yōu)化施工方案

原方案的擬定為用大管棚(108×6㎜)配合超前小導(dǎo)管進(jìn)行穿越,并且在撐子面已經(jīng)接近施工段落30米時(shí),技術(shù)人員和相關(guān)的監(jiān)理部門、設(shè)計(jì)部門對(duì)當(dāng)?shù)氐牡刭|(zhì)情況反復(fù)進(jìn)行驗(yàn)證和勘測(cè),最后得出一個(gè)安全的穿越公路的方案。

大管棚的施工過(guò)程相當(dāng)繁重而瑣碎,會(huì)將工程的總進(jìn)度拉慢,所以,經(jīng)過(guò)慎重的考慮和討論,并參照過(guò)去工程經(jīng)驗(yàn),施工方確定了最后的方案。方案據(jù)頂使用雙層的42×3.5㎜超前小導(dǎo)管加固隧道前方拱部的土層。施工范圍在120°,層與層之間的間距為0.4米,兩層之間是相互錯(cuò)開的,錯(cuò)開距離為0.2米。每層的環(huán)向間距為0.4米,每一環(huán)的長(zhǎng)度為4.0米,而搭接的部分長(zhǎng)度在1.0米以上。

除此之外,工程方還將原定的116性鋼的間距0.8米,調(diào)整為0.6米,旨在增強(qiáng)初期支護(hù)的強(qiáng)度。

三、施工的的措施

(一)用超前注漿的方式加固底層

用雙層的42×3.5㎜的超前小管對(duì)隧道前方拱部的土層進(jìn)行加固,施工范圍在120°,層與層之間的間距為0.4米,兩層之間是相互錯(cuò)開的,錯(cuò)開距離為0.2米。每層的環(huán)向間距為0.4米,每一環(huán)的長(zhǎng)度為4.0米,而搭接的部分長(zhǎng)度在1.0米以上。

1.材料:外徑為42㎜,厚度為3.5㎜,長(zhǎng)度為4.0米的熱軋無(wú)縫鋼管。鋼管的前段制成尖錐狀,尾部則焊接上筋箍。這些細(xì)節(jié)保證了超前小管更容易插入巖層中。

2.間距:成與層之間為0.4米,兩層之間互錯(cuò)0.2米,環(huán)向間距為0.4米,每一環(huán)的長(zhǎng)度為4.0米,搭接部分在1.0米以上。

3.外插角:5°到10°。應(yīng)盡量加大外插角以期提高超前小導(dǎo)管的抗彎性。

4.小導(dǎo)管安裝方法:鉆孔打入法,鉆得孔徑大于鋼管的直徑,比之多出3㎜到5㎜。小導(dǎo)管穿過(guò)鋼架后,用錘擊將其頂入,頂入的長(zhǎng)度應(yīng)該在鋼管長(zhǎng)度的90%以上。鋼管中的砂石,用高壓風(fēng)槍吹出。安裝完小導(dǎo)管,空口和周圍的縫隙用塑膠泥進(jìn)行封堵。同時(shí),將混凝土噴射在在小導(dǎo)管的附近地帶和工作面之上,防止工作面在施工過(guò)程中的塌陷。安裝完小導(dǎo)管后,及時(shí)注漿。

5.注漿泥沙技術(shù)標(biāo)準(zhǔn):水泥砂漿。水與灰的比例為75:100,注漿壓力為1兆帕。在這一步驟的實(shí)施過(guò)程中,對(duì)注漿效果進(jìn)行嚴(yán)格的監(jiān)控。

(二)三臺(tái)階法開挖

用三臺(tái)階法進(jìn)行施工,臺(tái)階的高度隨著圍巖的穩(wěn)定性和預(yù)定的開挖寬度而有所變化。但是,臺(tái)階的高度也有著標(biāo)準(zhǔn),其中,上臺(tái)階的高度在4米以下,臺(tái)階的長(zhǎng)度不短于隧道施工技術(shù)指南所給定的最短距離。

由于這段距離內(nèi)的圍巖強(qiáng)風(fēng)化砂質(zhì)、泥質(zhì)板巖夾碳質(zhì)板巖,巖質(zhì)較軟,節(jié)理發(fā)育,巖層整合干燥無(wú)水。泥巖集中在隧道的拱部,砂巖集中在隧道的下部,所以用爆破的方式開挖頂部的泥巖,而用機(jī)械方式開挖下部的砂巖。

在開挖工程實(shí)施過(guò)程中,不放松對(duì)撐子面穩(wěn)定性的觀測(cè),認(rèn)真而嚴(yán)謹(jǐn)?shù)剡M(jìn)行地質(zhì)素描,詳細(xì)記錄施工地區(qū)的圍巖狀況,以便發(fā)現(xiàn)并及時(shí)解決突發(fā)狀況。

(三)用混凝土與鋼架相配合的方式進(jìn)行初期支護(hù)

混凝土封閉工作面之后,即時(shí)掛鋼筋網(wǎng)。這樣能夠使混凝土封閉面和鋼筋網(wǎng)緊密貼合。之后,打設(shè)錨桿,并使錨桿的墊板也同封閉面緊密貼合。另外,對(duì)錨桿的注漿質(zhì)量進(jìn)行嚴(yán)密的控制。在混凝土初次噴射之后,及時(shí)假設(shè)鋼架,在鋼架的外部邊緣以2米的間距噴射混凝土,使之楔緊。

混凝土與鋼架之間的空間用噴射混凝土的方式密實(shí)地填充,以兩者合為一體;混凝土應(yīng)該對(duì)鋼架進(jìn)行全面的覆蓋,而且要保留4厘米以上的保護(hù)層;使用滿焊的手法將錨桿的尾端和鋼架結(jié)合為一個(gè)整體;鋼架用滿焊的方式固定在臺(tái)階與臺(tái)階的交匯之處,并通過(guò)鋼架中注漿進(jìn)行加固拱部,防止拱部的下沉和形變。

派專員進(jìn)行詳細(xì)的檢查,徹底清除下部的松喳,以避免拱腳出現(xiàn)懸空。如果出現(xiàn)滲水,應(yīng)及時(shí)排水。

分段、分片、分層噴射混凝土,按照從上到下的順序交錯(cuò)盡心噴射。

鋼架的鎖腳錨管工程要在開挖仰拱的工程之前結(jié)束。仰拱的開挖是循序漸進(jìn)的過(guò)程,每次開挖的距離都在3米之內(nèi),而且在每次開挖后都當(dāng)即完成初支工作,并通過(guò)初噴及時(shí)進(jìn)行固定。仰拱到撐子面的酒樓在35米之內(nèi),并根據(jù)具體情況縮小距離以防止隧道底部長(zhǎng)時(shí)間暴露在外。

(四)根據(jù)具體情況安排二次襯砌支護(hù)

針對(duì)不同的現(xiàn)場(chǎng)情況,對(duì)二襯和撐子面之間的距離進(jìn)行調(diào)整,盡量將二者距離縮短在60米以內(nèi)。這樣有利于盡快形成一個(gè)完整的受力結(jié)構(gòu)。公路路面以下的部分盡早完成二次襯砌,并及時(shí)開始隧道拱頂?shù)淖{工作。

(五)對(duì)圍巖進(jìn)行監(jiān)控和測(cè)量的內(nèi)容

整個(gè)工程中,不僅對(duì)洞內(nèi)的地表,還要對(duì)洞外的地表進(jìn)行嚴(yán)密的監(jiān)控和測(cè)量。主要監(jiān)控及測(cè)量以下的內(nèi)容:在洞外進(jìn)行觀察;對(duì)洞內(nèi)進(jìn)行地質(zhì)素描;觀察支護(hù)情況;監(jiān)測(cè)水平收斂情況,監(jiān)測(cè)拱頂下沉和路面狀況。

洞外要觀察公路路面、排水設(shè)施,評(píng)估隨到施工受到地面動(dòng)荷載的影響和施工過(guò)程中路面能夠受到的影響。

地質(zhì)素描包括對(duì)圍巖的巖石性質(zhì),巖石的走向,巖石的產(chǎn)狀等各項(xiàng)物理指標(biāo)進(jìn)行描述。洞內(nèi)的地質(zhì)素描則包括了巖石的巖性、產(chǎn)狀、含水量、節(jié)理、穩(wěn)定性等方面。

初期支護(hù)主要對(duì)滲水狀況,開裂狀況等進(jìn)行進(jìn)行觀察和監(jiān)測(cè),并及時(shí)對(duì)異常現(xiàn)象進(jìn)行報(bào)告。

總結(jié):

電廠隧道下穿公路施工技術(shù)在技術(shù)標(biāo)準(zhǔn)之內(nèi)進(jìn)行靈活變通,根據(jù)實(shí)地情況制定了施工方案,并因地制宜,在不同地地段使用不同的技術(shù),不局限于通用標(biāo)準(zhǔn),而是在考察了實(shí)際情況后設(shè)置出自己的標(biāo)準(zhǔn),保證了工程的有效開展。同時(shí),值得借鑒的還有對(duì)檢測(cè)與預(yù)防的重視。工程實(shí)施過(guò)程中,施工方注重監(jiān)測(cè)并合理布置監(jiān)測(cè)點(diǎn),對(duì)特殊情況進(jìn)行充足的預(yù)防,保證工程的順利開展。

參考文獻(xiàn):

第6篇:隧道施工技術(shù)指南范文

了隧道防排水施工技術(shù)。

關(guān)鍵詞:公路隧道防排水;防水板;止水帶;排水管

Abstract: Nanchong Xishan tunnel area belongs to the subtropical humid monsoon climate zone, abundant rainfall, gully gully development, both surface runoff, rainfall by positive influence, with the characteristics of mountain river volume plummeted. Entrance surface gully without stable flow, seasonal changes, the exit section near the Jialing River Three River tributary, perennial water. According to the characteristics of Nanchong Xishan tunnel, combining with the design principles and the actual situation at the scene, the tunnel drainage construction technology.

Keywords: water proof and drainage system of highway tunnel; waterproof board; the waterstop; drainage tube

中圖分類號(hào): S276 文獻(xiàn)標(biāo)識(shí)碼: A

1工程概況

西山隧道工程位于南充市區(qū)西北,進(jìn)、出口分別位于白馬廟村八社和四川蠶絲學(xué)校背后,洞口靠近居民區(qū)有公路相通,交通便利。

西山隧道左線設(shè)計(jì)行車速度60km/小時(shí)。為單向3車道,左線全長(zhǎng)1140m,右線全長(zhǎng)1151。隧道進(jìn)口段設(shè)計(jì)為削竹式洞門,洞口段16m按明洞方式施工,出口段設(shè)計(jì)為端墻式洞門。左線明洞起始里程樁號(hào)為K0+482~K0+498,右線里程樁號(hào)K0+482~K0+633。最大埋深95m,明洞段巖體主要為泥巖,巖層接近水平,受西山下向斜影響,局部存在扭曲、褶皺現(xiàn)象。隧道進(jìn)口地面等高線與線路走向接近垂直,其中進(jìn)口16m段地表覆土較淺(為2~4.5m的強(qiáng)風(fēng)化砂巖)且隧道凈距較小(5~5.9m)。

2 隧道防排水主要措施

隧道防排水遵循“防、堵、截、排結(jié)合,因地制宜,綜合治理”的原則,采取切實(shí)可靠的措施,達(dá)到防水可靠、排水暢通、經(jīng)濟(jì)合理的目的。隧道防排水包括噴射混凝土防水、二次襯砌混凝土防水、截水溝截水、注漿堵水、綜合防排水。

2.1噴射混凝土

噴射混凝土的主要功能是快速封閉巖層,約束圍巖變形,并與圍巖共同作用,防止圍巖失穩(wěn)。同時(shí)具有一定的防水和抗?jié)B功能。

2.1.1混凝土凝結(jié)時(shí)間快使水泥凝結(jié)硬化生長(zhǎng)強(qiáng)度的速度遠(yuǎn)遠(yuǎn)大于混凝土體內(nèi)水份蒸發(fā)排出的速度,從而大大減少了各種孔隙的形成,使水無(wú)孔可通。

2.1.2摻加的防水劑中有與Ca(OH)2起化學(xué)反應(yīng)的生成的膠凝結(jié)晶體的成分。該膠體具有微膨脹性、強(qiáng)度高、不溶于水、能堵塞孔隙,密實(shí)混凝土。

2.2二次襯砌混凝土防水

隧道二襯防水混凝土具有較強(qiáng)的防水能力,并在其中添加抗?jié)B劑,以提高混凝土抗?jié)B能力。隧道抗?jié)B等級(jí)一般應(yīng)達(dá)到P8,在施工過(guò)程中只要振搗密實(shí),比較容易達(dá)到這結(jié)構(gòu)本身的要求。

2.3注漿堵水

主要采用注漿封堵裂隙,隔離水源,堵離水點(diǎn),以較少洞內(nèi)滲水量,對(duì)于不間斷漏水可采用注漿帷幕的形式進(jìn)行治理,注漿采用水泥-水玻璃雙液注漿。

在軟弱圍巖區(qū)域施工時(shí),可采用超前大管棚或超前小導(dǎo)管注漿,以固結(jié)巖層,將大量地下水盡可能封堵在圍巖內(nèi),達(dá)到防水、堵水效果,使隧道開挖時(shí)不出現(xiàn)大量涌水,為隧道后續(xù)施工創(chuàng)造穩(wěn)定條件。

2.4綜合防排水

以排水為主、防排結(jié)合、綜合治理,采用防、排、堵、截相結(jié)合,以形成完整的防排水體系。防水板和止水帶可防、截、堵水,把分散的水引到縱向排水管,橫向排水管將縱向排水管內(nèi)的水引入隧道排水溝內(nèi),減少隧道周邊水壓力,滲水的可能性變小,防止水滲透到襯砌混凝土中。

3西山隧道主要防水措施和施工工藝

3.1無(wú)紡布和防水板施工

防水板是隧道排水系統(tǒng)中重要一環(huán),設(shè)置在隧道初期支護(hù)和二次襯砌之間,防水板將隧道拱部和邊墻的滲水匯集到墻腳的縱向排水管中,再通過(guò)橫向排水溝和深埋水溝排出隧洞外,是處理大面積滲水的最佳途徑。

3.1.1無(wú)紡布、防水板鋪設(shè)前的準(zhǔn)備工作

a .涌水或裂隙水較大的地段,需用排水管將涌水引入邊墻的縱向排水管中。

b.檢查隧道凈空,欠挖部分及時(shí)處理,欠挖量大且?guī)r石堅(jiān)硬部位,采用爆理,欠挖量小且?guī)r石軟弱部位,采用風(fēng)鎬清除,處理后及時(shí)噴混凝土補(bǔ)平。

c.基面的大粒石子及突出的巖石均因處理平整,的錨桿和鋼筋頭應(yīng)割除,不得殘留鋼刺,并用細(xì)石混凝土抹平覆蓋。過(guò)量超挖部位應(yīng)采用掛鋼筋網(wǎng)補(bǔ)噴混凝土回填補(bǔ)齊,使隧道壁盡可能平整。

d.洞內(nèi)一切預(yù)埋件不能超過(guò)防水層,不得已時(shí)需做特殊防水處理。

e.噴射混凝土的厚度和平整度必須滿足設(shè)計(jì)及規(guī)范要求,噴層應(yīng)平整,以保證防水板能緊貼洞壁。

3.1.2無(wú)紡布、防水板鋪設(shè)

a.鋪設(shè)無(wú)紡布:首先用作業(yè)臺(tái)車將無(wú)紡布自拱頂中線向兩邊鋪設(shè),然后用熱帶塑性圓墊圈的射釘將無(wú)紡布固定在噴射混凝土上,拱頂固定間距0.5~0.8m,邊墻0.8~1m,呈梅花型排列。無(wú)紡布鋪設(shè)要松緊適度,使之能緊貼在噴射混凝土表面,避免過(guò)緊被撕裂或過(guò)松形成人為蓄水點(diǎn)。無(wú)紡布幅間搭接寬度應(yīng)大于20cm,且于拱腳處外裹縱向盲管。

b.鋪設(shè)防水板:用作業(yè)臺(tái)車將防水板自拱頂中線向兩邊鋪設(shè),邊鋪設(shè)邊用熱縫焊槍與熱塑性圓墊圈焊接固定。防水板鋪設(shè)要松緊適度,使之能與無(wú)紡布充分結(jié)合并緊貼在噴射混凝土表面。避免過(guò)緊被撕裂或過(guò)松形成人為蓄水點(diǎn)。防水板間搭接處應(yīng)與變形縫、施工縫、圍巖集中出水處等防水薄弱環(huán)節(jié)錯(cuò)開,于墻腳處隨無(wú)紡布一道外裹縱向盲管。

3.1.3防水板接頭處理

防水板搭接:兩幅防水板防水板搭接寬度不小于15cm;焊接前先除盡防水板表面的灰塵。防水板接縫采用自動(dòng)雙縫熱熔焊機(jī)按預(yù)定溫度、速度焊接,每條焊縫的有效寬度為2cm。焊接后兩條縫間留一條空氣道,用于空氣檢測(cè)器檢測(cè)焊接質(zhì)量:先堵住空氣道一端,然后用空氣檢測(cè)器從另一端打氣加壓,直至壓力達(dá)到0.25MPa,保持該壓力不小于15分鐘,允許壓力下降10%。如達(dá)到要求,說(shuō)明完全粘合,否則須用檢測(cè)液(如肥皂水)找出漏氣部位,用手動(dòng)熱熔器焊接修補(bǔ)后再次檢測(cè),直到完全粘合。

3.1.4防水板破損修補(bǔ)

防水板破損處修理:如發(fā)現(xiàn)防水板有破損,必須及時(shí)修補(bǔ)。先取一小塊防水板剪成圓角,除盡兩防水板上的灰塵后,將其置于破損處,然后用手動(dòng)電熱熔接器熔接,熔接質(zhì)量用真空檢測(cè)器檢測(cè),若不合格必須重新修補(bǔ)。

3.2排水管施工

隧道內(nèi)左、右側(cè)路緣帶面層下設(shè)縱向拉通的側(cè)向深埋水溝,縱向每隔 20m設(shè)一座側(cè)向深埋水溝檢查井,水溝尺寸 30cm(寬)×20cm(高)。 隧道防水層和噴射混凝土間設(shè) DN 50HDPE單壁打孔波紋管作為環(huán)向排水盲管(外裹無(wú)紡布) ,縱向間距 10m,當(dāng)滲水量較大或有股水集中流出時(shí)應(yīng)根據(jù)水流大小,增設(shè) 1~3根環(huán)向排水盲管。隧道兩邊墻腳防水層和噴混凝土間各設(shè)一根 DN/ID100HDPE雙壁打孔波紋管作為縱向排水盲管(外裹無(wú)紡布) ,其縱坡與路線縱坡一致。側(cè)向深埋水溝檢查井處設(shè)一道 DN/ID100 HDPE 雙壁無(wú)孔波紋管作為橫向?qū)軐⒖v、橫向排水盲管的地下水引入側(cè)向深埋水溝,橫向?qū)荛g距為 10m。裂隙股水流出外設(shè)環(huán)向打孔單壁波紋管HDPE DN50,管端宜直接與股水流出處相接,直接引入縱向盲管內(nèi)。隧道節(jié)理發(fā)育、地下水豐富地段,可在初期支護(hù)(噴射混凝土層)完成之前視情況埋設(shè)排水半管,形成暗埋,永久式排水通道,將水集中引出。隧道同一斷面只能鋪設(shè)一道排水半管,避免造成初期支護(hù)出現(xiàn)薄弱斷面或薄弱帶。

4 止水帶施工

4.1施工縫

環(huán)向施工縫采用拱墻S型外貼式橡膠止水帶+拱墻S型中埋式橡膠組合防水,縱向施工縫采用S型外貼式橡膠止水帶+中埋式緩膨型遇水膨脹橡膠止水條組合防水,施工縫處先澆混凝土與后澆混凝土界面處涂刷混凝土界面劑(按1.5kg/m2計(jì)量),其主要施工工法如下:

a.外貼式橡膠止水帶安裝

外貼式橡膠止水條采用粘接法與防水層連接。

b.中埋式橡膠止水帶安裝

沿襯砌環(huán)線每隔0.5~1m,在端頭模板上鉆一φ12的鋼筋孔,將制成的φ10鋼筋卡穿過(guò)端頭模板,內(nèi)側(cè)卡緊止水帶的一半,另一半止水帶平靠在端頭模板上,待先澆混凝土凝固后拆除擋頭模,將止水帶拉直,然后彎鋼筋卡緊止水帶,具體先后順序如下:

端頭模板鉆鋼筋孔――固定鋼筋卡――固定止水帶――灌注混凝土――拆除擋頭模板――止水帶水平定位并涂抹混凝土界面劑――立模澆筑后澆混凝土。

c.中埋式遇水膨脹橡膠止水條安裝

底部先澆筑混凝土初凝后,終凝前,在止水條安裝位置壓磨出一條平直,光滑凹槽,待灌注拱墻混凝土前將止水條嵌入凹槽內(nèi)。

4.2變形縫

隧道變形縫按全環(huán)設(shè)置,明洞與隧道分界位置設(shè)置變形縫。變形縫采用B型中埋式鋼邊橡膠止水帶+B型外貼式橡膠止水帶+雙組份聚硫密封膠嵌縫組合防水;兩側(cè)基面設(shè)置聚乙烯泡沫塑料板填縫,聚乙烯泡沫塑料板與雙組聚硫密封膠間設(shè)牛皮紙隔離層。其主要施工工法如下:

a.外貼式橡膠止水帶安裝

外貼式止水帶采用粘接法與防水板連接。

b.中埋式鋼邊止水帶的安裝

沿襯砌環(huán)線每隔0.5~1m,在端頭模板上鉆一φ12的鋼筋孔,將制成的φ10鋼筋卡穿過(guò)端頭模板,內(nèi)側(cè)卡緊止水帶的一半,另一半止水帶平靠在端頭模板上,待先澆混凝土凝固后拆除擋頭模板,將止水帶拉直,然后彎鋼筋卡緊止水帶,具體先后順序如下:

端頭模板鉆鋼筋孔固定鋼筋卡固定止水帶灌筑注混凝土拆除端頭模板止水帶水平定位回填聚苯板立模澆筑后澆混凝土

4.3施工縫、變形縫技術(shù)要求

4.3.1外貼式橡膠止水帶施工技術(shù)要求

橡膠止水帶采用粘接法與防水板連接,不得采用水泥釘穿過(guò)防水層固定。

止水帶縱向中心線應(yīng)與接縫對(duì)齊,誤差不得大于30mm。

止水帶安裝完畢后,不得出現(xiàn)翹邊,過(guò)大的空鼓等部位,以免澆筑混凝土?xí)r止水帶出現(xiàn)過(guò)大的扭曲、移位。

止水帶表面嚴(yán)禁施作混凝土保護(hù)層,應(yīng)確保止水帶齒條與結(jié)構(gòu)現(xiàn)澆混凝土咬合密實(shí);澆筑混凝土?xí)r,止水帶表面不得有泥污、堆積雜物等,否則必須清理干凈,以免影響止水帶與現(xiàn)澆混凝土的咬合密實(shí)性。

4.3.2中埋式橡膠止水帶施工技術(shù)要求

要求牢固可靠,避免澆筑和振搗混凝土?xí)r固定點(diǎn)脫落導(dǎo)致止水帶倒?fàn)?、扭曲,影響止水效果?/p>

仰拱水平設(shè)置的止水帶均采用盆式安裝,盆式開口向上,保證澆搗混凝土?xí)r止水帶下部的氣泡能順利排出。

止水帶除對(duì)接外,其它接頭部位均采用工廠定制接頭,不得在現(xiàn)場(chǎng)進(jìn)行接頭處理;對(duì)接應(yīng)采用熱硫化接頭。

由于仰拱及小邊墻超前施作,小邊墻部分中埋式止水帶應(yīng)高出縱向施工縫15cm,與后澆拱墻內(nèi)中埋式止水帶對(duì)接。

4.3.3中埋式制品型遇水膨脹橡膠止水條施工技術(shù)要求

施工縫表面必須堅(jiān)實(shí)、相對(duì)平整,不得有蜂窩、起砂等補(bǔ)位,否則應(yīng)予清除;止水條任意一側(cè)混凝土的厚度不得小于15cm;止水條與施工縫基面應(yīng)密貼,中間不得有空鼓、脫離等現(xiàn)象;止水條接頭部位采用對(duì)接法連接,對(duì)接應(yīng)密實(shí),不得出現(xiàn)脫開部位;止水條一旦出現(xiàn)破損部位或提前膨脹的部位,應(yīng)割除,并在割除部位重新粘貼止水條。

結(jié)束語(yǔ)

隧道最主要的防排水措施是防排水卷材防水,在施工中保證排水管暢通和防水板的施工質(zhì)量是重點(diǎn);在施工中,防排水工程質(zhì)量必須有專人負(fù)責(zé),有專業(yè)隊(duì)伍施工,并且制定嚴(yán)格的檢查制度??傊琅潘仨毿纬上到y(tǒng),防水板必須防水,排水管必須暢通,將水引向深埋水溝排出洞外。

參考文獻(xiàn)

[1] 中交第一公路工程局有限公司.公路隧道施工技術(shù)規(guī)范[S].北京:人民交通出版社,2009:

第7篇:隧道施工技術(shù)指南范文

【關(guān)鍵詞】:斜井,正洞,富水,挑頂, 施工方法

【 Abstract 】 : Through the introduction of the stone floor 4 # tunnel into the hole is inclined construction method, sums up the weak rock slope safety for rich water into the hole is a kind of construction method for similar engineering large sections loess tunnel construction to provide the reference.

【 Keywords 】 : slope, hole, rich water, pick the top, construction methods

中圖分類號(hào):U655.4文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào):

引言

目前國(guó)內(nèi)特長(zhǎng)隧道施工大多采用長(zhǎng)隧短打的方式,相應(yīng)的設(shè)置斜井開辟新的工作面也成了長(zhǎng)大隧道施工經(jīng)常采用的方法。斜井與正洞交叉地段圍巖受力復(fù)雜,安全隱患大,斜井向正洞施工轉(zhuǎn)換往往是施工中的難點(diǎn)。石樓隧道地質(zhì)復(fù)雜,為Ⅰ級(jí)風(fēng)險(xiǎn)隧道,其中4#斜井承擔(dān)正洞1800m。4#斜井挑頂處圍巖破碎,地下水豐富,施工難度非常大。本文就石樓隧道4#斜井進(jìn)正洞挑頂過(guò)程中總結(jié)出來(lái)的一些方法和體會(huì),進(jìn)行簡(jiǎn)單介紹。

1.概述

石樓隧道為雙線無(wú)砟軌道,隧道長(zhǎng)12800m,其中分為六個(gè)工作面:進(jìn)口、出口、四座斜井。隧道表覆第四系上更新統(tǒng)風(fēng)積層(Q3eol)新黃土,第四系中更新統(tǒng)洪積層(Q2pl)老黃土,第三系(N2)粉質(zhì)粘土,下伏三疊系(T2e)泥巖與砂巖。隧道夾層著三趾馬紅土層(N2),為棕紅色粘土,夾鈣質(zhì)結(jié)核,底部常見砂礫石層。結(jié)構(gòu)致密,呈硬塑狀,屬低液性粘土。在三趾馬紅土之上為中更新統(tǒng)離石黃土(Q2eol),屬淺黃色、褐黃色、粉質(zhì)粘土,夾有數(shù)層古土壤,含鈣質(zhì)結(jié)核,為硬塑狀,結(jié)構(gòu)較致密。隧道區(qū)地下水主要為孔隙潛水及基巖裂隙水,賦存于第四系老黃土、第三系粉質(zhì)粘土及三疊系中統(tǒng)二馬營(yíng)組砂巖、泥巖裂隙及風(fēng)化層中。埋深1.1~190.7m,水位隨季節(jié)變化幅度2~3m。

2.工程概況

石樓隧道四號(hào)斜井井口位于線路左側(cè),與正洞相交于DK231+469.03,平面角度60°,平均坡度為9.3%,斜井長(zhǎng)490米。

斜井與隧道平面關(guān)系圖如下:

圖1斜井與隧道平面關(guān)系

3.施工總體方案

3.1.施工方案

斜井與隧道洞身交叉處為異型斷面跨度大,開挖后引起圍巖應(yīng)力重新分布產(chǎn)生應(yīng)力集中,圍巖受力復(fù)雜多變,且含水率高,易發(fā)生坍塌個(gè)薄弱環(huán)節(jié),必須加強(qiáng)支護(hù)。交叉處施工時(shí),采用短開挖,強(qiáng)支撐,做到步步為營(yíng),穩(wěn)扎穩(wěn)打,保證施工安全。

斜井施工至與正洞交界前6米設(shè)平坡,以圓曲線形式轉(zhuǎn)體進(jìn)入正洞交界處,同時(shí)交界處并立兩榀斜井拱架,留3米核心土,及時(shí)打好仰拱,并繼續(xù)沿相同方向拱頂處掘進(jìn)1.5m寬1高棚洞,斜向上爬至正洞拱頂,(人工施做,每循環(huán)做好初噴,工序要銜接,時(shí)間要緊湊,防止塌方)形成上導(dǎo)標(biāo)準(zhǔn)斷面作業(yè)空間后,按V級(jí)加強(qiáng)施做正洞初期支護(hù)(施工期間用圓木臨時(shí)支撐導(dǎo)洞);然后沿正洞前后方向一榀一榀施做正洞上導(dǎo)初期支護(hù)。

3.2.施工步驟

3.2.1.根據(jù)斜井與正洞相交角度60度,以間距0.5m間距安裝異型鋼架,完成由垂直于斜井中線到平行于正洞中線的過(guò)渡。見(斜井進(jìn)正洞平面圖)

3.2.2.斜井與正洞交叉口段前6m處以0.5m間距架立I20異型鋼鋼架,保證相交地段三維受力狀態(tài)圍巖的穩(wěn)定;每榀鋼架之間由I20工字鋼連接,并加強(qiáng)鎖腳錨管,按1m環(huán)向間距打入自進(jìn)式錨桿。在最后一榀采用兩榀焊接一塊I20型鋼架立,為正洞鋼架提供落腳平臺(tái),施工方法:鋼架兩側(cè)落腳點(diǎn)做30*50cm基礎(chǔ),基礎(chǔ)上預(yù)埋連接件,把鋼架焊接在連接板上,并把鋼架傾斜正洞方向架

圖2斜井進(jìn)正洞平面圖

圖3斜井與正洞立面圖

立,打入超前支護(hù)(雙排);返回來(lái)做80cm厚鋪地。見(斜井與正洞立面圖)所示。以后在此處安裝正洞鋼架。

3.2.3.斜井進(jìn)入正洞內(nèi)的鋼架搭斜井鋼架施工

3.2.3.1.導(dǎo)洞按凈寬最大1.5m,采用人工開挖到正洞拱頂標(biāo)標(biāo)高,用圓木與方木臨時(shí)支撐導(dǎo)洞,開挖正洞上導(dǎo)作業(yè)面后,安裝正洞鋼拱架,各榀鋼架詳細(xì)結(jié)構(gòu)尺寸見鋼架附圖。支護(hù)參數(shù)為:拱墻設(shè)I20型鋼鋼架,間距1榀/0.75m,拱部設(shè)4m長(zhǎng)自進(jìn)式錨桿,間距1.0×0.75m,梅花型布置;φ8鋼筋網(wǎng),網(wǎng)格間距0.2×0.2m;噴射C25砼,厚度25cm。 支護(hù)施工中嚴(yán)格按施工規(guī)范指南操作,保證φ42鎖腳錨管和縱向連接筋的施工質(zhì)量。

3.2.3.2.正洞鋼架搭斜井鋼架時(shí)計(jì)算好正洞鋼架尺寸,預(yù)留30cm,現(xiàn)場(chǎng)施工時(shí)按搭接時(shí)尺寸切割,并在斜井鋼架上用工字鋼焊接平面落腳面,把鋼架用連接板焊接在落腳平臺(tái)上,落腳后加強(qiáng)鎖腳錨管。見圖(正洞鋼架搭斜井鋼架)

圖4正洞鋼架搭斜井鋼架圖

3.2.3.3.完成正洞上導(dǎo)兩榀支護(hù)后,向正洞中線前后方向一榀一榀開挖施做正洞初支,待正洞鋼架落地后及時(shí)成環(huán)仰拱。

3.2.3.4.正洞落底后要及時(shí)進(jìn)行正洞仰拱施工,以便初期支護(hù)與仰拱盡早成環(huán),確保施工安全。

4.安全保證措施

針對(duì)4號(hào)斜井與正洞交叉處主要是砂質(zhì)黃土及含水量較大,存在不安全因素的實(shí)際情況,施工中做好超前支護(hù),防止隧道坍塌,確保施工安全。

任何人進(jìn)洞必須佩戴安全帽和其它防護(hù)用品,接受洞口值班人員檢查,遵章守紀(jì),聽從指揮;同時(shí)加強(qiáng)安全保衛(wèi),禁止閑雜人員進(jìn)入。

施工中發(fā)現(xiàn)隧道內(nèi)有險(xiǎn)情,要立即將工作人員全部撤離危險(xiǎn)地段,工班長(zhǎng)、領(lǐng)工員必須立即在危險(xiǎn)地段設(shè)立明顯標(biāo)志或派人看守,并迅速報(bào)告施工值班人員及時(shí)采取處理措施。

5.預(yù)防坍方的施工方案

5.1.施工過(guò)程中嚴(yán)格貫徹“先治水、短進(jìn)尺、快支護(hù)、勤量測(cè)、緊封閉、早成環(huán)、穩(wěn)中求快”的原則。新黃土開挖一定要留核心土,分臺(tái)階,下部開挖亦要前后錯(cuò)開,先拉邊槽,不宜采用拉中槽的方法,以確保拱腳穩(wěn)定。初期支護(hù)及襯砌工序要及時(shí)跟上,工序間距要盡可能縮小。

5.2.四號(hào)斜井與正洞相交處地層承載力低,黃土地層的承載力都在120~300 kPa之間。因黃土圍巖壁立性好,但拱部范圍地層穩(wěn)定性較差,開挖后拱部垂直荷載較大,而且初期支護(hù)與周邊地層的粘結(jié)力低。型鋼拱架的基座一般直接落在黃土上,在垂直荷載和初期支護(hù)自重的作用下,初期支護(hù)的沉降量較大,一旦外力超過(guò)基底承載力極限,拱腳或墻腳容易失穩(wěn),甚至導(dǎo)致拱頂坍塌,特別是在進(jìn)行下半斷面開挖時(shí),需要采取有效措施,防止拱腳下沉、拱部坍塌。一般可采取如下措施:

5.2.1.盡早施作仰拱、鋪底,使全斷面的初期支護(hù)盡早封閉成環(huán)。

5.2.2.在上斷面初期支護(hù)的拱腳位置設(shè)斜向外側(cè)的鎖腳錨桿,以增強(qiáng)初期支護(hù)的穩(wěn)定性。

5.3.針對(duì)黃土隧道豎向壓力小,側(cè)向壓力大的特性,施工中拱腳邊墻部位的錨桿要加強(qiáng),要注重鋼拱架的連接和鎖定,鋼拱架與巖面要密貼,噴混凝土要密實(shí),要有足夠厚度,從而確保整體受力效果。

5.4.施工中要特別注意用水管理和滲水地段的引排措施,嚴(yán)禁拱腳、墻腳長(zhǎng)時(shí)間受水浸泡。當(dāng)含水量較大且拱腳、拱頂變形量較大時(shí),要及時(shí)采用橫撐、立撐進(jìn)行加強(qiáng),必要時(shí)要采取錨噴加固措施進(jìn)行補(bǔ)強(qiáng)。

5.5.加強(qiáng)坍方的預(yù)測(cè),及時(shí)發(fā)現(xiàn)坍方的可能性征兆,并根據(jù)不同情況采用不同的施工方法及控制坍方的措施,擬采用觀察法、一般量測(cè)法、微地震學(xué)測(cè)量法等方法預(yù)測(cè)坍方。

結(jié)束語(yǔ)

目前石樓隧道4號(hào)斜井已一次性成功挑頂,作者認(rèn)為此挑頂方法適用于富水黃土隧道,工期短、較安全。

【參考文獻(xiàn)】

1.雙線黃土隧道斜井進(jìn)正洞挑頂施工技術(shù)研究《山西建筑》2007年12期

2.大斷面黃土隧道斜井進(jìn)入正洞挑頂施工技術(shù) 《鐵道建筑技術(shù)》2010年 第12期

第8篇:隧道施工技術(shù)指南范文

關(guān)鍵詞:高速鐵路 隧道 水溝電纜槽 一次成型

隨著我國(guó)社會(huì)經(jīng)濟(jì)的全面發(fā)展,國(guó)內(nèi)高速鐵路建設(shè)迫在眉睫。高度鐵路工程施工技術(shù)的不斷發(fā)展促進(jìn)了鐵路工程建設(shè)整體性以及安全性水平提升。隧道電纜溝槽施工與設(shè)計(jì)部分包括三個(gè)方面的內(nèi)容:通信信號(hào)、電力電纜以及排水槽三個(gè)方面。施工要求當(dāng)中一次成型技術(shù)特征讓溝槽走形模板設(shè)計(jì)質(zhì)量更高,為此采用更加科學(xué)的施工技術(shù)具有重要意義。

一、工程概況分析

野火芽隧道從地理位置上看主要位于云貴高原地帶,地形整體呈現(xiàn)出東低西高特征,其中最低點(diǎn)則位于野火芽隧道進(jìn)口的左側(cè)位置。隧道里程D1K1061+375~D1K1063+288,全長(zhǎng)1913m。這其中本文主要對(duì)高速鐵路側(cè)溝電纜槽施工工藝當(dāng)中難點(diǎn)位置影響因素進(jìn)行分析。

圖1.側(cè)溝電纜槽示意圖

工藝分析:傳統(tǒng)工藝技術(shù)角度分析,主要包括三個(gè)方面的內(nèi)容:首先,立側(cè)模。采用混凝土施工方式在排水槽底部施工;其次,立排水槽兩側(cè)模板,混凝土施工在電力電纜以及通信等底部。最后,立電力電纜溝,完成混凝土施工。但是這個(gè)過(guò)程中可以發(fā)現(xiàn)施工步驟無(wú)法有機(jī)連貫起來(lái),出現(xiàn)了混凝土施工縫,這種情況嚴(yán)重形成混凝土結(jié)構(gòu)。

二、模板設(shè)計(jì)

進(jìn)行水溝電纜槽設(shè)計(jì)的一次成型主要結(jié)合移動(dòng)式桁架結(jié)構(gòu)形成模板。這個(gè)過(guò)程中需要充分考慮側(cè)溝電纜槽斷面相對(duì)較小且輪廓線條較多的實(shí)際情況。設(shè)計(jì)應(yīng)當(dāng)更加有助于安裝與拆卸。為此,可以設(shè)計(jì)將溝槽模以及底模合為一體,并對(duì)電纜溝槽采用整體移動(dòng)模板方式的設(shè)計(jì)。如圖2.為整體模板效果。

為了能夠促進(jìn)整體模板移動(dòng),我們還在模板的基礎(chǔ)上進(jìn)行了部分功能上的增進(jìn),通過(guò)使用卷?yè)P(yáng)機(jī)牽引方式完成自行功能。

三、側(cè)溝電纜槽施工

(一)施工技術(shù)轉(zhuǎn)序

在開始施工之前,施工單位需要向監(jiān)理乙級(jí)業(yè)主提出申請(qǐng),進(jìn)行轉(zhuǎn)向下,并將相關(guān)轉(zhuǎn)序資料進(jìn)行完善。主要工作內(nèi)容包括幾個(gè)方面:首先,測(cè)試接地鋼筋電阻情況,標(biāo)準(zhǔn):電阻≤1Ω;其次,對(duì)二襯縱向方向上的排水標(biāo)高等進(jìn)行驗(yàn)收;再次,對(duì)過(guò)軌管道等進(jìn)行驗(yàn)收;最后,對(duì)橫向方向上的排水管標(biāo)高通常情況進(jìn)行驗(yàn)收。

(二)鑿毛處理工序

需要對(duì)矮邊墻、砌邊墻與電纜槽等進(jìn)行鑿毛處理,只有這樣才能夠確保施工滯后電纜槽壁等具有穩(wěn)固性,不會(huì)發(fā)生裂縫或者是脫落現(xiàn)象,并對(duì)施工質(zhì)量造成影響。為此,在施工之前,應(yīng)當(dāng)首先采用風(fēng)鎬對(duì)矮邊墻以及電纜槽等的合面進(jìn)行鑿毛,同時(shí)需要對(duì)基底雜物進(jìn)行清理,最后使用高壓水將鑿毛后邊墻等與基底進(jìn)行沖洗。

(三)測(cè)量放線處理

在側(cè)溝電纜槽施工中,需要對(duì)側(cè)溝電纜槽相關(guān)尺寸以及縱向坡度等進(jìn)行精確性測(cè)量,測(cè)量放樣需遵循標(biāo)高基準(zhǔn)線以及電纜槽側(cè)墻平面定位基準(zhǔn)線。

需要注意的是電纜槽側(cè)墻施工當(dāng)中不能夠侵線,相距中線需≥4.7m。測(cè)量放線過(guò)程中間隔5m放線,施工隊(duì)伍需要結(jié)合現(xiàn)場(chǎng)實(shí)際情況對(duì)變現(xiàn)進(jìn)行點(diǎn)數(shù)控制。

(四)鋼筋安裝處理

首先,是墻角構(gòu)造鋼筋的安裝與處理,針對(duì)前期未進(jìn)行預(yù)埋鋼筋,采取植筋。對(duì)于預(yù)埋鋼筋則進(jìn)行除銹與綁扎。

其次,隧道外側(cè)通信信號(hào)電纜槽鋼筋,主筋采用植筋方式處理,使用沖擊鉆進(jìn)行鉆孔,孔的深度應(yīng)當(dāng)≥30cm;縱向進(jìn)行三根鋼筋的布置。

最后,為了能夠提升水溝電纜槽以及邊墻混凝土兩者之間的連接效果,需要對(duì)襯砌邊墻安裝加強(qiáng)鋼筋提升性能。鋼筋的尺寸以及安裝設(shè)計(jì)都需要結(jié)合實(shí)際,規(guī)范完成。

(五)綜合接地

在進(jìn)行綜合接地方面的施工過(guò)程中主要此阿勇通信信號(hào)電纜槽完成綜合結(jié)構(gòu)鋼筋接地,初支、二襯以及洞室等接地需要與縱向接地鋼筋進(jìn)行連接,接地間隔為100m。

初支以及二襯的接地應(yīng)當(dāng)形成環(huán)設(shè)計(jì),兩者的橫向引入不能夠在相同里程當(dāng)中,但是需要在布局的過(guò)程中更加美觀。具體可見圖3.

圖3

(六)過(guò)軌管

首先,采用專業(yè)過(guò)軌線以及通信管線進(jìn)行電纜槽連接,電力專業(yè)過(guò)軌管彎曲能夠進(jìn)入到電力電纜槽當(dāng)中,引入部分應(yīng)當(dāng)≥150cm。

其次,各個(gè)過(guò)軌管線的管口應(yīng)當(dāng)進(jìn)行磨光,確保電纜能夠安全,過(guò)軌管線需在電纜槽露頭,管口設(shè)堵頭,并采用冷封膠進(jìn)行封堵,避免出現(xiàn)滲水情況。

(七)橫向排水

雙側(cè)溝在與中細(xì)膩之間進(jìn)行溝通過(guò)程中采用橫向?qū)Ч軐?duì)兩者進(jìn)行連接,結(jié)構(gòu)采用Φ110的135°彎通,對(duì)排水管進(jìn)行位置設(shè)計(jì),其距離底溝應(yīng)當(dāng)保持在23cm以上。并在此基礎(chǔ)上采用井字形鋼筋進(jìn)行固定。結(jié)構(gòu)情況如下圖4.

圖4

(八)縱向排水

在施工中,縱向或者是環(huán)向的排水管接頭應(yīng)當(dāng)采取方形模板進(jìn)行固定處理,具體如圖5:

圖5

該圖中雙側(cè)的二襯邊墻應(yīng)當(dāng)對(duì)盲管區(qū)域以及盲管出口區(qū)域進(jìn)行預(yù)留設(shè)計(jì),管底標(biāo)高設(shè)計(jì)也應(yīng)當(dāng)預(yù)留25cm??v向盲管需要采用Φ150的排水管完成連接,并使用填充層井字形缸徑,橫向方面的設(shè)計(jì)應(yīng)當(dāng)采用鋼筋進(jìn)行固定。

(九)泄水孔設(shè)計(jì)

電力電纜槽以及通信信號(hào)電纜槽和側(cè)溝排水槽等之間應(yīng)當(dāng)形成預(yù)留,這其中泄水槽主要寬度應(yīng)當(dāng)達(dá)到4cm、高度以及縱向距離分別達(dá)到2-3cm、3-5cm。

(十)模板布置

1.依據(jù)測(cè)量放樣結(jié)果,對(duì)最外側(cè)模板相關(guān)位置情況進(jìn)行確認(rèn);

2.模架移動(dòng)就位后需要對(duì)位置進(jìn)行調(diào)整;

3.通過(guò)在懸吊模板當(dāng)中進(jìn)行橫向移動(dòng)完成對(duì)平面位置上的調(diào)整,并使其能夠符合設(shè)計(jì)要求。通過(guò)擰動(dòng)絲桿螺帽調(diào)試標(biāo)高;

4.安裝定位卡的時(shí)候,需要擰緊定位螺栓,并確保模板被固定好。這個(gè)過(guò)程中,需要將最外側(cè)模板線作為主要依據(jù),并以此作為根據(jù)將相關(guān)尺寸進(jìn)行調(diào)整。對(duì)于調(diào)整好的模板可以采用水平尺進(jìn)行檢驗(yàn),這其中控制側(cè)溝電纜槽至關(guān)重要。

5.安裝當(dāng)頭模板并對(duì)模架進(jìn)行固定。

(十一)接地端子處理

在模板安裝徹底完成之后,還需要進(jìn)行預(yù)埋接地端子以及接地鋼筋。

1.對(duì)隧道進(jìn)口2m位置開挖,并在雙側(cè)通信信號(hào)電纜槽底端以及側(cè)邊進(jìn)行接地端子布置。接地端子在與貫通地線之間形成連接,距離為100m。詳細(xì)內(nèi)容可見圖6.

2.對(duì)隧道進(jìn)口2m的位置進(jìn)行開發(fā),并在雙側(cè)通信信號(hào)電纜槽貼近線路壁方向上進(jìn)行接地端子設(shè)置,間隔為50m。

圖6.接地端子間隔布置

(十二)施工縫處理

溝槽分段施工接頭處在側(cè)溝周邊設(shè)一道遇水膨脹止水條進(jìn)行防水處理,變形縫采用外貼式橡膠止水帶+中埋式鋼邊橡膠止水帶+嵌縫材料進(jìn)行防水處理。變形縫與二襯變形縫對(duì)齊,每30米設(shè)一道。

四、側(cè)溝電纜槽技術(shù)處理認(rèn)識(shí)

首先,應(yīng)當(dāng)增強(qiáng)側(cè)溝電纜槽設(shè)計(jì)模板直度方向控制,這是因?yàn)橹倍仁蔷€性影響因素中的關(guān)鍵內(nèi)容。

其次,在進(jìn)行施工的過(guò)程中,電纜槽槽身應(yīng)當(dāng)能夠通過(guò)多種方式進(jìn)行預(yù)埋,并還需對(duì)預(yù)埋管線進(jìn)行聯(lián)通。

再次,確保凈寬,為了能夠防止出現(xiàn)電纜槽槽身上發(fā)生混凝土模板變形情況,需要對(duì)模板定位進(jìn)行移動(dòng),為此將模板直度以及相關(guān)厚度等尺寸控制在范圍內(nèi)。

另外,側(cè)溝電纜槽施工前,技術(shù)人員要對(duì)綜合接地鋼筋的焊接和引出情況、接地端子預(yù)埋數(shù)量、位置,接地電阻等進(jìn)行檢查,全部合格后方可澆筑混凝土。

結(jié)語(yǔ):

綜上所述,本文當(dāng)中形成的有關(guān)水溝電纜槽方面的設(shè)計(jì)內(nèi)容能夠有效性解決一次性施工要求的問(wèn)題,促進(jìn)結(jié)構(gòu)的靈活性,便于技術(shù)操作與人力資源成本降低。更加有助于促進(jìn)傳統(tǒng)施工技術(shù)當(dāng)中對(duì)斷縫和爛根等方面的質(zhì)量問(wèn)題解決。除此之外,本文針對(duì)電纜擦施工工藝的一次性成型內(nèi)容進(jìn)行完善,并對(duì)其中液壓走形方面的問(wèn)題進(jìn)行技術(shù)難點(diǎn)分析,通過(guò)結(jié)合實(shí)踐內(nèi)容進(jìn)一步解決了其中存在的不足與問(wèn)題。

參考文獻(xiàn):

[1]孫引浩,高原長(zhǎng)大隧道水溝電纜槽組合式模具施工技術(shù)[J]中國(guó)鐵路,2014 (1) : 70 -73.

[2]徐小軍,鷹鸚山隧道邊溝電纜槽整體澆筑設(shè)計(jì)與施工[J]山西建筑,2011(16):117-118.

[3]《高速鐵路隧道工程施工技術(shù)指南》北京:中國(guó)鐵道出版社,2011

[4]中鐵第二勘察設(shè)計(jì)院,野火芽隧道施工設(shè)計(jì)圖,成都:2010

第9篇:隧道施工技術(shù)指南范文

關(guān)鍵詞 : 模擬函數(shù)回歸分析處理軟件實(shí)例體會(huì)

Abstract: the processing of the data ShiGongLiang tunnel through certain function model, the mathematical change the least square method to determine the linear regression equation principle, and from the tunnel deformation function expression, and then out Microsoft Excel electronic form processing software drawing, verification and a calculation module, reduce the complexity of the calculation of the lock, accurate is simple, so as to guide the construction.

Keywords: simulation function regression analysis processing software example experience

中圖分類號(hào):U672.7+4 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):

1前言

隧道施工監(jiān)測(cè)是在隧道開挖過(guò)程中使用量測(cè)儀器和工具對(duì)圍巖變化情況和支護(hù)的工作狀態(tài)進(jìn)行量測(cè),是及時(shí)提供圍巖穩(wěn)定程度、支護(hù)結(jié)構(gòu)可靠性和安全性、預(yù)見事故和險(xiǎn)情等信息的重要手段,同時(shí)通過(guò)對(duì)各種量測(cè)數(shù)據(jù)的回歸分析能及時(shí)調(diào)整和修改支護(hù)設(shè)計(jì)(動(dòng)態(tài)設(shè)計(jì))的依據(jù),亦依據(jù)量測(cè)結(jié)果確定施作二次襯砌的最佳時(shí)間[1]、 [6]。

回歸分析法的應(yīng)用十分廣泛,在醫(yī)藥、航空、水利、地基處理等方面有著非常重要的實(shí)際意義和指導(dǎo)作用。本文是針對(duì)隧道量測(cè)數(shù)據(jù)進(jìn)行的回歸分析,通過(guò)建立特定的函數(shù)模型,利用計(jì)算機(jī)處理技術(shù),求得隧道在特定的圍巖特定的施工工藝、特定的支護(hù)方法下的隧道變形函數(shù),與大家共勉。

2基本原理

回歸分析法是在掌握大量觀察數(shù)據(jù)的基礎(chǔ)上,利用數(shù)理統(tǒng)計(jì)方法建立因變量與自變量之間的回歸關(guān)系函數(shù)表達(dá)式(稱回歸方程式)[2]。通常,線性回歸分析法是最基本的分析方法,常用最小二乘法原理來(lái)確定直線回歸方程,但隧道量測(cè)數(shù)據(jù)是非線性回歸問(wèn)題,必須借助數(shù)學(xué)手段轉(zhuǎn)化為線性回歸,最后轉(zhuǎn)化成隧道變形函數(shù)[3]。

2.1一般地,設(shè)x與y具有相關(guān)關(guān)系的兩個(gè)變量,且相應(yīng)于n組觀測(cè)值的n個(gè)點(diǎn)(xi,yi),i=1,2,…,n),大致分布在一條直線的附近,求在整體上與這n個(gè)點(diǎn)最近的一條直線。設(shè)所求直線的方程為:y=bx+a……………………①

其中a、b是待定的參數(shù)

方程①為回歸直線方程,相應(yīng)的直線為回歸直線[4]。

2.2對(duì)于變量y與x的一組觀測(cè)值的線性相關(guān)性檢驗(yàn)一般采用相關(guān)系數(shù)和標(biāo)準(zhǔn)差來(lái)判斷。相關(guān)系數(shù)r的表達(dá)式如下:

………………………②

|r|≤1當(dāng)|r|越接近于1,相關(guān)程度越大,即實(shí)測(cè)值與觀測(cè)值越接近;當(dāng)|r|越接近于0,相關(guān)程度越小[5]。

2.3確定隧道圍巖變形所選函數(shù)是否合適用標(biāo)準(zhǔn)差來(lái)判定,標(biāo)準(zhǔn)差s的表達(dá)式如下:

……………………③

ui測(cè)、ui理分別是實(shí)測(cè)值和回歸值,如果有95%的點(diǎn)在誤差范圍內(nèi),可滿足精度的要求[7]、[8]。

3隧道圍巖變形函數(shù)的設(shè)定

某隧道某斷面量測(cè)記錄進(jìn)行整理不難發(fā)現(xiàn),從隧道的累計(jì)變形量(y)與時(shí)間(t)曲線圖,能確定累計(jì)變形量(y)與時(shí)間(t)的關(guān)系是一種指數(shù)函數(shù)的關(guān)系[9]。有如下特點(diǎn):

隨著時(shí)間的延長(zhǎng),累計(jì)變形隨之增大,且趨向某一固定的值;

利用Microsoft公司推出的Excel電子化表格處理軟件,選取一種最接近于現(xiàn)有圖表的線型(Excel提供了6種常用的趨勢(shì)預(yù)測(cè)曲線),創(chuàng)建圖型。由此可以直觀地看出,數(shù)據(jù)之間的變化趨勢(shì)呈指數(shù)函數(shù)的關(guān)系。

因此可設(shè)定隧道圍巖累計(jì)變形函數(shù)為:

U=A×eB/t………………………………………………………④

④式中U:隧道某一斷面的累計(jì)變形量(mm);

A:特定參數(shù),回歸預(yù)測(cè)最變形量(mm);

B:特定參數(shù);

t:量測(cè)時(shí)的時(shí)間(d―天)。

對(duì)④式取自然對(duì)數(shù)得:

lnU =lnA+B/t

令y= lnU ;a= lnA ;b=B;x=1/t

則有:y=a+bx即①式。

根據(jù)①式依次求出x、y、b、a值,再換算A、B值,最后求出④式。

計(jì)算相關(guān)系數(shù)驗(yàn)證y與x相關(guān)程度,如果接近1,說(shuō)明回歸直線假定成立,否則不成立[10]。

根據(jù)方程④,可以計(jì)算同一斷面同一時(shí)間隧道累計(jì)變形的理論量,然后將理論與同實(shí)際量測(cè)值進(jìn)行比較,計(jì)算標(biāo)準(zhǔn)差s的值,如有95%的點(diǎn)有誤差范圍內(nèi),說(shuō)明所選函數(shù)合適,否則不合適,需重新修正。

4幾點(diǎn)體會(huì)

4.1隧道圍巖的變形量測(cè)數(shù)據(jù)必須真實(shí)可靠,詳細(xì)記錄當(dāng)時(shí)的時(shí)間、天氣、溫度、采用的量測(cè)儀器、圍巖級(jí)別、隧道埋深、支護(hù)方式、施工方法(如上下斷面或斷面)、記錄復(fù)核人員等,以便分類分析;

4.2如果采用U=A+Bln(t+1)函數(shù)形式,相關(guān)系數(shù)為0.9434,小于采用指數(shù)函數(shù)形式的相關(guān)系數(shù)0.9776,這里恕不說(shuō)明。因此,模擬函數(shù)一般采用指數(shù)函數(shù)較為合適,但不拘于采用對(duì)數(shù)、雙曲函數(shù),對(duì)于各種函數(shù)都可建立相應(yīng)的Excel模塊,計(jì)算時(shí)只輸入當(dāng)日變形量,由計(jì)算機(jī)自動(dòng)繪圖、計(jì)算、驗(yàn)證和比較,確定函數(shù)模型,簡(jiǎn)單方便,提高效率;

4.3建立信息反饋系統(tǒng),一方面有利于對(duì)實(shí)測(cè)數(shù)據(jù)的核對(duì),另一方面有利于動(dòng)態(tài)設(shè)計(jì),及時(shí)掌握施工情況,采取相應(yīng)措施,指導(dǎo)施工。

4.4量測(cè)所得到的信息目前可通過(guò)理論計(jì)算和經(jīng)驗(yàn)方法兩種途徑來(lái)實(shí)現(xiàn)反饋,由于巖體結(jié)構(gòu)的復(fù)雜性和多樣性,在理論上做了近似和簡(jiǎn)化,參數(shù)不易取得。所以當(dāng)前廣泛采用“經(jīng)驗(yàn)”(調(diào)研和必要的理論分析)建立一套判斷準(zhǔn)則來(lái)實(shí)現(xiàn)反饋。

5結(jié)論

5.1相關(guān)系數(shù)r非常接近1,該數(shù)值以定量的方式表示出時(shí)間x與變量y呈現(xiàn)的正相關(guān)關(guān)系及相關(guān)程度(1表示直線關(guān)系),通過(guò)相關(guān)系數(shù)檢驗(yàn)后,便可確定構(gòu)建的數(shù)學(xué)模型y=a+bx成立。

5.2計(jì)算標(biāo)準(zhǔn)差s=3.758,2s=7.517,通過(guò)實(shí)測(cè)與理論值的比較,有100%的點(diǎn)在誤差范圍內(nèi),大于95%說(shuō)明設(shè)定的指數(shù)函數(shù)合適。

5.3由回歸計(jì)算知,圍巖收斂變形最終值為79.26(mm),圍巖單側(cè)變形值為39.63(mm)。

參考文獻(xiàn):

[1] 葉陽(yáng)升,王紅.鐵道建筑[M].北京:鐵道建筑雜志編輯部,2011.

[2] 朱永全,宋玉香.隧道工程[M].北京:中國(guó)鐵道出版社,2005.

[3] 劉山洪,劉毅,李放.石龍山隧道新奧法施工圍巖變形監(jiān)測(cè)研究[J].重慶交通大學(xué)學(xué)報(bào):自然科學(xué)版,2008,27(1):44―48,156.

[4] 王建宇。隧道工程監(jiān)測(cè)和信息化設(shè)計(jì)原理[M].北京:中國(guó)鐵道出版社,1990.

[5] 周亦濤,薛曉輝,王勝濤,等.雙線隧道現(xiàn)場(chǎng)監(jiān)控量測(cè)數(shù)據(jù)分析[J].國(guó)防交通工程與技術(shù),2007(3):26―28.

[6] TL 204--2008鐵路隧道工程施工技術(shù)指南[s].北京:中國(guó)鐵道出版社,2008:8l一82.

[7] TB 10204--2002鐵路隧遂施工規(guī)范[s].北京:中國(guó)鐵道出版社,2002:124―129.

[8] JTJ 042―94公路隧道施工技術(shù)規(guī)范[s].北京:人民交通出版社,1995.

相關(guān)熱門標(biāo)簽